LSS1 Space Reservation Etienne Carlier 19-11-2015.

Slides:



Advertisements
Similar presentations
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Advertisements

Etienne CARLIER AB/BT/EC
2.3 Ruler problems and number lines Objective: To solve ruler problems.
Measurements. How is the equipment used? To find perimeter, area, volume or length you just take the ruler at the centimeter side and put the end point.
Impact of LSS5 dump on other SPS systems BG 24/2/15.
SPS aperture measurements MSWG 26/03/2013 Stéphane Cettour Cavé.
Transverse Impedance Localization in SPS Ring using HEADTAIL macroparticle simulations Candidato: Nicolò Biancacci Relatore: Prof. L.Palumbo Correlatore.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
B.O.S.S. SPS ring and transfer lines Serge Massot for BE-OP-SPS European Organisation for Nuclear Research CERN CH-1211 Genève 23 Switzerland 27/05/2014CERN.
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
Update of the SPS transverse impedance model Benoit for the impedance team.
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
FMAP_Workshop - April 1, 2004 Frequency Map Calculation for the Advanced Light Source David Robin Advanced Light Source work done in collaboration with.
Kicker generator and controls installation in ECA5? Etienne CARLIER
FD Jitter Tolerance Study Min-Huey Wang. 2 Introduction Investigate three BDS designs L* 4.5 m, L* 4.0 m and L* 3.5 m. Using 500 GeV baseline parameters.
EMMA injection & extraction Takeichiro Yokoi(Oxford University)
SPS Dump relocation Radioactive Dump storage alternatives JL GRENARD EN-HE
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
Circles Shape and Space. Formula for the area of a circle We can find the area of a circle using the formula radius Area of a circle = πr 2 Area of a.
LIU-SPS upgrade, schedule, target parameters and observed limits 1 B. Goddard, E. Shaposhnikova for LIU-SPS coordination team SPS scrubbing review
LIU-SPS, 15 April 2015 Paul Cruikshank1. In the beginning…. First slide that Brennan gave me – everything decided ! LIU-SPS, 15 April 2015 Paul Cruikshank2.
SPS Beam Dump in LSS5 Etienne Carlier on behalf of LIU-SPS LSS5 Dump Working Group. IEFC –
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
SPS DAY Aperture History 01/19/2016 Stéphane Cettour Cavé.
Discussion and preliminary conclusions LIU-SPS dump review.
SPS point 3 LSS3 rearrangement LIU-SPS-200 MHz Power Upgrade May 26, 2011Eric Montesinos / CERN-BE-RF-SR.
Status of the LSS5 beam dump and proposed relocation of LSS5 systems Etienne Carlier on behalf of LIU-SPS LSS5 Dump Working Group LIU-SPS Coordination.
1 TI 8 LHC SPS LSS6 IR2 TT41 LSS4 IR8 TI 2 TT60 TT40TT20 LSS2 LSS1 TT10 Mobile dump block (TED) Targets T2, T4, T6 Target T40.
LSS1 post LS2 F.M. Velotti, B. Goddard. Q-Dogleg in LSS1 The quadrupole misalignment in LSS1 was needed to dump horizontally wide beams (e.g. FT beam.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Flange Insulation and Grounding in the SPS Jose E. Varela 06 October 2015.
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
LAGUNA Primary Beam: Extraction and Transfer B.Goddard TE/ABT 23/01/2013 Reporting on behalf of many colleagues 400 GeV – Extraction from SPS – Upgrade.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
Summary of discussion on isolating flanges E. Shaposhnikova With input from LIU-SPS BD WG (in particular H. Bartosik, F. Caspers and J. Varela), K. Cornelis,
SPACE SHUTTLE.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
SPS Longitudinal Impedance Simulations & Measurements Update Benoit Salvant, Carlo Zannini, Thomas Bohl, Helga Timko, Fritz Caspers, Elena Shaposhnikova.
Perimeter, Area and Volume Presented by Bill Haining Functional Skills L1.
PS2 WG Injection and extraction systems Basics and assumptions
Target insertion matching and standard cell optics optimization

SPS LS1 Planning meeting (N019) 04/09/13
TE-MSC activities in SPS during LS2
update on SPS impedance localization
Impact of TIDVG problem on LSS5 dump design schedule
SPS - EYETS 2016/17 Vacuum systems planning
Design of TIDVG#4 A. Perillo-Marcone (EN-STI).
LIU–PLI report LIU SPS meeting.
EN-HE SPS works during EYETS
Status of the MOPOS BI TB – 26th June 2014.
SPS LS1 Planning meeting (No.34) 16/04/14
Status with crucial LSS5 kicker transmission line cables
1 3 2 Maths 3:Perimeter, Area and Volume By: Bill Haining.
Georgi Minchev Georgiev EN-EL-FC
News on the TMCI and SPS transverse impedance
Candidato: Nicolò Biancacci
Impedance localization in SPS ring
Preliminary design result of SS ring
CEPC-SPPC Beihang Symposium
Area of triangle.
IR Lattice with Detector Solenoid
Monologue Requirements Monologue Requirements Monologue Requirements
SPS Planning meeting for LS2 #19 Vacuum sectors & Magnet campaign situation Antonio Grande EN-ACE 06-Mar-2019.
2018 Arithmetic.
Update on the SPS Impedance Model
Presentation transcript:

LSS1 Space Reservation Etienne Carlier

LSS1 - Reconfiguration Kickers DumpSEM DumpSEM LSS1 - Reconfiguration

Equipment PositionLength ApertureEquipmentPositionLengthAperture VTSS VAC MDV MDV BPV11706 BPV11708 VEQH x95 VEQD QDA QD Total length Total length SPS HALF PERIOD QFA – QDA 11710

LSS1 - Reconfiguration Kickers DumpSEM DumpSEM LSS1 - Reconfiguration

Equipment PositionLength ApertureEquipmentPositionLengthAperture QDA x95 QD VEQH 267 VEQD186 MKDVA VBBD VVSB VBBA VEPE MDHW VBBA VAC 2003 MKDVB MDHW MDHW VAC 2497 VBBH VVSB VBBV MKDHA VBBA MDHW MKDHA VAC 810 VBBA MDPH x53.3 MKDHB VEPZ11757 VBBA MDPH11757 VVSB VAC 1504 VBBA BSHV BSHV VEHK VEHK BSHV BSHV VEHL VAC VEDY /273 VEDZ VEDD TFDH VEGD TIDH /159 WMNF MDH BPH VEQI x95 VEQF x42.3 QFA QF Total length Total length31998 SPS HALF PERIOD QDA – QFA 11810

LSS1 - Reconfiguration Kickers DumpSEM DumpSEM LSS1 - Reconfiguration

SPS HALF PERIOD QFA – QDA Equipment PositionLength ApertureEquipmentPositionLengthAperture QFA x95 QF x42.3 VEQI 130 VEQF186 VVSB VVSB VBBE VAC VKNY MDHD BPCE VKNR VKNV /356VKNV /356 BSMH BSMH BTVA BTVA VKNW VKNW /273 VECD VECD TFDV VVSB VEGD VAC TIDVG /159 VEWM VNBX VBBA VVSB MDVA MDVA BPCE BPCE VEQJ x95 VEQJ x95 QDA QDA Total length Total length31998