AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007.

Slides:



Advertisements
Similar presentations
F.R.Spada – INFN Rome I The TRD of AMS-02 on the International Space Station Francesca Spada University of Rome La Sapienza & INFN Rome I for RWTH Aachen,
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
AMS Software Review ACC Slow Control Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
May 4, 2004Bill Wisniewski1 Installation Review. May 4, 2004Bill Wisniewski2 Charge ( W. Althouse, G. Bowden, W. Innes(chair), J.Weisend, (D. Nelson))
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
AMS Cabling CERN Prevessin 893-1D020 December 6, 2006 Agenda 1) Brief overview -Show Plumbing and VC ring-mounted-hardware -AMS overall -Common.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
AMS Tracker Data Reduction Status Claude Zurbach Laboratoire de Physique Théorique et Astroparticules – Montpellier Houston, AMS-TIM, January 08, 2007.
The AMS Transition Radiation Detector and the Search for Dark Matter Gianpaolo Carosi Lab for Nuclear Science, MIT The AMS Collaboration Lake Louise Winter.
1 PEBS Prototype PERDaix was launched in October 2010 from Kiruna, Sweden.
A.Ostaptchouk AMS Meeting at CERN, 16 July Measurements of Octagon Walls with 3D CMM Characteristics of 3D CMM Measurement program Results of insert.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
PHENO 2010 Christopher White, IIT 1 The Daya Bay Reactor Antineutrino Experiment Christopher White 1.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Anatoli Romaniouk TRT Introduction TRT in ATLAS p. 2-4TRT in ATLAS p. 2-4 TRT design p. 5-7TRT design p. 5-7 TRT operation principles p. 8-9TRT operation.
TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.
Estimates of GEM chamber costs for the Solenoid spectrometer.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
AMS TRD meeting Electronics 17th July 2002, CERN G. Schwering: Overview M. Capell: Crate Mechanics/Arrangement W. Karpinski: Front End – Status C.H. Chung:
P. Colas - Status of the cosmic run 1 Tsukuba, January 16, 2006 STATUS OF THE DATA TAKING JANUARY 2006 COSMIC RUN.
AMS TIM & General Meeting ACC Testbeam Performance & KSC Cosmic Data Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, JSC Gilruth Center Houston, 24th.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Integration of Forward Detectors, ZDC, and CASTOR into CMS Experiments Kevin Reynolds Michael Murray, Mentor David d'Enterria, Co-mentor 2006 Michigan.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
HMPiD upgrade variant; simulation status N. Smirnov Physics Department, Yale University, May, 06. CERN visit.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Installation of the T600 at Fermilab CSN2, September 22,
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
Micromegas for SLHC A project to investigate the use and determine the working parameters of Micromegas for SLHC tracking – in conjunction with the ATLAS.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
ΜΕΤΑΣΥΛΛΕΚΤΙΚΗ ΦΥΣΙΟΛΟΓΙΑ ΕΡΓΑΣΤΗΡΙΟ 3. Μετασυλλεκτική Εργ3-Λιοσάτου Γ.2 ΒΙΟΛΟΓΙΚΟΙ ΠΑΡΑΓΟΝΤΕΣ ΠΟΥ ΕΠΗΡΕΑΖΟΥΝ ΤΗ ΦΘΟΡΑ ΤΩΝ ΟΠΩΡΟΚΗΠΕΥΤΙΚΩΝ Αναπνοή Η λειτουργία.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Evolution of the gas system control for flight
STATUS of BIG PROTOTYPES A. Piskun (for Dubna group) Protvino, 7 June 2011 _________________________________________________ Full Scale Prototype Range.
PEBS: Positron Electron Balloon Spectrometer Henning Gast
The drift chamber with a new type of straws for operation in vacuum
The Transition Radiation Detector for the PAMELA Experiment
Status of CO2 Cooling tests at CERN for Pixel phase 1
اثرات گرمايش جهاني تغييرات آب و هوا، تأثيرات عميق و شديدي بر بسياري از عوامل اساسي موثر بر سلامت از جمله : آب، غذا، هوا و محيط زيست دارد كه اين مورد خود.
Total 1,675 € PMTs ~ 16 x 800€ ~ 12,800€ Ok ~ 10% of PMT cost, but
Presentation transcript:

AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007

TRD: Manifold and Tower Gas Tubing

TRD: Manifold and Tower Gas Tubing: Gas Tightness

TRD: Manifold and Tower Gas Tubing: Gas Tightness (Helium) He-dp/dt-Measurements of individual straw modules during production: q Wall 7 = 1.56*10 -2 l mbar/s q Wall 3 = 1.53 * l mbar/s → Safety Factor 8 for CO 2

TRD: Gas System – Manifold Gas Tubing

TRD: Flight Readout & HV Cabling

TRD: DAQ & Cosmic Test → Thorsten

TRD: DAQ & Cosmic Test

TRD: Delivery to CERN Oct. 24th