Page No. 1 ISS_CM_019 (Rev 01/2011) Sponsoring Org/Office Code: MIO/OC Name of Forum: POIWG Date: 07/27/2011 Increment Manager/Melissa Owens Increment.

Slides:



Advertisements
Similar presentations
1 Architecture and Planning Strategies for Addressing Radiation, Space Weather, and Space Climatology Impact on NASA Missions Study Sponsor - NASA Office.
Advertisements

Line Efficiency     Percentage Month Today’s Date
Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold.
Transition to 6-person crew ASE conference, Praha Oct 8, 2009 Andreas Schön, ESA All dates used in this presentation are examples only, they do not necessarily.
A need exist to define & establish Consumer replacement services and Technology to replace absolute technology to enable automation of all existing manual.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Soyuz 2 Unmanned satellite; met target in orbit. Soyuz 3 Manned space craft moved to within 650 feet of Soyuz 2.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
GRC/OZ Monthly Tag Up – 1 Glenn Research Center Monthly ISS Payload Ops Review ISS Payload Integration, Planning & Operations July 26, :30 AM EST.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
Need for Commercial Cargo to ISS William Gerstenmaier NASA Associate Administrator for Space Operations FAA Commercial Space Transportation Advisory Council.
NASA Advisory Council Space Operations Committee July 10, 2008 Glenn Research Center.
Page 1 TESLA Upcoming Events / Advanced Category / 23,000’
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 21 & 22.
Page No. 1 ISS_CM_019 (Rev 01/2011) POIWG – July 2014 Increment 43/44 Overview.
Payloads Operations Integration Working Group (POIWG) Increments 27 and 28 Payloads Programmatic Status January 25-27, 2011 Keith Beckman Increment Payload.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Approved for Public Release; Distribution is Unlimited Ricardo Rodriguez.
Sponsoring Org/Office Code: VIPER Office / OM3 Name of Forum: POIWG Date: 07/21/2014 Significant ISS Attitude Events 06/ /2015 Presenter: Jose Ruiz.
POIWG 1/26/2015 Mana Vautier This presentation is intended solely for the audience to which it is directed. MISSION AND PROGRAM INTEGRATION (MAPI)
Page No. 1 Sponsoring Org/Office Code: MIO/OC Name of Forum: POIWG Date: 01/29/13 Increment Manager/Ben Pawlik Increment Engineer/Maria Baugh-Horstman,
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
I29/30 Robonaut Training Strategy Team (TST) Mike Joseph Robonaut Training Coordinator Notice: Material contained.
1 International Space Station Program Mission Integration & Operations Increment 19_20 Overview POIWG 22 July 2008 OC/Increment Engineer Karen Alfaro.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Cindy Grant SPACE-X & Orbital Lead POD Office/EO
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April 2013.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST.
Page No. 1 ISS_CM_019 (Rev 09/2011) Pre-decisional, For Internal Use Only Payload Integration Template ISS-SRB-RSP-017 Date: January 28, 2014 Presenter’s.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increments
Page No. 1 ISS_CM_019 (Rev 01/2011) Increment 49/50 Overview POIWG – January 2016 IDM/Kevin Hames LIS/Vic Cooley POM/Becky Grimaldi This document contains.
Page No. 1 ISS_CM_019 (Rev 09/2011) Pre-decisional, For Internal Use Only Payload Safety Review Panel (PSRP) Process Updates/Status International Space.
Page No. 1 ISS_CM_019 (Rev 01/2011)OC3/Stephanne Ploeger/ Page No. 1 ISS_CM_019 (Rev 01/2011) POIWG – July 2013 Increment 37_38 Overview.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations.
CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug-2015
Jan 2016 Solar Lunar Data.
Suggestion to update Work Plan for IEEE m Standard
Timeline Roadmap Template
High Street Streetscape Improvement Project
SmartMeterTM Steering Committee Update – September 2012
Average Monthly Temperature and Rainfall
<Location> – <Project Name>, Sponsor: <name>
80-Hour SHARP Certification Course Schedule
Self-Insurance Application Schedule – Key Dates*
SmartMeterTM Steering Committee Update – March 2013
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Investigation X – Increment 33 & 34 Scenario (it’s only a template)
SmartMeterTM Steering Committee Update – June 2012
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Rev. 5 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY SERVICE PROVIDER JUN JUL AUG SEP OCT NOV DEC JAN.

Rev. 5 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY SERVICE PROVIDER JUN JUL AUG SEP OCT NOV DEC JAN.
SmartMeterTM Steering Committee Update – July 2012
SmartMeterTM Steering Committee Update – February 2013
SmartMeterTM Steering Committee Update – November 2012
DSC ChMC CSS Consequential Update 13th March 2019
Safety Group Program Timeline
Omnibus IV Contract Overview Elieen Emond Contract Specialist
Ctclink executive leadership committee May 31, 2018
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Rev. 5 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY SERVICE PROVIDER JUN JUL AUG SEP OCT NOV DEC JAN.
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Safety Group Program Timeline
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
16:00 on Mon 8 Jul 2019 (GMT 189) To 16:00 on Tue 9 Jul 2019 (GMT 190)
2013 Safety Group Advantage Program Timeline
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Presentation transcript:

Page No. 1 ISS_CM_019 (Rev 01/2011) Sponsoring Org/Office Code: MIO/OC Name of Forum: POIWG Date: 07/27/2011 Increment Manager/Melissa Owens Increment Engineers/Jill Holm, Maria Baugh-Horstman, David Bach Increment 31 & 32 Overview POIWG Face-to-Face July 2011

Page No. 2 ISS_CM_019 (Rev 01/2011)OC3/M. Owens/x48025 OC/Increment 31 & 32 Management Team The Increment 31& 32 Team – Melissa Owens – Increment Manager – – Jill Holm – Increment Engineer – – Maria Baugh-Horstman – Increment Engineer – – David Bach – Increment Engineer – – Nancy Monsees – IDRD Book Manager – NASA Visiting Vehicle / Cargo POCs – Eugene Schwanbeck – ATV3 – – Elizabeth Blome – HTV3 – – Doug Rarick – Space-X – – Floyd Booker - Orbital – – Mike Hoy – Russian Vehicles –

MRM1 MRM2 SM Aft N2 Nadir Inc 30 Inc 33 FE-1 – A. Shkaplerov FE-2 – A. Ivanishin CDR – D. Burbank 3/16 28S Undock ATV3 28S Apr 12 Mar 12 May 12 Jun 12 Jul 12 Aug 12 Updated 19 July 2011 (16-Mar) 5/16 29S Undock Sep 12 Stage 30-6Stage 31-6 (47 Days) FPWG SSCN and IDRD Release /21/11 Stage 32-6 (109 Days) E31 FE-1 /E32 CDR - G. Padalka (45/170) (125/170) E31/E32 FE-2 – S. Revin (45/170) (125/170) E31/E32 FE-3 – J. Acaba (45/170) (125/170) E 31 CDR – O. Konoenko (61/166) E 31 FE-5 – A. Kuipers (61/166) E 31 FE-6 – D. Pettit (61/166) E 32 FE-4 – Y. Malenchenko (109/168) E 32 FE-5 – S. Williams (109/168) E 32 FE-6 – A. Hoshide (109/168) Dock 1-Jun 31S 30S 1-Apr 29S 16-May 48P 27-July 24-Apr 09 Jul Berth 04 Aug Unberth 6/1 31S Dock 4/1 30S Dock Increment 31Increment 32 Stage 31-3 (15 Days) Stage 32-3 (15 Days) 29 Soyuz Crew Pettit Kuipers Kononenko 30 Soyuz Crew Acaba Revin Padalka 31 Soyuz Crew Hoshide Williams Malenchenko 9/18 30S Undock Vehicle Traffic SpX-2 14 Apr Berth 13 May Unberth N2 Zenith 17-Aug Berth Orb-2 15 Sep Unberth 4 Jun Berth Orb-1 04 Jul Unberth SpX-3 DC-1 47P 46P 27-Apr 18-Sep US EVA #18 RS EVA #32 27-Aug 19-Mar 24-July RS EVA #31 HTV3 8 Apr Unberth Orb-D1

Page No. 4 ISS_CM_019 (Rev 01/2011)OC3/M. Owens/x48025 Increment 31 & 32 Overview Crew Assignments – E31 CDR – Oleg Kononenko (RSA) – E31 FE5 – Andre Kuipers (NASA/ESA) – E31 FE6 – Donald Pettit (NASA) – E31 FE1/E32 CDR – Gennady Padalka (RSA) – E31/E32 FE2 – Sergey Revin (RSA) – E31/E32 FE3 – Joseph Acaba (NASA) – E32 FE4 – Yuri Malenchenko (RSA) – E32 FE5 – Sunita Williams (NASA) – E32 FE6 – Akihiko Hoshide (NASA/JAXA) Increment 31 Duration – 61 days – 28S Undock – 16 Mar 2012 – 30S Dock – 01-Apr-2012 increase to 6 crew – 29S Undock – 16 May 2012 Increment 32 Duration – 125 days – 29S Undock – 16 May 2012 – 31S dock – 01-Jun 2012 increase to 6 crew – 30S Undock – 18 Sept 2012 Major Traffic Events [Dock – Undock] per FP CR currently in the review cycle –ATV3 [19-Mar-2012 – 27-Aug-2012] –Orbital 1 [04-Jun-2012 – 04-Jul-2012] –Space-X 2 [14-Apr-2012 – 13-May-2012] –Space-X 3 [09-Jul-2012 – 04-Aug-2012] –Orbital 2 [17-Aug-2012 – 09-Sep-2012] –Progress cargo ops >46P undock >47P dock/undock >48P dock Other Dynamic Events –RS EVA #31 –Mount and connect the Plasma Wave System Unit. –Launch Spherical Test Satellite –RS EVA #32 –To route MLM cables. –R&R cameras and lights –Perform digital imagery of radiators –US EVA #18 –To route MLM cables.

Page No. 5 ISS_CM_019 (Rev 01/2011)OC3/M. Owens/x48025 Increment 31 & 32 Known Vehicle Traffic Changes and Crew Time Status Known vehicle traffic changes that will be incorporated during the CR process 28S undock / Start of Increment 31 moves to 14-Mar-12 30S undock / End of Increment 32 moves to 12-Sep-12 Space-X 1 moves to 14-Apr-12 – 13-May-12 Space-X 2 moves to 09-Jul-12 – 04-Aug-12 Space-X 3 moves to Increment 33 Final HTV-3 dock date in review, expected to move to ~May 2012 Program emphasis on completing average of 35 hours of utilization per week has been elevated Crew and vehicle safety remain the highest priority Requirement for utilization has been elevated in priority in the baseline IDRD CR out for review. Based on the MIOCB recommendation for the Inc 29 & 30 IDRD Rev A, utilization has been elevated above visiting vehicle traffic other than Soyuz (crew) arrivals and departures Crew Time Working Group (CTWG) is working generic crew time updates to support average 35 hours per week for utilization Inc 31&32 current vehicle traffic provides a greater challenge for meeting that requirement; assessment on-going to determine impacts / risks, particularly in the area of cargo ops

Page No. 6 ISS_CM_019 (Rev 01/2011)OC3/M. Owens/x48025 Utilization Crew Time Allocations Utilization Allocation per SSCN Total crew time allocated to utilization (USOS) – 896 hours

Page No. 7 ISS_CM_019 (Rev 01/2011) IDRD for Increments 31 and 32 Milestone Schedule Baseline SSCN Released:07/21/11 Evals Due:08/11/11 TCM:08/23/11 Doc In DQA (2 wks):08/29/11 MIOCB:09/15/11 Revision (SORR) Call for Inputs:10/11/11 Inputs Due:10/25/11 Release:11/01/11 Prel. OOS TIM11/07/11 (2 wks) Thanksgiving:11/24/11 IOR:12/06/11 Evals Due:12/06/11 TCM:12/13/11 Doc. In DQA:12/19/11 (2 wks) Christmas (observed):12/26/11 New Years (observed): 01/02/12 MIOCB:01/19/12 Final OOS TIM:01/30/12 (2 wks) SORR (est.):02/21/12 Start of Inc 31:03/16/12