Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Tuesday 3 rd May 7:30 Access in the SPS to replace injection kicker magnet terminating resistor after radiation cool down overnight 9:45 probes injected.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
Fri – Sat - Sunday 30 Sept - 2 nd October Friday  06:00 Operator dump fill #2171, integrated lumi 75 pb-1.  90 m  * optics Optics ok, collisions at.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Friday 15th June 01:11 Injection.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Wednesday 31 October: Morning
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Summary of Week 16 G. Arduini, J. Wenninger
Scrubbing progress - 09/12/2012
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thu 15/9 – Fri 16/9 09:30 Controls network problem fixed The network problems have been fixed since 9:30am when the network switch for the Service IP57.
Yesterday’s morning’s controls issues
Friday Morning 7:30 injection for fill 2908
Wednesday 03/11 – The Plan Finish electron-cloud program:
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Monday 24 October hours of 25ns MD
LHC Morning Meeting - G. Arduini
Mon Access for switching temperature probe DFB L7.
LHC Morning Meeting - G. Arduini
Monday 3rd September - morning
Scrubbing progress - 08/12/2012
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday In the morning test cycle with probe for Q’ measurement.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Thursday 20th July - morning
Wednesday 26 October 2011.
Wednesday morning / afternoon
Wednesday 6.10 Morning: Quench test at 450 GeV
Thursday 10:00 Fill 1986 in stable beams.
Presentation transcript:

Another typical LHC day

06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump  Trip of matching section R5  PIC PLC ( possible SEU) – see Markus Zerlauth Thursday morning LHC status

2000 LHC status

2000: Luminosity lifetime LHC status

Vacuum activity at P5 in fill 2001 LHC status

Pt 1: BI BLM, RP Pt 2: ABT, M.Barnes, QPS D'Angelo, RP Pt 3: BI BLM, RP Pt 4: BI BLM, RP Pt 5: PIC Markus Zerlauth Pt 6: Pt 7: BI BLM, RP Pt 8: Cryogenics Thursday afternoon - access LHC status In shadow of PS switching back to POPS (POPS now operational) Among others (and experiments) Cryogenics: automatic reset of PLCs point 1 deployed

14:55 Patrol PM 56 lost  Patrol with Serge Di Luca  Fortunately Serge was with the team and performed online debugging. It looks like there is a problem with the door between sector 1 and 4 YCPS03=UJ56-0. This doors is sending a veto when in patrol mode or when coming from patrol mode, which is tripping all search boxes. Serge could implement a temporary solution but an intervention should be foreseen for the next technical stop 15:30 Problem with the MAD of UJ23: the door does not close. Access system of UJ16 sees a missing key.  Apparently this is a known problem: we need to go there and shake the keys. Note that the counter on the access system application sees zero keys missing. Access system problems LHC status

19:20 Pilots in Bit of a struggle with injection  Booster: slow kicker problem – resolved by piquet. Finally had beams for physics fill only at around 20:30.  The first attempt to fill for physics was dumped by injection losses. Before trying again, we re-steered the lines with 12b trains (small corrections were enough).  A second attempt for filing the machine was slowed down by a few problems in the SPS (BPM in LSS6, spurious interlocks from BLS in LSS2). Losses in the LHC were under control but we were stopped by injection oscillations that appeared suddenly.  Had to dump the stack and re-start  00:45 Injection of B2 36 bunches failed by IQC due to injection oscillations.  Careful re-steering of lines Thursday evening LHC status

02:40 Stable beams Fill 2005  New record: 2.05e33 03:00 Beams dumped  PLC PIC UJ14 CYCIP01 for inner triplet L1 lost  Markus Zerlauth to UJ14 05:45 Injecting  The injection was fine, only three warnings in IQC B2 from losses no higher than 4%. Stable beams fill 2006  1.64e14  1.18e11 ppb  Just over 2e33 Friday morning LHC status

Tunes increased by 1e-3 both beams, both planes ALICE have a cooling problem. Access required. OP continue to probe the meaning of ‘adiabatic’. Paul’s buying the beer – 17:00 in the CCC this evening Misc LHC status

A little shy of 2 fb-1 delivered stable LHC status