9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.

Slides:



Advertisements
Similar presentations
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Advertisements

June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 1 M. Sullivan for the PEP-II Team DOE Operations Review of the PEP-II B-Factory June 15-17, 2004.
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
MAC Review December 13-15, 2004 IR Upgrade M. Sullivan 1 Interaction Region Upgrade M. Sullivan for the Machine Advisory Committee meeting December 13-15,
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
01/07/2005 SN 1 of 16 Esti mation of HOM Power in the Interaction Region of ILC Sasha Novokhatski Session “Beam RF Effects” ILC MDI Workshop SLAC January.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Topics from this weeks 2E34 meeting M. Weaver Jan 6, 2006.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
SLAC Accelerator Department PEP-II Future Plans and Parameters John T. Seeman PEP-II MAC Meeting December 13, 2004.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
SR Vacuum Systems and Front Ends
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Synchrotron radiation at eRHIC Yichao Jing, Oleg Chubar, Vladimir N. Litvinenko.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
Interaction Region Vacuum Chamber Upgrades Presented by: Scott DeBarger Contributors: D. Arnett, B. Bigornia, C. Carr, J. Langton, S. Metcalfe, D. Kharahk,
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
AEC09, CERN Mauro Pivi, SLAC TiN chambers and SEY measurements in PEP-II M. Pivi J. Ng, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper, C. Spencer, B.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
M. Sullivan International Review Committee November 12-13, 2007
John T. Seeman DOE PEP-II Operations Review April 26, 2006
Vacuum System Failures at HERA
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
CEPC Vacuum System Dong Haiyi 2017/11/5.
The PEP-II Interaction e+e- Factories Workshop
A.Kulikov SLAC MAC review October 2003
PEP-II Status and Plans e+e- Factories Workshop
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
J. Seeman Assistant Director for PPA/LCLS
Electron Collider Ring Magnets Preliminary Summary
Some of the Points Raised During my JLAB Visit
IR/MDI requirements for the EIC
Presentation transcript:

9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee

S. DeBarger 9 October 2003 S. Ecklund W. Kozanecki D. Kharakh A. Kulikov N. Kurita J. Langton S. Metcalfe A. Novokhatski J. Seeman M. Sullivan U. Wienands D. Wright

S. DeBarger 9 October 2003 Outline of Topics Introduction to HER & LER Vacuum Systems Present Performance Assessment Vacuum Failure Statistics from Run Future Performance Requirements

S. DeBarger 9 October 2003 Introduction to HER & LER Vacuum Systems High Energy Ring (HER) Arcs Copper vacuum chambers Distributed Ion Pumps (DIPs) in dipole chambers Conventional ion pumps located adjacent to quadrupoles Synchrotron Radiation absorbed along the length of the dipole chambers and at discrete masks in the quadrupole chambers Low Energy Ring (LER) Arcs Aluminum vacuum chambers Titanium Sublimation Pumps (TSPs) and conventional ion pumps located on pumping chambers Synchrotron Radiation absorbed on discrete photon stops located at the end of each pumping chamber

S. DeBarger 9 October 2003 Introduction to HER & LER Vacuum Systems Straight sections (HER & LER) Primarily stainless steel vacuum chambers with conventional ion pumps and discrete masks to absorb synchrotron radiation Interaction Region (IR-2) Primarily copper and stainless steel chambers Non-Evaporative Getter pumps (NEGs), Titanium Sublimation Pumps (TSPs) and conventional ion pumps Discrete masks to absorb synchrotron radiation Higher Order Mode (HOM) heating is a concern (due to the many changes in vacuum chamber cross section in this region)

S. DeBarger 9 October 2003 Present Performance Assessment Beam-gas interactions are not driving lifetime in either the HER or the LER, or backgrounds in BaBar, however a significant fraction (>50%) of the integrated radiation dose to BaBar comes from beam-gas interaction (W. Kozanecki et al,Sep-03) HER Lifetime 300 top of fill (1.1 A), 500 bottom of fill; Lifetime > 2000 low current (400 mA) LER Lifetime 100 top of fill (1.5 A), 200 bottom of fill: 1100 low current (100 mA) PEP TSPs flashed ~9 times during the run from Nov 02 to Jun 03

S. DeBarger 9 October 2003 Present Performance Assessment Vacuum pressure generally better than PEP-II Conceptual Design Report specified PEP-II CDR: 10 nTorr in Arcs, 1 nTorr in Straights Note: Pumps in the HER Arcs see scattered electrons, causing unrealistically high readings 1A 1.5 A

S. DeBarger 9 October 2003 Present Performance Assessment Temperatures at present currents are not globally an issue All LER bellows have had cooling fans added (summer 2003) 1A 1.5 A

S. DeBarger 9 October 2003 Vacuum Failure Statistics from Run There were 139 vacuum problems reported during the PEP-II Run. 23 of the 58 PEP ring vacuum reported problems were located in PR02 (Interaction Region). Most (85%) of PEP vacuum reported problems did not interrupt beam operations. Bad VACP power supplies, open TSP filaments, overheating bellows were all addressed through scheduled maintenance activities.

S. DeBarger 9 October 2003 Vacuum Failure Statistics from Run - Downtime 7 vacuum events resulted in loss of beam time in PEP-II Run. Total Beam Time lost and attributed to Vacuum Systems was hours. Actual negative impact on integrated luminosity is greater than this number suggests; does not count for periods of reduced current running or periods when PEP is running but BaBar cannot take data due to high backgrounds. Also, some follow-on activities become “Scheduled Off” time (i.e. NEG activation). Vacuum failures, while infrequent, generally require extended times to repair. This can be attributed to the relative inaccessibility of the devices, the necessity to transport and set-up leakchecking equipment, and the procedures followed when working with UHV systems.

S. DeBarger 9 October 2003 Vacuum Failures Causing Machine Downtime Elliptical Vacuum Valve Failure - Beam Time Lost hours LER Frangible Link - Beam Time Lost hours Mystery Pressure Bump Near IP - Beam Time Lost hours LER Arc 1 Pumping Chamber - Beam Time Lost hours Q2 Chamber - Beam Time Lost 50.1 hours These five incidents contributed of the hours of downtime attributed to vacuum failures during the PEP-II run

S. DeBarger 9 October 2003 Future Performance Requirements Existing devices were generally designed to operate at 3 Amps, 9 GeV HER and 3 Amps, 3.5 GeV LER In the Interaction Region this was not achieved – several items were designed for 2 A, 9 GeV HER and 2.1 A, 3.1 GeV LER Shorter bunch length will increase HOM heating New Interaction Region design could have new orbits and beam stay-clear values For operation at 3.6 A, 3.1 GeV LER, SR power will be 74% of CDR level For operation at 4.5 A, 3.1 GeV LER, SR power will be 92% of CDR level

S. DeBarger 9 October 2003 Future Performance Requirements Must reanalyze and potentially rebuild 17 vacuum chamber, mostly in the Interaction Region (see N. Kurita file V:\AD\Drop Boxes\Kurita- DeBarger\PEP-IIVacShortList.xls ) to survive higher LER currents LER bellows must be redesigned and replaced to reduce HOM heating at high currents LER Arc 3 HOM absorber (A. Novokhatski, J. Langton) has been effective, may need to deploy at more locations

S. DeBarger 9 October 2003 Future Performance Requirements Improve performance of RF sealed vacuum valves Reduce pressure in the LER upstream of BaBar? Improved vacuum instrumentation Residual Gas Analyzers More gauges Gauges which read at lower pressures

S. DeBarger 9 October 2003 Summary Both the HER and LER vacuum systems meet or exceed performance specified in the PEP-II CDR Moving to higher LER currents and shorter bunch lengths will require reanalysis and potential redesign of a significant number of vacuum chambers LER bellows will require a redesign for high current operation All vacuum designs must be robust, as vacuum failures lead to large losses in integrated luminosity