Stephen Hassler, Jeffrey Troester University of Nebraska - Lincoln Department of Industrial & Management Systems Engineering Contributors Hotsy Equipment.

Slides:



Advertisements
Similar presentations
PRODUCTION FUNCTIONAL MANAGEMENT Creation of utilities by converting raw material to final product by various scientific methods and regulations Very important.
Advertisements

TOPIC :CAPACITY AND FACILITIES
Process Selection and Facility Layout
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Sources of Information for Manufacturing Facilities Design
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Just-in-Time and Lean Systems
Material Handling Conventional. Operations Process (Flow) Chart Flow diagram is a plan of work area, indicating the position of machines, flow of materials.
CSUN - Prof. David Shternberg
Activity Based Costing
Operations Management
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Material Handling. Materials Handling Materials handling is a non-value activity that your customer is unwilling to pay for. Constantly question material.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Manufacturing Engineering Department Lecture 1 - Introduction
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
Session Pooja patnaik.
Process Selection and Facility Layout
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Material Transport Systems
How to Effectively Implement Set-up Reduction in Any Organization.
Stephen Hassler Jeffrey Troester University of Nebraska – Lincoln Department of Industrial & Management System Engineering Presented on April 15, 2009.
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
Assembly Line Balance Balance.
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
Traditional Approaches to Facility Layout
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Process Planning and Computer Aided Process Planning
Chapter 11 Production and Operations Management Learning Goals
Value Analysis/ Flow Analysis
Manufacturing.  Manufacturing is all about converting raw material into consumer or industrial products.  A firms manufacturing competency is based.
Lean Basics Dewey Warden.
Chapter 4 Process Design.
© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name What Lean Means to Printers Young.
McGraw-Hill© 2004 The McGraw-Hill Companies, Inc. All rights reserved.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Activity Of The Product. 2freeleansite.com Activity Of The Product Activity of the product focuses the “Product or Thing” from “start” to “finish”. -
Traditional Approaches to Facility Layout
Installing Plunger Lift in Gas Wells Lessons Learned from Natural Gas STAR from Natural Gas STAR Exploration & Production, Gulf Coast Environmental Affairs.
MH...CH LECT011 What is Material Handling? Materials handling is the science and art both involving the moving, packing and storing of substance.
Review of Lean Topics Dewey Warden.
11-IE IE IE-60  Facilities design for manufacturing systems is extremely important because of the economic dependence of the firm.  Facility.
 Discussion 40 minutes  Break 10 minutes  Discussion 40 minutes  Will understand what Standard Work is, and is not  Will be able to study and understand.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Work study. Work study literally implies study of human work. it concerns itself with better ways of doing things n control over the output of those things.
Facility Design Issues. Back to the course objectives... Forecasting Strategic Planning Aggregate Production Planning Disaggregation Production Scheduling.
Characterization of manufacturing (Wright, Ch1-2) Technology –Production Technology.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Introduction to Motion and Time Study
Auxiliary Services Requirement Space
Mel Wendell – Mountain Pointe High School
Lean operations and JIT
Process Layout Chapter #6.
By Mike McHugh President
Introduction to Lean Emily Varnado.
AQA GCSE 4 Production techniques and systems
FACILITY LAYOUT Facility layout means:
Lean and Quality Management Basics of Lean Management
Operations Management
(Lecturer in Mech. Deptt.)
Work Measurement and Lean Application
Set-up Reduction Kaizen June 4,6-7,& 18th, 2013
“Cellular Manufacturing”
Presentation transcript:

Stephen Hassler, Jeffrey Troester University of Nebraska - Lincoln Department of Industrial & Management Systems Engineering Contributors Hotsy Equipment Co. (NE)  Roy Gage – Sales Representative  Dennis Klingemann – Sales Representative Lincoln Industries (NE)  Bill Hancock – Area Leader, Fabrication  Eric Jacobs – Development Engineer Original Problem Unfortunately, after the production line was designed, installed, and operating, quality issues arose. A set of operations occurring early in the production sequence was causing damage to the parts. Original Remedy A quick solution was developed by LI and another operation was added to the production process, though it occurred on a workstation off of the main production line. Consequential Problem By locating the workstation off of the main line, one-piece flow was disrupted. As a result, material handling became excessive, processing time increased, and quality control declined. Project Objective It is the goal of the investigating team to develop a cost-effective proposal that remedies these undesirable byproducts and restores one-piece flow to the production line. INTRODUCTION Company Profile, Project Field, Problems, & Objective Company Profile In 1952, Lincoln Industries was founded in Lincoln, NE as a small job shop for custom electroplating. The company has grown to become Lincoln’s largest water user and North America’s largest metal finisher. In its 500,000 square feet of production and warehouse space, approximately 500 people are employed. Annual revenues have grown rapidly over the past decade and now exceed $100 million. Project Field Lincoln Industries (LI) is best known as North America’s largest metal finisher. However, the company’s operations are diverse and our team took a look at their fabrication activities. At a facility in Air Park (Lincoln, NE), LI fabricates exhaust stacks for semi-trailer trucks. STUDY DETAILS Analysis Method & Findings Four Step Analysis Method Understand Problem and Magnitude  Visual Aids, Quality Inspection, Time Studies Develop Alternatives  Seek Expert Opinions, Creative Brainstorming Verify Feasibility of Alternatives  Examine Attributes and Costs, Design Experiments Evaluate Alternatives  Economic Analysis, Discuss Qualitative Factors Understand Problem and Magnitude Visual Aids  The team developed a simple facility layout diagram to convey the problematic nature of the current arrangement.  Photographs and video were taken to document the process and highlight production issues. Current Layout SAW DEBURR CARTS BEND WASH EMPTY AREA (90 FT 2 ) ≈ 100 FT Lean Issues Four of the Seven Wastes of the Toyota Production System (TPS) were glaringly obvious as a result of the current layout.  Waste of Transportation  Waste of Waiting  Waste of Inventory  Waste of Motion Photographs SAW LOADING SAW RAW MATERIAL DEBURR MACHINE CHIPS CARTS WASH BEND MACHINE UNLOADING BENDER Understand Problem and Magnitude Quality Inspection  Though inefficient, the current wash operation sufficiently removes chips from the tubes.  Chips are being introduced from various sources such as material handling carts, gloves, rags, and tools. Understand Problem and Magnitude Time Studies  Surprisingly, the inefficient wash operation is not typically the bottleneck of the production line.  However, when the wash operation becomes congested, it definitely has the ability to function as the bottleneck. Other Benefits Added Washing Capacity Liberated Wash Station Operator One Year Warranty on Washer Less Consumables (Gloves, Rags) Less Material Handling Equipment (Carts) Cleaner, More Orderly Facility Labor Savings Robustness Calculated Savings are Intentionally Conservative Using 6 Washes per Day or Idle Time Avoidance of 10 min Significantly Improves Expected Payback Period Labor Savings Key Assumptions  Labor Expense (Hourly) = $15 Source of Labor Savings  Labor Reduction at Wash Operation (1 Operator)  Idle Time Avoidance at Wash Operation (3 Operators) Projected Labor Savings  Labor Reduction per Wash = 13 min = $3.35  Idle Time per Wash = 6 min * 3 = 18 min = $4.50 $7.85  Total per Wash = $7.85 $39.25  Total per Day = $7.85 * 5 = $ Months  Payback Period = 334 Workdays = 16 Months  Salvage Value Not Considered, Likely Substantial Wash Operation Time Study Results  Unit Times = 36 s (for 25) / 43 s (for 15)TOTAL 900 s (See Below) Move Cart to Wash Station20 s Idle- (Often > 100 s) Lift Cart with Crane and Dunk in Bath 120 s Cart Air Dry and Release from Crane 100 s Hand Wipe (25) Tubes640 s Idle- (Often > 100 s) Move Cart to Bend Operation20 s Key Observations  Excessive Idle Time  Frequently Congested Workstation  Operator Sets Operation Pace  Potentially the Bottleneck Operation Develop Alternatives Seek Expert Opinion – Idea List  Power Washing Cabinet  Power Washing Conveyor System  Laser Cutting (No Chips)  Water Jet Cutting (No Chips)  Precision Saw (No Chips) Creative Brainstorming – Idea List  Vacuum (Handheld or Fixed)  Magnets (Handheld or Fixed)  Water Bath with Drying Fans Verify Feasibility of Alternatives ALTERNATIVE FEASIBILITY DETERMINATION Power Washing CabinetFeasible Power Washing Conveyor SystemInfeasible – Poor Cleaning Laser CuttingInfeasible – Cost Water Jet CuttingInfeasible – Cost Precision SawInfeasible – Cost Vacuum (Handheld or Fixed)Infeasible – Poor Cleaning Magnets (Handheld or Fixed)Infeasible – Poor Cleaning Water Bath with Drying FansInfeasible – Poor Cleaning Evaluate Alternatives Economic Analysis  Cost savings are likely to result from reduced labor (drying tubes), reduced overall processing time (from elimination of idle time), reduced WIP, potentially improved quality, and a cleaner, more orderly work space.  Will the savings from the installation of a power washing cabinet justify its expense? PROPOSAL DETAILS Description & Benefits Description Power Wash Cabinet Suggested Settings  Batch Size:5 Tubes  Wash Phase:120 s  Dry Phase:60 s  Unload Phase:50 s Key Assumptions  Saw Operation Unit Time Increases (5 s) for Added Material Handling. Bend Operation Unit Time Increases (10 s) for Added Material Handling. SAW DEBURR CARTS BEND WASH ≈ 10 FT Proposal – Install Hotsy Model 7663 Purchase Cost  $10, 650 Tube Fixtures (5)  $1,250 Consumables  $1,200 / Year TOTAL – YEAR 1  $13,100 Rationale Moving water seems to remove chips from the tubes better than other methods. For a relatively low cost, the team believes that LI can achieve significant savings with the installation of a power washing cabinet. However, the efficiency of the machine is dependent upon some batching. Therefore, pure one-piece flow will not be achieved. VACUUM EXPERIMENT “More Value with Less Work” – Philosophy of Lean Manufacturing Image Sources: