Doc.: IEEE 802.15-99/045r1 Submission July 1999 Robert F. Heile, GTESlide 1 Things to Vote On Elect Slate of Officers-Term is through 802 Plenary Meeting,

Slides:



Advertisements
Similar presentations
Doc.: IEEE /265r0 Submission June 2001 Robert F. Heile, Consultant Steve Shellhammer, Symbol Technologies Slide 1 IEEE P Working Group for.
Advertisements

Doc.: IEEE Submission July 2009 Robert F. Heile, ZigBee AllianceSlide 1 61st Session of meetings of the IEEE Working Group for.
Doc.: IEEE /056 Submission March 1999 Ian Gifford, M/A-COMSlide 1 Working Group Report Wednesday, March 10, 1999 Wireless Personal Area Network.
Doc.: IEEE Submission March 2015 Motions and Supporting Material for EC Meeting Agenda Items Friday, March 13, 2015 Estrel.
Doc.: IEEE r0 Submission November 1999 Bruce Kraemer, Intersil and Ian Gifford, M/A- COM Slide 1 IEEE P Working Group for Wireless Personal.
Doc.: IEEE COEX 02/016r1 Submission May 2002 Jim Lansford, Mobilian CorporationSlide 1 IEEE 802 Wireless Coexistence Study Group Update Jim Lansford
Doc.: IEEE /083 Submission May 2000 Al Petrick, ParkerVisionSlide 1 Ad-Hoc Marketing Report Al Petrick.
Doc.: IEEE /084r0 Submission September 1999 Ian Gifford, M/A-COM and Bruce Kraemer, Intersil Slide 1 IEEE P Working Group for Wireless Personal.
Doc.: IEEE /441r0 Submission September 2001 Steve Shellhammer, Symbol Technologies Slide 1 IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE Submission March 2004 Tom Siep, TMS ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /101r0 Submission March 2000 Robert F. Heile, GTESlide th Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE /344r0 Submission November 2000 Bruce Kraemer, IntersilSlide 1 IEEE &.11 Working Groups Marketing Committee Working Group Report.
Doc.: IEEE /169r0 Submission December 1999 Ian Gifford, M/A-COM & Tom Siep, TISlide 1 IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /087 Submission September 1999 Richard J. Holleman, IEEE-SASlide 1 IEEE Standards Association IEEE, ETSI, and Bluetooth Meeting August.
Doc.: IEEE /012r0 Submission March 2003 Jim Lansford, MobilianSlide 1 Project: IEEE P Coexistence TAG Submission Title: March 2003 SEC Meeting.
Doc.: IEEE /080r0 Submission September 1999 Ian Gifford, M/A-COMSlide 1 IEEE P Working Group for Wireless Personal Area Networks ETSI Coordination.
Doc.: IEEE /0755r1 Submission July 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Portland, Oregon, July 12-16, 2004.
Doc.: IEEE /177r0 Submission January 2000 Ian Gifford, M/A-COM, Inc.Slide 1 IEEE P Working Group for Wireless Personal Area Networks TG1.
Doc.: IEEE /098r0 Submission March 2000 Robert F. Heile, GTESlide Thursday Report to the SEC Bob Heile, Chair, March 9, 2000.
Doc.: IEEE 802.RR-02/050r1 Submission March 2002 Carl R. Stevenson, Agere SystemsSlide 1 SEC Closing meeting March 2002 Agenda item 4.6 Reply Comments.
Doc.: IEEE 802.RR-02/050 Submission March 2002 Vic Hayes, Agere SystemsSlide 1 SEC Closing meeting March 2002 Agenda item 4.6 Reply Comment to FCC.
Doc.: IEEE COEX-01/014r0 Submission July 2001 Jim Lansford, Mobilian, Tim Blaney, CommceptsSlide 1 IEEE 802 Wireless Coexistence TAG Proposal Jim Lansford.
Doc.: IEEE /137r0 Submission May 2000 Robert F. Heile, GTESlide 1 Report on Thurs ExCom Meeting Minutes of Meeting Available on Flash Card and.
Doc.: IEEE /044r0 Submission July 1999 Robert F. Heile, GTESlide 1 1st Session of meetings of the IEEE P Working Group for Wireless Personal.
Bluetooth™-IEEE Working Group and IEEE P Working Group for WPANs Liaison Meeting Ian Gifford P Vice Chairman December 8, 1999.
Doc.: IEEE /146r0 Submission November 1999 Robert F. Heile, GTESlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /179r0 Submission July 2000 Bruce Kraemer, Intersil & Ian Gifford, Tyco Electronics / Marketing Committee Report La Jolla.
Doc.:IEEE Submission January 2005 James Allen, Appairent TechnologiesSlide 1 NOTE: Update all red fields replacing with your information;
Doc.: IEEE e SG4e Jan 2008 Pat Kinney, Kinney Consulting LLC Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE Submission November 2009 Robert F. Heile, ZigBee AllianceSlide 1 63rd Session of meetings of the IEEE Working Group.
Doc.: IEEE /018r1 Submission March 2000 Steve Shellhammer, Symbol TechnologiesSlide 1 IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 Motions Internal for LMSC 1 st Vice Chair (And supporting slides)
Doc.: IEEE /57 Submission March 1999 Bob Heile, GTESlide Working Group Report to ExCom Thursday, March 11, 1999 Wireless Personal Area.
Doc.: IEEE /069r0 Submission March 2000 Robert F. Heile, GTESlide th Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE /026r2 Submission July 1999 Robert F. Heile, GTESlide 1 Bob Heile, Chairman P Working Group Status Presentation to IEEE 802 Standards.
July 2003 Brian Mathews - AbsoluteValue Systems, Glyn Roberts – ST Microelectronics IEEE doc: IEEE / Submission Publicity Committee /.15.
Doc.: IEEE /024r1 Submission Jan 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Vancouver, Canada, Jan 12-16, 2004.
IEEE P Working Group for Wireless Personal Area Networks
IEEE P Working Group for Wireless Personal Area NetworksTM
IEEE Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [WG R2SG Opening Report] Date Submitted: [18Sep00]
July 2000 Bruce Kraemer, Intersil & Ian Gifford, Tyco Electronics.
IEEE P Working Group for Wireless Personal Area Networks
July 2001 doc.: IEEE /365r1 July 2001 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [WPAN.
IEEE P Working Group for Wireless Personal Area Networks
IEEE Working Group for Wireless Personal Area Networks (WPANs)
Hilton Hotel, Sonoma County
Submission Title: Closing Report for the TG4n Session in May 2012
Report on Thurs SEC Meeting-July 13, 2000
IEEE P Working Group for Wireless Personal Area NetworksTM
September 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, September 2002 Date.
Submission Title: WG Monday Report to 802
Executive Committee Meeting
Joint Study Group (ETSI-BRAN, IEEE , MMAC)
IEEE P Working Group for Wireless Personal Area Networks
46th Session of meetings of IEEE P802.11
Working Group Report Presentation to IEEE 802 Plenary July 9, 1999
IEEE P Working Group for Wireless Personal Area Networks
IEEE P Working Group for Wireless Personal Area NetworksTM
IEEE 802 2nd Vice Chair last name at ieee dot org
IEEE 802 2nd Vice Chair last name at ieee dot org
Regulatory ad-hoc Chairman (Vic Hayes)
IEEE Working Group for Wireless Personal Area Networks (WPANs)
IEEE Wireless Coexistence TAG
IEEE P Wireless Personal Area Network
May 2008 Closing Plenary Motions
IEEE P Working Group for Wireless Personal Area NetworksTM
IEEE Wireless Coexistence TAG
Submission Title: [WG Proposal to form Radio2 Study Group]
Presentation transcript:

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 1 Things to Vote On Elect Slate of Officers-Term is through 802 Plenary Meeting, March00 Adopt Proposed WG Rules doc # /001r6 Adopt regulatory rules doc # /142-r1 Establish TG1 to develop standard against existing PAR Form Study Group for Coexistence/Interoperability Form Study Group to develop recommended Marketing Activities for the WG. Formalize a position relative to NPRM on WBFH

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 2 Slate of Officers for Bob Heile, GTEChair Ian Gifford, M/A COMVice Chair Pat Kinney, IntermecSecretary Tom Siep, TITechnical Editor Mike McInnes, BoeingAsst Tech Ed/Sec

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 3 Motion: To approve the recommended slate of officers for to serve the remainder of the current term which ends in March 00. Moved:ivan Second:parviz All in Favor:34 All Opposed:0 Abstaining: Vote on the Officers Requires 75%

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 4 Vote on the Rules Motion: To approve document number 99/001r6 as the rules of operation for the Working Group. Moved:ivan Second:dick e All in Favor:34 All Opposed:0 Abstaining:0 Requires 50%

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 5 Vote on the Regulatory Rules Motion: To approve document number 96/142-r1 as the regulatory rules of operation for the Working Group. Moved:bruce Second:dick e All in Favor:34 All Opposed:0 Abstaining:0 Requires 50%

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 6 Vote on TG1 Motion: To form a Task Group designated TG1 develop a draft standard against the current Working Group PAR # /18/99 Moved:siep Second:kraemer All in Favor:35 All Opposed:0 Abstaining:0 Requires 75%

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 7 Vote on TG1 Chair Motion: To affirm Ian Gifford as the Chair of TG1 Moved:alan Second:ivan All in Favor:35 All Opposed:0 Abstaining:0 Requires 75%

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 8 Vote on Formation of SG for Coexistence/Interoperability Objectives of Group: Define Coexistence/Interoperability Issues Draft PAR defining work activity

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 9 Vote on Formation of SG for Coexistence/Interoperability Motion: To form a Coexistence/Interoperability Study Group to determine the need for a PAR and develop if necessary. Requires 75% Moved:dick e Second:ivan All in Favor:35 All Opposed:0 Abstaining:0

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 10 Vote on Formation of SG for Coexistence/Interoperability Motion: To affirm Steve Shellhammer as Study Group Chair Requires 75% Moved:ivan Second:alan All in Favor:35 All Opposed:0 Abstaining:0

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 11 Vote on Formation of Marketing Committee

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 12 Objectives of the WPAN Marketing Entity Collect and maintain the application and usage scenarios generated by the CFAs. Guide the formulation of documentation that clearly & distinctly differentiates the purposes and services of the various IEEE WPAN standards Support the dissemination of information about IEEE Working Group activities internally (among 802 working groups) and externally (among the electronics industry). Facilitate task groups in reaching convergence and consensus on technical requirements. Determine how best to promote the public demonstration of interoperability between products built using standards. Create and maintain liaisons with other selected industry marketing groups (e.g. Bluetooth, HomeRF) and standards bodies (e.g ETSI). Foster two-way communications between suppliers and consumers of WPAN products. Encourage and foster creation of value-added industry marketing groups as appropriate (e.g. Gigabit Ethernet Alliance, Source 99/031r4

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 13 Marketing Study Group Officers Chairman: Bruce Kraemer Vice Chairman: TBA Secretary: TBA Editor: TBA

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 14 Vote on Formation of Marketing Committee Motion: To form a Marketing Committee to implement recommendations in Doc #99/031r4 Requires 50% Moved:alan Second:fisher All in Favor:35 All Opposed:0 Abstaining:0

doc.: IEEE /045r1 Submission July 1999 Robert F. Heile, GTESlide 15 Votes on Regulatory Issues Review and vote on motions in doc 99/151