1. 2  42 people for the meeting is nice and it shows how spirited active we are.  It shows to the outside world the level of activities  Everybody.

Slides:



Advertisements
Similar presentations
UK CALICE plans Birmingham, Cambridge, Imperial, Manchester,RAL,RHUL,UCL.
Advertisements

J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Introduction Felix Sefkow HCAL main meeting February 14, 2006.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
Snowmass 25 AugustMark Thomson 1 PFA Progress and Priorities Mark Thomson (for Steve Magill, Felix Sefkow, Mark Thomson and Graham Wilson)  Progress at.
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
30 October 2002Paul Dauncey - CALICE/PRC1 PRC – CALICE Progress Report Paul Dauncey, Imperial College London Representing the CALICE Collaboration.
CALICE-UK Status Marcel Stanitzki Rutherford Appleton Laboratory.
1 Calice UK Meeting 03/11/06David Ward/Nige Watson Analysis tasks David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint manual before you.
Report from CALICE meeting CERN 9/23-23/2002 Andy White Web Site for meeting: agenda_CALICE_23090.html.
KEK meeting – September 2006 J.-C. Brient (LLR) 1 Jean-Claude BRIENT LLR – Ecole Polytechnique LLR – Ecole Polytechnique CALICE status and Plans.
18-22 Oct 2010, IWLC2010 in Geneva K. Kawagoe / Kobe University Disclaimer: 27 presentations in 5 sessions on Wednesday/Thursday & Workshop dinner on Wednesday.
Progress with the Development of Energy Flow Algorithms at Argonne José Repond for Steve Kuhlmann and Steve Magill Argonne National Laboratory Linear Collider.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;
GLD Calorimetry 2005/Mar/03 K. Kawagoe / Kobe-U. Introduction Current design –To be optimized for Particle Flow Algorithm (PFA) aiming at 30%/sqrt(E)
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
UTA GEM DHCAL Simulation Jae Yu * UTA DoE Site Visit Nov. 13, 2003 (*On behalf of the UTA team; A. Brandt, K. De, S. Habib, V. Kaushik, J. Li, M. Sosebee,
CALICE meeting - ANL 1 I am sad to announce you that Vincent Lepeltier died this morning by heart attack He was a strong supporter of ILC in France Working.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
5/12/2007 CALICE Meeting, Kobe Univ. J. Yu, UTA 1 Technical Board Review Report Forewords Review Goals Review results: Finding, Risks and Recommendations.
1 Progress from José Repond Argonne National Laboratory LCWS 2007, DESY, May 30 – June 3, 2007 Emphasis on test beam results.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
Marcel Stanitzki Rutherford Appleton Laboratory
Final CALICE OsC meeting: Status and summary of project
The European DHCAL status
CALICE News The 2007 beam tests have started!
Status of Ecal(s) for ILD
(My personal) CALICE Report
C. de La Taille IN2P3/LAL Orsay
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Technical Board – DCAL Software
Calice Tile-HCal and Tail-catcher/Muon Tracker
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Presentation transcript:

1

2  42 people for the meeting is nice and it shows how spirited active we are.  It shows to the outside world the level of activities  Everybody understand that this successful meeting will help a lot in our discussion with R&D panel review, with CERN and FNAL for our test beam demand, but it could also help in the discussion with the funding agencies  The KOBE meeting is also a nice way to shows that CALICE is transversal for he detector concept PFA based (GLD, SiD or LDC). Yes, we are not 4th concept !!! CALICE meeting - KOBE university

3 ECAL : W-Si > we are closing the first generation prototype completion (some problem, but GLOBALY very nice behavior) > we are entering the complete (?) prototype in test beam > we are entering period of TB analysis (including discovery of pbs, performances, etc…) > we are entering the design period of the second generation prototype (the one as closer as possible to the final detector) MAPS option is a TPC Making progress, TB very soon, interesting to see the ultimate digital em cal ECAL : W-SCintillator  First period of test, but seems very fruitful ( PERFECT to shows to the panel at LCWS07 : “YES, we are a collaboration”) First prelim number on energy resolution !!! YES, we are an open collaboration (Kyungpook is still not officially in the collaboration, but they participate to the DESY TB and analysis)  MPPC (Si PM) are still under investigation and progressing for future (Who know the dynamic of MPPC/Si PM in 5 years) ?? Tera Pixels Calorimeter

4 Tile HCAL > Test Beam preparation with New table, full HCAL layers (some consultation of the ECAL groups would have been better, before to establish all the agenda)  A very interesting comparison of the advantages and drawbacks of SiPM/MPPC but also road to improvement (Misha) > Strip option presented by Tohru remains interesting even if software effort would help before to proceed Gas HCAL  HaRDROC is under study and will be used very soon on small size layer (RPC-PCB-VFEon-DAQ ) plan for 1 m²  DAQ side using HaRDROC seems well covered on digital side (analog ???)  GEM test underway (including beam damage test … almost a hole in the GEM plane. IF MONEY ARRIVE, plan for m3 prototype in 2008  Vertical slice test in June, Plan for m3 in 2008 … CALICE is already at FNAL

5 VFE and DAQ  SPIROC, SKIROC, HaRDROC … the Orsay’s trilogy Design, test and very nice progress (and some delay…)  Even if it remains a lot of work, the need for the EUDET is covered as well as the one for DHCAL in beam still in the goal ? Do I understand correctly that we can have all the VFE for 3 detectors for 150K€ for ORSAY chip ??  DAQ in UK … a lot of progress in the design of the new DAQ. (emulate VFE chip with FPGA) but also on communication, study of the SEU (seems not a pb) First prototype in mid 2008, DAQ ready in 2009 (manpower pb ??) Honestly, the large number of groups doing SiPM test is nice, but it also would be interesting to give the information that we need also contributions other domains … i.e. on-line domain !!

6 TB Analysis  Closer & closer to a first note and publication in ECAL analysis (Prague, Clermont, Grenoble, LLR, Cambridge, Birmingham, London, and FNAL etc…) …. Impressive list … Energy resolution, gap between wafers, longit. profile, position and angular resol.  HCAL em shower (much better than before)  HCAL hadronic shower (YES, We can have compensation !!!) I think the weekly analysis meeting are VERY efficient and contribute deeply to the high quality and good advancement of the analysis We can congratulate Nigel and David for it

7 Software  Simulation - MOKKA – for test beam we have a very nice tools !!! (scintillator ECAL DESY TB remains to be implemented ) When possible : Common Feature define a collaboration  SOFTWARE package - GRID … GRID …. And GRID but also LCIO conversion, Recons. Package, Data Storage, etc… “CALICE is using the grid probably more and better than LHC experiment” (Someone from Computing Center Lyon speaking about data flow distribution (MC or real data) ) Thanks you to Roman for his incredible work and availability to help

8 1 - New groups are continuously joining > Heidelberg very soon > Korean group in discussion > Belgium also in discussion 2 - FNAL propose to have postdoc, fellow and seniors 1 year position (please contact Jae Yu for more information)

9 We ask for a lot to recognize our work outside of CALICE We have to be strong and successful 2006 was a very successful year with test beam at CERN, preparation of the VST at FNAL What about 2007 > Test beam 2007 at CERN > Review of LCWS 07

10

11 We ask for a lot to recognize our work outside of CALICE We have to be strong and successful 2006 was a very successful year with test beam at CERN, preparation of the VST at FNAL What about 2007 > Test beam 2007 at CERN > Review of LCWS 07 > analysis of the 2006 data !!! At longer term (2008) > design of the second generation prototype for AHCAL, ECL W-Si, ECAL Scint. first generation for DHCAL, HCAL-Scint. Strip > Installation at FNAL NEXT MEETING > Second half of September 2007 in Prague > February 2008 at ANL or FNAL

12 Thanks to Professor Hiroshi Takeda for his hospitality Thanks to Professor Kiyotomo Kawagoe for the nice organization (Daniel Jeans & administrative people) (without forgetting the fantastic dinner yesterday !!) Thanks to all people helping for a successful meeting