1 First wall mods status NCSX SIT Meeting Aug 12, 2002 Points at 0, 30, 60 degrees from Art Points x 1.025 and 1.00 in cross sections First try at vessel.

Slides:



Advertisements
Similar presentations
1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.
Advertisements

Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
HEL pre-design Diego Perini Superconducting solenoid Operation temperature: 4.2 K, current:about 250A, magnetic field: 5 Tesla Cooled by liquid.
RF Layout 3pi/2 for Discussion. 2 RF Design mtg 14/1/15 Output line from amplifier is lower than the PRY, needs to go high to clear PRY to couple to South.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
WBS3 Diagnostics Planning Update Presented by B. Stratton with input from T. Brown, M. Cole, E. Fredrickson, R. Feder, P. Goranson, L. Guttadora, D. Johnson,
SOL Vacuum Vessel FS Shield Gap Thickness (cm) FW Gap + Th. Insulator Winding Pack Plasma ≥  ≥ 149 cm | | Coil Case & Insulator Blanket.
1 Configuration Development for HIF Final Focus Superconducting Quadrupole Array HIF Final Focus Meeting July 2, 2002 Tom Brown Chang Jun Phil Heitzenroeder.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Maintenance Schemes For ARIES-CS X.R. Wang a S. Malang b A.R. Raffray a and the ARIES Team a University of California, San Diego, 9500 Gilman Drive, La.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
PFC meeting 9-11 May 2005 PPPL CDX-U E-beam experiments on CDX-U Presented by Dick Majeski R. Kaita, T. Gray, H. Kugel, J. Spaleta, J. Timberlake, L. Zakharov.
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
pkm- NCSX CDR, 5/21-23/ Power and Particle Handling in NCSX Peter Mioduszewski 1 for the NCSX Boundary Group: for the NCSX Boundary Group: M. Fenstermacher.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003.
Defining the Vacuum Vessel Geometry NCSX Project Meeting November 27, 2002 Art Brooks.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
Hall D Target Design Status Jim Fochtman- February 22, 2012.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
D. A. Rasmussen, NCSX Research Forum 2006 Page 1 ECH and Fast Wave Electron Heating Systems for NCSX Tim Bigelow, Dave Rasmussen, Phil Ryan, Mike Cole.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
1 NCSX WBS HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
June 10, 2004Modular Coil Winding & Cooling WorkshopJ.H. Chrzanowski 1 Modular Coil Cooling Issues With Baseline & Status of Cooling R&D James H. Chrzanowski.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
Surface Area Circles. Area of Circles How could we find the area of a circle?
1 First wall mods status NCSX SIT Meeting July 1, 2002 Points at 0, 30, 60 degrees from Art Points x in cross sections RF launchers bigger issue.
Stellarator Core Machine Configuration NCSX Project Meeting Dec 19-20, 2000 B. Nelson, M. Cole, P. Fogarty P. Goranson, G. Jones, D. Williamson O AK R.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Wayne, The upper and lower guides are now small enough in mass so they can be made directly from the CAD models by stereolithography, and at a reasonable.
1 NCSX radial build NCSX Project Meeting December 18, Modular coil build assumptions 2.Vessel build assumptions 3.FW/internal build assumptions.
General Rules of Dimensioning
Updates of the ARIES-CS Power Core Configuration and Maintenance
Instrumentation for status monitoring of SST-1 superconducting magnets
MQXC Nb-Ti 120mm 120T/m 2m models
Design of the Injection Can
RF Layout 3pi/2 for Discussion
SECTIONAL VIEWS.
Stellarator Divertor Design and Optimization with NCSX Examples
Requirements of the support mechanics
Design of Distribution Feedbox at LHC P7
Hall C Down Stream Beam Pipe And Dump Interface Design
DCLL TBM Design Status, Current and future activities
Heat flux width scaling in ITER limiter configurations
Additional Upstream Coil Shielding
CEPC-650MHz Cavity Cryomodule
Summary slide for Conceptual Design Study for Heat Exhaust Management in the ARC Fusion Pilot Plant, E.A. Tolman et al., IAEA- FIP-P1-22 Introduction ARC,
IR Beam Transport Status
IMAGING OF SST-1 PLASMA WITH LHCD POWER
Presentation transcript:

1 First wall mods status NCSX SIT Meeting Aug 12, 2002 Points at 0, 30, 60 degrees from Art Points x and 1.00 in cross sections First try at vessel mods Dave is trying to fix winding surface

2 Model RF launcher locations, typ 6 places FW panels, 360 deg shown Modular coil partial assembly Vessel with insulation

3 Plan cross section 10 deg 0 deg 20 deg 30 deg 40 deg 50 deg 60 deg RF launcher locations Trim coils

4 Cross section at 0 degrees  Trim coils intersect this section  Almost all points are inside first wall

5 Cross section at 10, 20 degrees  Points not available yet  Trim coils intersect 10 deg section 20 deg 10 deg

6 Cross section at 30 degrees  Trim coils do not intersect this section  Closest approach to first wall

7 Vessel mods, try 1 First wall, as modified Original vessel modified vessel 30 deg points

8 Cross section at 30 deg, with mod1 First wall, as modified Points not bloated Points bloated 2.5%

9 Cross section at 40, 50 degrees  Points not available yet  RF launchers intersect these sections 40 deg 50 deg Co-ax Faraday shield

10 Cross section at 60 degrees  Field joint and limiters are around this section  RF launchers on either side  Almost all points are inside first wall

11 Cross section at 60 degrees

12 Cross section at 60 degrees First wall, as modified Points not bloated Points bloated 2.5%

13 Cross section at 60 degrees  Cross section changes abruptly  Limiter visible in this view  RF launchers on either side of this section mostly hidden by limiter limiter

14 RF launcher options  Reduce number of straps to 4 instead of 6 per section  Less power?, unless strap lengths can be increased  Reduce coax to 4 inches instead of 6, maybe smaller  Move feeds farther out by running strap through “tunnels” to get straight-in shot at feed, but need more than 3 cm behind FW in these areas.  Incompatibility with inside launch and divertor operation?

15 PFC panel / rib detail  Details for one concept for panel attachment developed with BFG Aerospace Plasma Vacuum vessel Heated / Cooled Rib Thermally insulated connection to vessel Panel installed Panel ass’y retracted