Faculty of Physics, University of Belgrade General meeting, Wroclaw 28 th of January, 2014. ToF-L/R HV Upgrade, Status and Plans Jovan Puzović, Faculty.

Slides:



Advertisements
Similar presentations
Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
Advertisements

LKr for the dry run (and not only…) R. Fantechi 23/5/2012.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
Faculty of Physics, University of Belgrade General meeting 3 rd of June, ToF-L/R Performance Marjan Ćirković, Faculty of Physics, Belgrade.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
06/04/2012Steve Hahn — AEM Meeting1 MINOS Status Report Rack cleanup –All racks vacuumed –All filters cleaned –Wiener power supply/chassis checked for.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
LHC Collimators Low Level Control Commissioning Status A Masi, LHC Collimators Low Level Control Commissioning Status LHC Collimators Low Level Control.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
The recent history and current state of the linac control system Tom Himel Dec 1,
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
We really need to check all the results showed. We change the GEM from the fully-well-shielded to the less shielded one (top- bottom-fan out with aluminum)
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Move 2 racks G16-RR2-4 G16-RR2-3. G15-PP-01 CKT G15-PP-01 CKT G15-PP-01 CKT G15-PP-01 CKT 8 G15-PP-01 CKT Power Feed.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Steven Worm – RutgersMar 25, CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC,
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Faculty of Physics, University of Belgrade General meeting, 19 th of May, Pixel/Connectors Checking Jovan Puzović, Faculty of Physics, Belgrade.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, 10 th of October, Remote control and monitoring of ToF-L/R detector Jovan.
Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
General aspects: Optical links :
RPC Barrel HV & LV system Lappeenranta University
NA61 news and plans (October 2012 – May 2013)
NA61 news and plans Results, results, results ... π- + C → h- + X
Pierluigi Paolucci - I.N.F.N. Naples
RPC Detector Control System
RPC Detector Control System
LHC BIF test setup - update
CSC Shift Training and Operation + B904 Status
Presentation transcript:

Faculty of Physics, University of Belgrade General meeting, Wroclaw 28 th of January, ToF-L/R HV Upgrade, Status and Plans Jovan Puzović, Faculty of Physics, Belgrade

Faculty of Physics, University of Belgrade General meeting, Page 2 out of 9 Jovan Puzović, Belgrade SHINE team Overview -Current status after January works: 1) 2 Caen crates (right 1 and 2) removed from rack 2) 2 BG crates installed instead 3) 20 Custom made HV Distributors installed 4) Both crates connected via RS485 link to computer in counting room 5) Connection established, beta version of monitoring program working well

Faculty of Physics, University of Belgrade General meeting, Page 3 out of 9 Jovan Puzović, Belgrade SHINE team Current status All hardware finished!

Faculty of Physics, University of Belgrade General meeting, Page 4 out of 9 Jovan Puzović, Belgrade SHINE team Current status -Crates R-1 and R-2 installed in the pit (20 distributors) -Connection established, demo monitor program works -4 pixels monitored with PSI DRS4 protoboard for 3 days with old CAEN HV supply -Then monitored for 3 days with BG HV supply -Amplitude spectra identical!

Faculty of Physics, University of Belgrade General meeting, Page 5 out of 9 Jovan Puzović, Belgrade SHINE team Amplitude spectra

Faculty of Physics, University of Belgrade General meeting, Page 6 out of 9 Jovan Puzović, Belgrade SHINE team Amplitude spectra

Faculty of Physics, University of Belgrade General meeting, Page 7 out of 9 Jovan Puzović, Belgrade SHINE team Perfomance -Readout cycle ~ 8s -Preliminary calibration of HV readout for R-2-9 was made -HV readout precision: better than 1V on 1400V -Statistical fluctuation (sigma): less than 0.5V

Faculty of Physics, University of Belgrade General meeting, Page 8 out of 9 Jovan Puzović, Belgrade SHINE team Plan -Still needs some nuts and bolts for HV connectors! -To finish upgrade needs 5-6 working days: 2 days – removing 2 CAEN crates, far from the beam 1 days – installing 2 BG crates 2 days – testing and calibrating of HV readout -Foreseen for summer this year

Faculty of Physics, University of Belgrade General meeting, Page 9 out of 9 Jovan Puzović, Belgrade SHINE team Thank you!