Scan of piezo drive trigger delay For this timing scan, we picked an amplitude of 7.5V (a little more than required to give minimum rms vibration as identified.

Slides:



Advertisements
Similar presentations
Tom Lentz (slides Ivana Brasileiro)
Advertisements

of LFD Compensation Study S1 Global Cryomodule
Lorentz force detuning measurements on the CEA cavity
Digital Logic Design Lecture # 17 University of Tehran.
Representing Data Sets ~Adapted from Walch Education.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
Exercise: ASK Consider the input signal with 3 levels shown above. Assume we want to use the following sine wave as the carrier. 10 sin(2p 2 t) And we.
Lutz Lilje DESY -MPY- XFEL Tuner Lorentz Force Detuning System Setup New Saclay design.
Target Test Report Given permission for a maximum of 5000 actuations. Performed 3679 actuations, 3654 with the gate valve open. Ran target at 0.4 Hz to.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
RF Synchronisation Issues
Pulse Width Modulation (PWM) LED Dimmer Circuit
Lecture 6: Measurements of Inductance, Capacitance, Phase, and Frequency 1.
Power Amplifiers Power Amplifiers are used in the transmitter
Leakage & Hanning Windows
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Review of LLRF system based on ATCA standard, Dec 3-4, 2007 Piezodriver and piezo control.
Hydrogen Recombination Time (µs) RF Envelope (V) Here So We get Calculated from # of protons per bunch Calculated from energy loss (voltage drop) in the.
Shuichi Noguchi, KEK6-th ILC School, November Auxiliary Components  Input Power Coupler  HOM Dumping Coupler  Frequency Tuner  He Jacket  Magnetic.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
AC-AC Converter.
PHY 202 (Blum)1 Analog-to-Digital Converter and Multi-vibrators.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Recent LFD Control Results from FNAL Yuriy Pischalnikov Warren Schappert TTF/FLASH 9mA Meeting on Cavity Gradient Flatness June 01, 2010.
Vadodara Institute of Engineering kotanbi Active learning Assignment on Single phase AC CIRCUIT SUBMITTED BY: 1) Bhatiya gaurang.(13ELEE558) 2)
Performance Test of Laser Trackers of FARO Ryuhei Sugahara, Mika Masuzawa and Yasunobu Ohsawa KEK, High Energy Accelerator Research Organization Oho, Tsukuba,
RF Cavity Simulation for SPL
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
Digital Logic Design Lecture # 19 University of Tehran.
ILC FAST TUNER R&D PROGRAM at FNAL Status Report CC2 Piezo Test Preliminary Results Ruben Carcagno (on behalf of the FNAL FAST TUNER Working Group) 4/5/06.
MOKE RESULTS JM micron square pads 50nm Ni/ C10-dithiol / 20nm Co Line scan across Pad
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
Cold Tuner test overview S1-Global at KEK 5-9 July 2010.
May 17-19, 2005D. Zaborov, ARENA workshop1 Dmitry Zaborov for the ITEP group Berlin, May 2005 Analysis methods of ITEP Baikal data.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
1 Data Analysis of LLRF Measurements at FLASH Shilun Pei and Chris Adolphsen Nov. 16 – Nov. 20, 2008.
40 Minutes Left.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Taikan SUEHARA, ATF2 meeting, KEK, 2006/11/22 Status of fringe stabilization of Shintake-monitor Taikan SUEHARA The University of Tokyo.
Minutes Left:
BASIC INSTRUMENTS - oscilloscopes
John Carwardine January 16, 2009 Some results and data from January studies.
APS Talk Outline for GRB-GWB Search (for Spring 06) External Triggers Group.
Detail plan of S1-Global H. Hayano (KEK),
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Warren Schappert Yuriy Pischalnikov FNAL SRF2011, Chicago.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
Progress of Shintake Monitor (ATF2 IP-BSM) ATF2 weekly meeting 2008/9/3 Takashi Yamanaka The University of Tokyo.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
INTERSYMBOL INTERFERENCE (ISI)
SRF Cavities Resonance Control FNAL experience Presented by Yuriy Pischalnikov for Resonance Control Group Fermilab- Los Alamos MaRIE Project Meeting March.
Date of download: 6/25/2016 Copyright © 2016 SPIE. All rights reserved. (a) Schematic of the interventional multispectral photoacoustic imaging system.
Microphonics Suppression in SRF cavities for Project X Yuriy Pischalnikov Warren Schappert Project X Collaboration Meeting Berkeley, April 11, 2012.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
Latest Results on Beam Loaded Experiments at FLASH/TTF Shilun Pei October 27,
Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich
Yuriy Pischalnikov Warren Schappert (FNAL)
dependence on QL can not longer be seen
S1-G for TTC meeting Global Design Effort
Studies Leader Report: 9mA webex meeting, 15th March 2011
S1-G Webex meeting Global Design Effort
Cavity Ring-Down Spectroscopy
Error rate due to noise In this section, an expression for the probability of error will be derived The analysis technique, will be demonstrated on a binary.
Interacting Roles of Attention and Visual Salience in V4
Model Rejection Factor Plots
High gradients in TESLA nine-cell cavities
Production Status 39 modules produced
Manual Chronostasis Current Biology
Presentation transcript:

Scan of piezo drive trigger delay For this timing scan, we picked an amplitude of 7.5V (a little more than required to give minimum rms vibration as identified on a previous plot. We scanned the time delay from 17,5 to 20.5 ms (2.5ms before the rf pulse to 0.5ms after the rf pulse) Observation is that at the point when the piezo sensor signal rms is minimized (minimum vibration), the cavity detuning across the flat-top is also minimized. (see the next two slides) 1

Plot of rms piezo sensor signal vs time during the timing scan This figure shows the rms of the piezo sensor signal over the duration of the scan. The minimum rms value is clearly seen at around 14:29:00 2

Piezo sensor amplitudes and probe I&Q (piezo signal shows from 20ms before to 60ms after the rf pulse) This figure shows the piezo sensor signal and the probe I&Q signals for three places in time in the scan, with the middle plot corresponding to the time of the minimum rms piezo signal. One minute before and one minute after the optimum are shown left and right. 3