INFSO-RI-223782 JRA2: Status presentation ETICS AH meeting Budapest, 22-24 Iune 2009 Eva Takacs, 4D Soft.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Results, open issues, workplan
Advertisements

System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
TeraGrid Information Services December 1, 2006 JP Navarro GIG Software Integration.
INFSO-RI Quality Assurance with ETICS – multi- node automated testing CGW 09 M.Zurek, A. A. Rodriguez, A. Aimar, A. di Meglio, L. Dini CERN Krakow,
INFSO-RI SZTAKI’s Exploitation plan AHM meeting Budapest, 23 June 2009 Peter Kacsuk, Robert Lovas MTA SZTAKI.
EMI INFSO-RI EMI SA2 Report Quality Assurance Alberto Aimar (CERN) SA2 WP Leader.
INFSO-RI D SOFT's exploitation plan Budapest, 23 June 2009.
SCI-BS is supported by the FP7 Capacities Programme under contract nr RI Build and Test Portal SCI-BUS - agINFRA OSD Eva Takacs 4D Soft Kft. Budapest,
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
WordFreak A Language Independent, Extensible Annotation Tool.
INFSO-RI Enabling Grids for E-sciencE Logging and Bookkeeping and Job Provenance Services Ludek Matyska (CESNET) on behalf of the.
Kuali Enterprise Workflow Presented at ITANA October 2009 Eric Westfall – Kuali Rice Project Manager.
INFSO-RI Module 01 ETICS Overview Alberto Di Meglio.
INFSO-RI JRA2: Testing senarious ETICS AH meeting Budapest, Iune 2009 Eva Takacs, Jozsef Kuti, András Milassin 4D Soft.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
INFSO-RI Module 01 ETICS Overview Etics Online Tutorial Marian ŻUREK Baltic Grid II Summer School Vilnius, 2-3 July 2009.
A DΙgital Library Infrastructure on Grid EΝabled Technology Release Beta Build and Deployment Testing.
Supported by EU projects 12/12/2013 Athens, Greece Open Data in Agriculture Hands-on with data infrastructures that can power your agricultural data products.
INFSO-RI SA1 Service Management Alberto AIMAR (CERN) ETICS 2 Final Review Brussels - 11 May 2010.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
AgINFRA science gateway for workflows and integrated services 07/02/2012 Robert Lovas MTA SZTAKI.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
INFSOM-RI SA2 Overview Valerio Venturi WP leader 2.
INFSO-RI JRA 1 Testbed Management Technologies Alain Roy (University of Wisconsin-Madison, USA) ETICS 2 Final Review Brussels - 11 May 2010.
Conference name Company name INFSOM-RI Speaker name The ETICS Job management architecture EGEE ‘08 Istanbul, September 25 th 2008 Valerio Venturi.
INFSO-RI Enabling Grids for E-sciencE Graphical User Interface. for Charon Extension Layer System. and Application Dashboards Jan.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
Authentication and Authorisation for Research and Collaboration Peter Solagna Milano, AARC General meeting Report and plans Attribute.
ETICS All Hands meeting B ologna, October , 2006 WP4 Status Eva TAKACS.
EMI is partially funded by the European Commission under Grant Agreement RI SA2 – Development Tools Andres Abad Rodriguez SA2.4 Tools Activity Leader.
Software Development and Deployment PDS Management Council Face-to-Face Los Angeles, California August 26-27, 2014 Sean Hardman.
EGEE-II INFSO-RI Enabling Grids for E-sciencE GStat Work Plans for EGEE-III Joanna Huang, ASGC/OPS EGEE SA1 F2F Meetings, Abingdon.
INFSOM-RI WP 4 : Testing Tools and Methodologies Status Report ETICS Review – 15 February 2008 Éva Takács (4D SOFT)
LQCD Workflow Project L. Piccoli October 02, 2006.
System/SDWG Update Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures contract no Workflow repository, user.
CERN Alberto Di Meglio Darmstadt, February 2009 Project Status Update ETICS 2 All-Hands Meeting.
EMI INFSO-RI Software Quality Assurance in EMI Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
Software Development and Deployment PDS Management Council Face-to-Face Berkeley, California November 18-19, 2014 Sean Hardman.
D4Science and ETICS Building and Testing gCube and gCore Pedro Andrade CERN EGEE’08 Conference 25 September 2008 Istanbul (Turkey)
PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Patch Preparation SA3 All Hands Meeting.
INFSOM-RI WP1: Administrative and Technical Management Alberto Di Meglio Project Manager.
INFSO-RI JRA2 Test Management Tools Eva Takacs (4D SOFT) ETICS 2 Final Review Brussels - 11 May 2010.
Advanced Metering Implementation Team Update Presentation for RMS Christine Wright, Competitive Markets Division Public Utility Commission of Texas June.
OpenNebula: Experience at SZTAKI Peter Kacsuk, Sandor Acs, Mark Gergely, Jozsef Kovacs MTA SZTAKI EGI CF Helsinki.
GROUP PresentsPresents. WEB CRAWLER A visualization of links in the World Wide Web Software Engineering C Semester Two Massey University - Palmerston.
Grid Execution Management for Legacy Code Architecture Exposing legacy applications as Grid services: the GEMLCA approach Centre.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Implementing product teams Oliver Keeble.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
ETICS An Environment for Distributed Software Development in Aerospace Applications SpaceTransfer09 Hannover Messe, April 2009.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Operations Portal Development Update on Requirements Cyril L'Orphelin IN2P3/CNRS.
INFSO-RI Enabling Grids for E-sciencE Network Services Development Network Resource Provision 3 rd EGEE Conference, Athens, 20 th.
EMI INFSO-RI SA2: Quality Assurance Status Report Alberto Aimar(SA2) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
V7 Foundation Series Vignette Education Services.
1 Globe adapted from wikipedia/commons/f/fa/ Globe.svg IDGF-SP International Desktop Grid Federation - Support Project SZTAKI.
INFSOM-RI Project Status Update Alberto Di Meglio Project Manager.
DataGrid and CrossGrid Helpdesk CERN, 30th October 2002 EDG WP6 meeting Sophie Nicoud (CNRS-Marseille) and José Salt (IFIC-Valencia)
The StratusLab Distribution and Its Evolution 4ème Journée Cloud (Bordeaux, France) 30 November 2012.
INFSOM-RI WP3: WP3: Software configuration tools and methodologies Status Report ETICS All-Hands – 23 May 2007 E. Ronchieri.
SCI-BS is supported by the FP7 Capacities Programme under contract nr RI Quality assurance in SCI-BUS project by applying agile testing practices.
All-Hands Meeting Outcome and Discussion
JRA2: Acceptance Testing senarious
JRA2 – TEST MANAGEMENT TOOLS
ETICS 2 All-Hands Meeting
Lessons Learned, Future Plans and Conclusions
Infrastructure Support
WP5: Dissemination, studies, web portal and tools
Module 01 ETICS Overview ETICS Online Tutorials
Presentation transcript:

INFSO-RI JRA2: Status presentation ETICS AH meeting Budapest, Iune 2009 Eva Takacs, 4D Soft

INFSO-RI Overview Stuffing and resources Major Tasks Performed To be discussed Workplan for the next quarter Conclusion 2

INFSO-RI Stuffing 4D SOFT István Forgács – partner representative, member of PMB Éva Takács – JRA2 WP leader, since January 50% until April 50%, then 100% István Forgács memember of PMB András Milassin - the technical proxy of Eva working 50% József Kuti is technical member of our team working 100% 3

INFSO-RI Stuffing Sztaki Robert Lovas – partner representative, member of PMB Karoczkai Krisztián – gUse main architect/developer Ács Sándor - infrastructure Leszák András – Sztaki DesktopGrid project in ETICS 4

INFSO-RI Major tasks performed 5

INFSO-RI Test Tool Registration System Complete redesign of the GUI has been performed Main functionalities mainly remained the focus has been on the intuitiveness of the GUI Registration process is done in steps Information system on the plugins have been implemented Advanced tag based search /filtering functionality The design of the associated help system has been started 6

INFSO-RI org.etics.test-system org.etics.testsuites.test-system Subsystem in org.etics for our development, ‘marketing project’ for 4D SOFT showing ETICS build/test features The modelled environment is ready (on going work) Local and remote builds are working Test plugins are running Deployment on test environment is ready Web-service testing scenario is working (will be improved) Acceptance test scenario is under investigation Modelling org.etics.testsuites.test-system (multinode counterpart) is ready (on going work) – transition to multinode Designed a two node deployment scenario 7

INFSO-RI Workflow Designer the concepts and processes of the multimode test scenario between SA1 and JRA2 has been clarified the required changes have been done, restructuring of some parameters/elements abstract/concrete workflow update mechanism improved xml/xsd, example client for xml generation 8

INFSO-RI Sztaki DesktopGrid project The modelling environment is under work Local builds are running Remote builds ‘almost’ running Valgrind plugin for testing memory leaks is running 9

INFSO-RI To be discussed Technical details Multinode: a new checkpoint ETICS Test-system imtegration to the ETICS web portal Plugins running with etics-build (in some situations not running), etics-test (not running) Organisational problems Problem for JRA2 that no real user requirements are received – (should JRA2 be more proactive ????) To overcome this problem the two example projects (GWT project – as example of a general purpose web application and the DesktopGrid project from Sztaki – a grid application) are considered as reference projects. 10

INFSO-RI Workplan for the next quarter Multinode tests Checkpoint now !!! Workflow Designer checkpoint now !!! Test Tool Registration System Finishing the implementation, testing Integrating into ETICS core – checkpoint now !!! Acceptance test scenario An utility for ‘Selenium’ test running is under investigation 11

INFSO-RI Status and schedule