VERY PRELIMINARY SURVEY OF MAGNET AXES OF USS – FC – DSS 26 March 2015 V. Blackmore & J. Cobb Everything that follows must be regarded as very preliminary.

Slides:



Advertisements
Similar presentations
06 April 2009 LBT Q Eng/SW Review LBT Q Eng/SW/Mtn Review OSS – Optical Support Structure Paul Grenz.
Advertisements

Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
1 Calice Analysis 02/03/09 David Ward ECAL alignment update David Ward  A few thoughts about ECAL alignment  And related issue of the drift velocity.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
RFQ CAD Model Tolerance Studies Simon Jolly 14 th December 2011.
Magnetic measurements of MICE target stator Ben Shepherd MICE target meeting 11 October 2010.
HERMES tracking for OLYMPUS. Part #1. Detector survey. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
1 MICE Radiation Shutter Description Present status Plans, schedule and remaining work MICE CM26, 24-27th March, 2010.
MICE AFC Work Group meeting February 13, 2004 Introducing the Coat Hanger technique --- the Global reference system Wing Lau.
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
Magnetic Field Studies Dan Karmgard for the HCAL RBX Group.
MICE AFC Group phone conference on 27 January 2005 AFC module progress By Wing Lau, Oxford.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
S. Gibson FSI Offline Analysis 9 th October FSI Alignment: Offline Analysis Overview ATLAS Group, University of Oxford Stephen Gibson, Danny Hindson,
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
Page 1 Christian Grefe, DESY FLC Status of PCMAG fieldmapping analysis Annual EUDET Meeting Paris, Status of PCMAG fieldmapping analysis Christian.
Status and outlook of the Medipix3 TSV project
CNC Router Programming Some basics for FIRST Robotics.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
EDT Chapter 41 Coordinate Systems Cartesian, Relative and Polar Sacramento City College EDT 310.
1 Memory Management Memory Management COSC513 – Spring 2004 Student Name: Nan Qiao Student ID#: Professor: Dr. Morteza Anvari.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Status of the Alignment 17/12/04 Dario Autiero. Measurements taken so far: 13/9 TT8 On the mounting arch 12/11 TT7 Standalone in the target 19/11 TT7.
MICE magnetic measurements: AFC considerations Alain Blondel see a previous discussion for reference in CM35 (Feb 2013 slides by V. Blackmore, A. Blondel.
Muon commissioning status and plans G.P. C. De Plano.
July 31, 2003Tevatron Alignment Review JCT (Re-)Shimming of Tevatron Dipoles  Recent ‘cold lift’ measurements indicate ‘creep’ or shrinkage of the coil/cryostat.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
VARIABILITY OF TOTAL ELECTRON CONTENT AT EUROPEAN LATITUDES A. Krankowski(1), L. W. Baran(1), W. Kosek (2), I. I. Shagimuratov(3), M. Kalarus (2) (1) Institute.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
FC1 M AGNETIC M APPING V. Blackmore CM39 25 th June, /13.
08120: Programming 2: SoftwareTesting and Debugging Dr Mike Brayshaw.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
1 SICBDST and Brunel Migration status and plans. 2 Migration Step 1: SICBMC/SICBDST split  Last LHCb week: Split done but not tested  Software week.
M. Ellis - MICE Video Conference - 30th August Software Report Recent progress:Recent progress: –Start of code to read DATE format (two parts) One.
Extending ICT Research Co-operation between the European Union, Eastern Europe and the Southern Caucasus EECA FP7 Help-Desk EXTEND Training Workshop Baku,
14 Aug 2008PC New task at last meeting (29 July): MICE magnets will be bolted to steel plates on floor of MICE Hall What – if any – is the effect.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
FC Status MPB 1/20 April 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
STAR SVT Self Alignment V. Perevoztchikov Brookhaven National Laboratory,USA.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
26 Aug 2008PC Shield walls – extend the length of channel – will ‘pull’ field x y Coil Centred coil + 2 walls  X – Y asymmetry Off-centre coil +
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Spectrometer Solenoid Field Mapping: Thoughts on Mapping Analysis & Results Major caveat: Everything in this talk is highly preliminary Data arrived on.
Status of physics analysis Fabrizio Cei On Behalf of the Physics Analysis Group PSI BVR presentation, February 9, /02/2015Fabrizio Cei1.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
FIELD MAPPING V. Blackmore CM38 23rd February /70.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
This presentation will describe the state of each element in the beam line with regards to the current update being undertaken. Firstly, it will describe.
FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
Magnetic Alignment V. Blackmore Progress tracked on issue tracker: All axis.
MAGNET MAPPING J. Cobb V. Blackmore (not responsible for the content of this talk) 27 September 2017.
y x Vincenzo Monaco, University of Torino HERA-LHC workshop 18/1/2005
Outcome of the Review and Response to Recommendations
LayoutBeamer, from GenISys GmbH
Why do we need to know the fields / map the magnets?
Gauss-Siedel Method.
Stages for the SSW translation system for PACMAN
Pulsar WG Meeting (C-J Lin)
Tracker to Solenoid Alignment
Validating Magnets Using Beam
Resolving QuickBooks Error when downloading payroll or QuickBooks Desktop Update One of the common QuickBooks Error is which users often get.
Living with e-beam drift Part 1: The e-beam is not broken
HPS Collaboration meeting, JLAB, Nov 16, 2016
Comparing Laser Fit to Barrel Fit University of Wisconsin-Madison
Imperial laser system and analysis
08120: Programming 2: SoftwareTesting and Debugging
Presentation transcript:

VERY PRELIMINARY SURVEY OF MAGNET AXES OF USS – FC – DSS 26 March 2015 V. Blackmore & J. Cobb Everything that follows must be regarded as very preliminary Mapping – finding the axes – has not been trivial –Several algorithms / fits –Independent codes & cross checks Very useful –FCs best understood Flip mode allows some sanity checks Some puzzles still remain –FC2 recently re-surveyed in MICE Hall »New measurements (1/2 hour ago) not digested yet Still work to do –SSs have had less attention Mess of survey files for DSS –Work in progress

Alignment of Bobbins FCs –Manufacturers aligned axes of bobbins to within 50 –100 microns of centres of PCD of bolt holes in flanges at each end of module Provides some cross check USS & DSS –Not known what was specified or done

Procedure Module and Mapper surveyed in same coordinate systems Analyse mapper data –Gives magnetic axis in Mapper Coordinates x – z and y – z projections –Apply survey corrections  axis in Module system (simple additions) Errors are ~ 0.1 – 0.2 mm in x, y for FCs –Unknown yet for USS, DSS but probably similar in mapper coords –Caveat Understanding the DSS survey Mapper was knocked at some point; resurveyed –Nightmarish

VERY PRELIMINARY Hot off the press The two views show where the magnetic axes of modules would be if simply bolted together: Upper: Plan Lower: Elevation 1.The FC is ~ 1mm out of spec. but hope re-survey will fix that 2.There are very large offsets in USS and, especially DSS 3.Bolt holes allow for maximum of 2mm movement in one direction (you choose).

FC Status MPB 5/20 April 2014 THE END