TM Module Measurements (1) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John Wilson
TM Module Measurements (2) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October CMM measurements on Thermomechanical modules 33
Preparations for Irradiation of ABCN250 hybrids at Birmingham 10 th August 2015, Petal/Stave Meeting B'ham workshop has cut one empty V4 panels (from L'pool) into one- hybrid slices using a 'waterjet cutter' machine Simon checking how to clean the panels in preparation for wire-bonding 15m Cat5e network cable (PC-to-Atlys communication) tested in electronics lab with ITSDAQ, works ok Power cable testing: Using high-power resistors with heatsink and fan, run at 2.5V and 3.4A. To check voltage drop from control-room to coldbox. To safely hold hybrid on aluminium plate inside irradiation coldbox: Planning 3D-printed frame Strip Module Meeting; 26th October
ABC130 Single-Chip Board: Test system setup 10 th August 2015, Petal/Stave Meeting ABC130Driver board received from Peter – many thanks ! Simon has wiring-up 16pin Molex connector according to instructions on Twiki: (NB protective diode is fitted, Xilinx f/w already loaded). Then power-up ABC130Driver, adjust ITSDAQ config, get communication with Atlys going. We also have a single-chip ABC130 board with mini-sensor fitted, but for now won't connect it up, first gather some experience with ABC130Driver DAQload: Planning RAL visit for pick-up, to learn how to run them, wiring details etc Strip Module Meeting; 26th October