Gemini Release 4 UKLC Update 8 th February 2007. Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
144A – Calculation of Value at Risk (VAR) Simon Trivella – 24 th May 2007 Distribution Workstream.
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Project Nexus Workgroup Unique Sites 4 th November 2014.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
NTS Update Gas Customer Forum 25 th September 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Transfer & Trades Special Transmission Workstream
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Transfers and Trades Transmission Workstream
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
UKL13950 UK Link Committee 14 th February 2008 COR880 Gemini 2008 Release (Summer)
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
Pending changes to mod 500 WG(6) – CAM-CMP. Final Mod Updates  Add in Charging Objectives  Change to table in Charging Methodology Section.  Clarify.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transfers and Trades Special Transmission Workstream
1 COR2789 Measures to Address Unregistered & Shipperless Sites October 2014.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
UNC Modification Proposal 0097: Modification to release aggregated ex-post information for pipeline interconnector offtake flows Christiane Sykes E.ON.
Entry Capacity Overrun price calculation
UK Link Technology Refresh
Introduction of Code Contingency Guidelines Document
Transmission Workstream 4th July 2007
NTS Entry Charging Review Update
Distribution Workstream UNC Modification 0224 Draft UKLink Implementation Summary Responses 26th February 2009.
COR1072 Enduring Transfer and Trade Arrangements
UNC 0621L: Amendments to Gas Transmission Charging Regime
7th July 2011 Transmission Workgroup - Elexon
Transmission Workgroup June 7th 2012
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
DSC Change Committee Summary – 10th October
COR1072 Enduring Transfer and Trade Arrangements
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
DN Interruption & Charging
Introduction of Code Contingency Guidelines Document
DSC Change Committee Summary – 13th March ‘19
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
DSC Change Committee Summary – 13th February ‘19
UNC 0621L: Amendments to Gas Transmission Charging Regime
Entry Overrun Calculation
Additional Gemini API’s UK Link - Class 3 Modification
Optimisation of Entry Capacity Modification Proposal
Project Update Design, Build and System Test completed.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime Distribution Workstream Update Following Completion of Analysis 23rd.
Implementation Approach Distribution Workgroup – June 2014
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Customer Issue Management CoMC Update
DSC Change Committee Update
High Level System Solution Impact Assessment
DSC Change Committee Update
Customer Issue Management CoMC Update for April & May 2019
DSC Change Committee Update
DSC Change Committee Update
Presentation transcript:

Gemini Release 4 UKLC Update 8 th February 2007

Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation Date of 29 th April 2007  Reduced notification period  Approval of updated file format for the following:  NTE – NTS Entry Capacity Invoice  The following file format changes have been removed due to the non-implementation of the relevant UNC modifications:  ECO – Entry Commodity Invoice (Mod 120v)  MEI – Meter Energy List Input file (Mod 97)  MEO – Meter Energy List Output file (Mod 97)  The Outage window will be 4am to 9am (with a contingency of 11am)

User Change Impacts in Summary  SO Commodity (Mod 120v – Non-Implementation)  New NCE charge rows on Entry Commodity Invoice  Publish Interconnector Offtake (Mod 97 – Non Implementation)  Amendment to MEI (Meter Energy Input) interface file  Amendment to MEO (Meter Energy Output) interface file  NTS Entry Capacity Overrun Price Calculation (Mod 119 – Mod Panel Recommended for Implementation, awaiting Ofgem decision)  New allowable values within the Price Methodology field.  NTS Entry Capacity Transfers (Impending mod following 118 withdrawal)  No User amendments required

NTS Entry Capacity Overrun Price Calculation Modification 0119  Introduction of 1 new price type  ECRP (Entry Capacity Reserve Price) = A multiplier * Highest Reserve Price of any firm Method of Sale  Modification to the existing price types to change from top 25% Weighted Average Price to Highest acceptable price  EBBH = A multiplier * Highest Accepted Entry Capacity Buy Back Price  EBFH = A multiplier * Highest Accepted Entry Capacity Forwards Price  EBOH = A multiplier * Highest Accepted Entry Capacity Options Price  This will result in three new Price Type codes for the above.  HFCP (Highest Firm Capacity Price) remains the same.  Overrun Quantity will be multiplied by the highest price of HFCP, ECRP, EBBH, EBFH or EBOH. The new Price Types will be included on the Invoice file format in Overrun charge records.

NTS Entry Capacity Transfers  New Method of Sale will be created to identify the Transfer Auction  Publish of Invitation to Bid for Capacity will utilise the same functionality  Bid Capture will utilise the same functionality. New screen rejection message introduced when capacity is not available for a sub-transaction period at an Entry Point.  Publish Results will be done using the existing functionality.

Gemini Release 4 – UKL13830  UK Link Committee is requested to approve the following:  Class 1 change to make an amendment to the description of the G09 record (NTS_ENTRY_COMMODITY_ADJUSTMENT_RECORD) on the ECO – Entry Commodity Invoice file.  Addition of “The first character is signed – if it drives a payment to the user” to the description.