Trigger Matrix Shiuan-Hal. Trigger (“times 4”) μ xhodoscopexhodoscope yhodoscopeyhodoscope discriminatorlevel shifter level 1 v1495 level 2 v1495 trigger.

Slides:



Advertisements
Similar presentations
Technische Universität München A digital calorimetric trigger for the COMPASS experiment at CERN Markus Krämer J. Friedrich, S. Huber, B. Ketzer, I. Konorov,
Advertisements

JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
1 ACES Workshop, March 2011 Mark Raymond, Imperial College. Two-in-one module PT logic already have a prototype readout chip for short strips in hand CBC.
Introduction of trigger system: E906 as an example Shiuan-Hal,Shiu 05/02/
1 Search for the Flavor-Changing Neutral-Current Decay,   → p     HyangKyu Park University of Michigan, Ann Arbor for the HyperCP collaboration.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
A Fast Level 2 Tracking Algorithm for the ATLAS Detector Mark Sutton University College London 7 th October 2005.
8th Workshop on Electronics for LHC Experiment, Colmar, France, 10 Sep R.Ichimiya, ATLAS Japan 1 Sector Logic Implementation for the ATLAS Endcap.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Atmospheric Neutrino Event Reconstruction Andy Blake Cambridge University June 2004.
PID, trigger and DAQ for the GLAST beam test (preliminary study) Nicola Mazziotta INFN Bari Dec. 6, 2005.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
CS294-6 Reconfigurable Computing Day 14 October 7/8, 1998 Computing with Lookup Tables.
Tracker Reconstruction SoftwarePerformance Review, Oct 16, 2002 Summary of Core “Performance Review” for TkrRecon How do we know the Tracking is working?
W trigger upgrade simulation Kazuya Aoki Kyoto Univ. Muon Physics and Forward Upgrades Workshop Santa Fe, June 2004.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Abilene Christian University Fermilab E906: Hodoscopes for Stations 3 and 4 Donald Isenhower Abilene Christian University Abilene, Texas U.S.A. Use in.
LECC 2004 – Boston – September 13 th L.Guiducci – INFN Bologna 1 The Muon Sorter in the CMS Drift Tubes Regional Trigger G.M. Dallavalle, Luigi Guiducci,
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
E906/Drell-Yan: Monte Carlo, Data Acquisition and Data Analysis Paul E. Reimer Expected Rates and Monte Carlo (WBS 2.5.1) Data Acquisition (WBS 2.4) –CODA.
Proposal by the Numbers 3 Trigger layers (plus 2 “short” layers) provide full coverage to eta=??? in 15 degree sectors Hits collected in real time, sent.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
E906 Spectrometer Upgrade Overview Paul E. Reimer Experimental Approach Impact on Fermilab Magnet Coil Fabrication Spectrometer Upgrades.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
Some features of V1495 Shiuan-Hal,Shiu Everything in this document is not final decision!
Javier CastilloLHC Alignment Workshop - CERN - 05/09/ Alignment of the ALICE MUON Spectrometer Javier Castillo CEA/Saclay.
R Gilman, Rutgers Physics & Astronomy & Shiuan-Hal Shiu, IPAS E906 DAQ Meeting, Feb, 23, “Trigger” E906_Detector_Readout_and_DAQ_System_v doc.
Why we need adjustable delay? The v1495 mezzanine card (A395A) have a signal transmission time about 6ns. But we need all the signals go into the look.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
Overclocking the V Why we want to overclocking the V1495? Data compression and transfer over multiple clock cycles allows more detailed information.
Triggering with the RPD E. Burtin, CEA-Saclay COMPASS Hadron run trigger meeting, Feb. 12, 2008.
ECL trigger for Super Belle B.G. Cheon (Hanyang U)‏ KEK 1 st open meeting of the Super KEKB Collaboration.
CMS and the Number Sorter Presented to you by: Bobby Scurlock Faculty Mentor: Darin Acosta.
1 FADC Boards for JPARC-K Preliminary Proposal Mircea Bogdan November 16, 2006.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
Trigger rate studying Shiuan-Hal,Shiu. Introduction  Because the DAQ data taking rate only have 1000Hz, we must confirm the trigger rate will not higher.
Shiuan-Hal,Shiu To-do-list and schedule 1. Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1)
2001/02/16TGC off-detector PDR1 Sector Logic Status Report Design Prototype-(-1) Prototype-0 Schedule.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
December 16, 2005M Jones1 New Level 1 Track Triggers Outputs from SLAM provide lists of axial tracks plus associated stereo information Consider new Level.
26 Oct 2010PC Physics Requirements of Software from Chris R ~19 Oct. My.
The SLHC CMS L1 Pixel Trigger & Detector Layout Wu, Jinyuan Fermilab April 2006.
Ba A B B1 FADC B2 SD_FP FLEX_I/O ROC VME64x A: [ HELICITY, HELICITY_FLIP ] (NIM or ECL) Port 1 Port 2 a: [ HELICITY, HELICITY_FLIP ] (LVDS) B: [ HELICITY_TRIGGER,
3 May 2003, LHC2003 Symposium, FermiLab Tracking Performance in LHCb, Jeroen van Tilburg 1 Tracking performance in LHCb Tracking Performance Jeroen van.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Mu3e Data Acquisition Ideas Dirk Wiedner July /5/20121Dirk Wiedner Mu3e meeting Zurich.
Calliope-Louisa Sotiropoulou FTK: E RROR D ETECTION AND M ONITORING Aristotle University of Thessaloniki FTK WORKSHOP, ALEXANDROUPOLI: 10/03/2014.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
14-BIT Custom ADC Board Rev. B
Preliminary considerations on the strip readout chip for SVT
2018/6/15 The Fast Tracker Real Time Processor and Its Impact on the Muon Isolation, Tau & b-Jet Online Selections at ATLAS Francesco Crescioli1 1University.
Resolution Studies of the CMS ECAL in the 2003 Test Beam
Muon stopping target optimization
CMS EMU TRIGGER ELECTRONICS
Trigger Frequency Analysis & Busy/Veto on the SCT TIM
Trigger issues for the CALICE beam test
Low mass dimuon acceptance
Study of MDC tuning.
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Trigger Matrix Shiuan-Hal

Trigger (“times 4”) μ xhodoscopexhodoscope yhodoscopeyhodoscope discriminatorlevel shifter level 1 v1495 level 2 v1495 trigger supervisor TRIGGER

Compare with E866 trigger system Replaced by v1495

TERM OR TRIG S4XY AND134

E866 Trigger matrix  Using the fast monte carlo simulation data. And make cut which listed below.  Only using station 1,2,4 hodoscope.  Ignore all the track crossing X=0(The muon was bended in Y-direction in E866)  Restrict the positive muon go to upper side, and negative muon go quite the other way in first station.  Confine the simulation muon come from the target and not from the dump.

E906 VS. E866 trigger system  E866  Made up by CAMAC and NIM logic modules  Common start  91ns from RF to trigger output  Look up table was build in memory chip.  E906  Made up by VME FPGA modules  Common stop  Maxium 300ns from RF to trigger output  Look up table was build in FPGA

E906 Trigger system hardware limit  128 input channels with 1 ns resolution and 128 ns adjustable delay.  The latency from input to output is about (5x4=20)+?? ns. The latency will less then 150ns now for each v1495. Each pipeline step only cost 4ns now, and we have only 5 layers pipeline in our design. The “??” here means the latency from input to the trigger matrix pipeline which we are still not measure.  From a simple muon track simulation in bend plane, we found there are almost 1400 track conditions will appear for a positive muon. It means 2800 tracks need to deal in one v1495, and may cost about 9000 logic elements.

E906 Trigger matrix current situation  In band plane v1495  Bit 1 on – if a triplet was a positive muon with a Ptxmax<0.6 GeV  Bit 2 on – if a triplet was a positive muon with a Ptxmax<0.9 GeV ……..  Bit 8 on – if a triplet was a positive muon with a Ptxmax<2.7 GeV  Bit 9 on – if a triplet was a negative muon with a Ptxmax<0.6 GeV  Bit 10 on – if a triplet was a negative muon with a Ptxmax<0.9 GeV ……..  Bit16 on – if a triplet was a negative muon with a Ptxmax<2.7 GeV.  In non-band plane v1495  Still under discussion.  Maybe need to add the information of the number of fired paddle.

E906 Trigger matrix current situation  Target Dimuon, good momentum  Dump Dimuon  Other Dimuon  Single target muon  Single non-target muon  At least one quadrant indicates track  3/4 planes hit in at least 2/4 front end FPGAs