TM Module Measurements (1) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October 2015 1 Phil Allport, Matt Baca, Daniel Briglin, James.

Slides:



Advertisements
Similar presentations
CRIMPING Introduction
Advertisements

And cheap, yes! River Falls, WI October 30, 2010 Saint Cloud State University, MN.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
Stave loading with Si-heaters at UniGe with jigs v-1 August 2011 Maarten, Coralie, Franck, Didier.
Electronics Dan Simon Cleveland State University ESC 120 Revised August 28, 2010.
Arduino. Arduino is a tool for making computers that can sense and control more of the physical world than your desktop computer. It's an open-source.
Residential Wiring Facts
Sundance High-tech DSP solutions. Giving you the freedom to design Multiprocessor Technology Ltd SYSTEM CONFIGURATION.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
Institute Of Applied Technology ATE 1012 Grade 10 Eng. Rose Hasan.
2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 1 ATLAS Tracker Upgrade: Hybrid Wire-Bonding and Test Setup at Birmingham.
Service Bulletin 161 SUBJECT: Upgrade to current production level UNITS:D27105 DATE CODE RANGE: All units up to date code to be checked ISSUED.
Kirchhoff’s Laws. Changes from circuit in lab manual. 1. The DC voltage supply to use is +5V, not +9V as is shown in the lab manual. 2. A second circuit.
Baseboard Aavikkomursu 7.2. Aavikkomursu Micro- controller Extension port for programming microcontroller and sensor input Resistor RS485 interface chip.
Trouble shooting Before starting to work on a problem, first we have to understand the problem Once the problem is understood, we will try to “isolate”
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
Larg. Week, April 2002, Electronics Meeting1 Progress Report On Electronics Activities in Paris Bertrand Laforge LPNHE Paris CNRS/IN2P3 – Universités Paris.
Segway Controller Notes. = connection on top layer of circuit board = connection on bottom layer of circuit board Ground Plane: Areas enclosed by the.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
Locknetics CIP Module Upgrade 12/2/08 Akin Olugbade Justin Gilstrap Lutalo Webb.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
CANBus Hardware Setup. CANBus CANBus is a control system method that can be used instead of the conventional PWM system. It uses RJ12 cable, which is.
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3- Develop Solutions Unit 4- Implement A Solution Unit 5- Test and Evaluate.
12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 1 - Small vacuum pump holding hybrid flat on panel (which it is ‘strong enough’ to do) - Since picture.
PC Systems Building System Components Installation Procedures Sample PowerPoint Presentation.
Preparations for Irradiation of ABCN250-Hybrid (1) 10 th August 2015, Petal/Stave Meeting Following-up on Craig’s plans for irradiation at the B’ham cyclotron:
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
21 Nov 2013 Juergen Thomas: ATLAS Tracker Upgrade: Hybrid Production and Test Setup at Birmingham 1 ATLAS Tracker Upgrade: Hybrid Production and Tests.
Detection Circuit ENGR Lecture. Learning Objectives of Lab  Students will learn about –  Electronic circuit components  Building the binary.
Serial Powering - Protection Purpose Protect the stave Assure supply of power to a serial powered chain of modules when one member of the chain fails Control.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
Testing of ABC  Not to scale! 100nF Edge Sensor wired to A9, A10 ? ABC nF NB graphic is not an exact match with “ABC_Pads_V5.2.pdf”
Petalet-Stavelet; 13 July Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
Details of 28” LED segment
RAL, 17-May-2007Vladimir Rajović / Birmingham MAPS TEST PCB SCHEMATICS REVIEW.
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
ATLAS UK Tracker Upgrade AIDA-2020 Transnational Access Facility
Experiment 4 Kirchhoff’s Laws. Changes from circuit in lab manual. 1. The DC voltage supply to use is +5V, not +9V as is shown in the lab manual. 2. A.
How to Create RJ – 45 Wire.   To create the RJ – 45 cable or better known as the Cat wire it is very simple all you need to do is follow my simple instructions.
Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Gluing trials continuing: Loctite is favourite (for Dispensemaster) Bonding: exercising the machine; practising in laying down patterns (Simon and.
WP3; 15 Jan 2015; John Wilson.1 Birmingham Update All back and operational after Christmas! Simon in contact with Dario Ariza at DESY re gluing (Boron.
Electronics for CEDAR Cristina Lazzeroni, Marian Krivda, Richard Staley, Xen Serghi, Karim Massri University of Birmingham, UK 3/5/
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November Phil Allport, Matt Baca, Daniel Briglin, James.
By Emily King Computer Definitions and Parts. NETWORK CARD A circuit board that has many special cables which connect the computer to the rest of the.
Figure 3-9: Implementing the Load Diverter CAUTION Do NOT connect the wires to the Diversion Load Controller or the terminal block at this point. IF.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
Powering tests with the PP2 regulator Laura Gonella Physikalisches Institut Uni Bonn.
Berkeley status Aug 10th, 2012.
Lab#1 UTP cables.
CUT40P training manual March.2011.
Cold Temperature Test Jig
→ need to guide UV light into gap; also beware temp effects
+ Steve Worm (since Monday)
How a computer works the most important parts of a computer
ITK Strip Module Meeting; 12st October 2015
Update from Birmingham
WELCOME.
Lab#1 UTP cables.
Thank You!! For More Information Visit: m/ Call to :
FPC panel 8in x 12in 28/09/2017.
Wirebonding UCSB FNAL Machines
How to build a computer.
Bruck APOLLOS / SPOT 90° mcgy Description
Presentation transcript:

TM Module Measurements (1) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John Wilson

TM Module Measurements (2) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October CMM measurements on Thermomechanical modules 33

Preparations for Irradiation of ABCN250 hybrids at Birmingham 10 th August 2015, Petal/Stave Meeting B'ham workshop has cut one empty V4 panels (from L'pool) into one- hybrid slices using a 'waterjet cutter' machine Simon checking how to clean the panels in preparation for wire-bonding 15m Cat5e network cable (PC-to-Atlys communication) tested in electronics lab with ITSDAQ, works ok Power cable testing: Using high-power resistors with heatsink and fan, run at 2.5V and 3.4A. To check voltage drop from control-room to coldbox. To safely hold hybrid on aluminium plate inside irradiation coldbox: Planning 3D-printed frame Strip Module Meeting; 26th October

ABC130 Single-Chip Board: Test system setup 10 th August 2015, Petal/Stave Meeting ABC130Driver board received from Peter – many thanks ! Simon has wiring-up 16pin Molex connector according to instructions on Twiki: (NB protective diode is fitted, Xilinx f/w already loaded). Then power-up ABC130Driver, adjust ITSDAQ config, get communication with Atlys going. We also have a single-chip ABC130 board with mini-sensor fitted, but for now won't connect it up, first gather some experience with ABC130Driver DAQload: Planning RAL visit for pick-up, to learn how to run them, wiring details etc Strip Module Meeting; 26th October