SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC
Summary 25/02/2016 Georgi Minchev Georgiev EN-EL-FC 1.Declaration in PLAN 2.FC demands
25/02/2016Georgi Minchev Georgiev EN-EL-FC 1.Declaration in PLAN 1/2 PLANUpgradeAction Equipment or System impacted LocationGroupContact New Beam Dump New beam dump system in LSS5, with full shielding and remote handling, plus modified kicker system New Beam Dump Located in LSS5 / ECA5 / BA5 TE-ABT Etienne Carlier New Beam Dump Relocation of present LSS5 systems due to new beam dump system in LSS5 UA9 experiment eCloud experiment Beam instrumentation experiments LSS5TE-ABT Etienne Carlier Relocation of present LSS5 systems due to new beam dump system in LSS5 UA9 experimentsLSS Relocation of present LSS5 systems due to new beam dump system in LSS5 Beam instrumentation LSS5 Relocation of present LSS5 systems due to new beam dump system in LSS5 CollimatorsLSS5EN-STI Relocation of present LSS5 systems due to new beam dump system in LSS5 e-CloudLSS5
25/02/2016Georgi Minchev Georgiev EN-EL-FC 1.Declaration in PLAN 2/2 PLANUpgradeActionEquipment or System impactedLocationGroupContact New Beam Dump Removal of present beam dump system from LSS1 and rearrangement of remaining LSS1 systems Removal of TIDH & TIDV dumps Removal of MKDV & MKDH kickers Removal of TFDH, BGSH, TFDV & BSGV monitorsl Replacement of QDA117 by QD117 Replacement of QFA118 by QF118 Modification vacuum sectorisation LSS1 / BA1 TE-ABT Etienne Carlier Removal of present beam dump system from LSS1 and rearrangement of remaining LSS1 systems Remove the Scraper BSHV LSS1 Removal of present beam dump system from LSS1 and rearrangement of remaining LSS1 systems Move the beam instrumentation LSS1 Removal of present beam dump system from LSS1 and rearrangement of remaining LSS1 systems Remove the beam dumpLSS1
2. FC demands -LIU shall ensure correct insertion of all activities in PLAN tool – works & projects with sub works LIU shall provide before end of March 2016 the expected work volume (No of cables, average length) needed for FTEs estimation Long Shutdown Commissioning Operation Technical Stop YETS 2015 EYETS 2016 * YETS 2017 LS2 *Be ready by end of 2016 in the event of possible full linac4 connection Today we are here LIU shall provide before end of September 2016 LS2 pre-requests for budget envelopes estimation All definitive LS2 requests (DIF, DIC, DIR, DEC) shall be submitted before 21/12/ /02/2016Georgi Minchev Georgiev EN-EL-FC Work anticipation before LS2 - All definitive requests (DIF, DIC, DIR, DEC) shall be submitted before 30/06/2016
Thank you!