CDMS II Shielding To Installation To Construction From Design.

Slides:



Advertisements
Similar presentations
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Advertisements

COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
Construction and First Results of a Cosmic Ray Telescope M. P. Belhorn University of Cincinnati 12 June 2008.
Experimental Method Experimental Method Kihyeon Cho Kyungpook National University Spring Semester 2005 Experimental Method and Data Process.
The Angra Neutrino Detector Detector, VETO and electronics conceptual design Laudo Barbosa (May 18th, 2006) Centro Brasileiro de Pesquisas Físicas (CBPF)
Prototype of the Daya Bay Neutrino Detector Wang Zhimin IHEP, Daya Bay.
Design and First Results of a Cosmic Ray Telescope For Use In Testing a Focusing DIRC M. P. Belhorn University of Cincinnati The BELLE group at the University.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
How to Build a Neutrino Oscillations Detector - Why MINOS is like it is! Alfons Weber March 2005.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
        PMT Liquid Scintillator Gadolinium Loaded Lead Veto Hadronic Shower Liberated Neutrons High Energy Neutron No Veto, Small Prompt Energy.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
NuMI MINOS The MINOS Far Detector Cosmic Rays and their neutrinos are being collected now. How does this work, and of what use is this data? Alec Habig,
Forward Detectors and Measurement of Proton-Antiproton Collision Rates by Zachary Einzig, Mentor Michele Gallinaro INTRODUCTION THE DETECTORS EXPERIMENTAL.
Lance Garrison R. Cooper, H.-O. Meyer, T. Mikev, L. Rebenitsch, R. Tayloe, R. Thornton.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Characterization of Silicon Photomultipliers for beam loss monitors Lee Liverpool University weekly meeting.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
Status of Detector Prototype (for Hawaii meeting at Big Island) August 24, 2002 Yee Bob Hsiung For Koji Ueno, Yuri Velikzhanin Yanan Guo and Eddie Huang.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
12 February 2002 Cal Mtg - D0 Collaboration Alan L. Stone Louisiana Tech University ICD LED Run Status Purpose ADC to GeV Conversion Basics of ICD LED.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
PHOBOS TOF Construction Status
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
QUPID Readout and Application in Future Noble Liquid Detectors Kevin Lung, UCLA TIPP 2011 June 11, 2011.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb, Water, Helium.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Slide 1 UCSB CDMS Group Neutron Trigger. Slide 2 UCSB CDMS Group Neutron Trigger PROGRESS: à Electronics Fabrication Complete for SN1 à Simulation Work.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Electronics for Range System Prototype Tests
“Performance test of a lead glass
MoNA detector physics How to detect neutrons. Thomas Baumann NSCL.
Luminosity Monitor Status
Front-end electronic system for large area photomultipliers readout
Conceptual design of TOF and beam test results
first light! new laser driver board (revD)
BESIII EMC electronics
Particle ID Diagnostics in the MICE Beamline
TOF & BB FEE Safety Review
Presentation transcript:

CDMS II Shielding To Installation To Construction From Design

CDMS II Shielding The Layers Outer Polyethylene Outer Lead Layers Inner PolyethyleneInner Ancient Lead Mu Metal Shield

CDMS II Shielding The Polyethylene Lid Early Stage of Construction in UCSB HEP High Bay Lab August 1999 Completed Lid Assembled and Installed in Soudan Clean Room September 2000

CDMS II Shielding The Lead Lid Nearing Completion of Construction in High Bay Lab November 1999 Completely Assembled Lid as it’s Lowered onto the Soudan Clean Room Mezzanine September 2000

CDMS II Shielding The Poly & Lead Base In the midst of Construction at UCSB September 1999 Completion of Stage 1 of Soudan Installation September 2000

CDMS II Shielding Radon Protection Lead Lid in Aluminized Mylar Bag w/ Old Air Purge September 2000 Remainder of Lead Base in Mylar Bags June 2001

CDMS II Muon Veto 40+ High Voltage Lines Remote Controlled via Ethernet In-House Fan-Out & Charge Amp Circuit 40+ Signal Lines Commercial NIM Discriminators Commercial VME Time History Module Commercial VME Scalers Buffered PMT Signals Commercial VME Digitizers Amplified & Stretched PMT Signals Multi-channel Digital Lines

Acrylic Light Guide Glued at 45 o Angle Bicron Plastic Scintillator CDMS II Muon Veto Construction ( ) Armored PMT & Sides

241 Am CDMS II Muon Veto Light Collection Testing Summer 2000 DVM Matlab Scintillator Width Scintillator Length Collected Current (nanoAmps)

Achieved large muon-gamma peak separation (> 40pC for all panels). After calibrating, a Cs 137 source current measurement was made for each panel. This will allow offline re-tuning of the veto underground (w/o muons!) to within ~ 5% of the original calibration. Typical Side Panel Typical Top Panel CDMS II Muon Veto Cosmic Ray Calibration September pC 48pC

CDMS II Muon Veto Custom Electronics 8 Channel Prototype for SUF Run 21 Run 21 Low Background Veto Charge Spectra

Blue light from cone travels 60’ of optical fiber to right angle prism PMT converts light pulses to trackable calibration peak CDMS II Muon Veto Pulser Monitoring System EM Shielded Box Driver Circuit & LED Array Optically coupled prism reflects light into veto paddle

Shield –UCSB crew will finish passive shielding construction during next Soudan trip this spring. Stem deflection due to weight of lead and poly lids will be measured at this time. –Radon protection tent for detector installation to be designed, constructed and installed. Muon Veto –Future trip planned for arranging muon veto paddles around outer poly shielding. High voltage, signal and fiber optic cables will be installed at this time. The veto will be re-tuned with the 137 Cs source, and the pulser will be setup and tuned to give reasonable calibration peaks in all paddles (spring 2002). –Readout Electronics First version of printed circuit board layout for custom electronics is complete. Once the layout is finalized, boards will be fabricated, stuffed and tested at UCSB (spring 2002). NIM crates and LeCroy discriminators to be borrowed from Fermilab electronics pool. Some commercial VME electronics and crates remain to be purchased. CDMS II Shield & Veto Future Work

CDMS II Muon Veto Cool Pulser Pics!