52, 060 Ac. Cap.3.859 TMC Cap. 3.260 TMC 28, 000 Ac. Under Progress.

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
Kalpsar : A kayakalp project Biggest Tidal project in the world envisaged S R Awasthi.
Pranahita – Chevella Project PHASE - II
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
Neotech Institute of technology Department of Civil Engineering
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
PRESENTATION BY Manaranjan Mali, Addl.P.D Technical, DRDA, Nabarangpur.
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
Corporate Office Ambience Corporate Tower, Ambience Mall, Ambience Island NH-8 Gurgaon
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
WEL COME PANCHAYAT SAMITI, MUNIGUDA. 1. Updation of information in the online module relating to Muster Roll, MB entry * Online entries are made on the.
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
Format for Presentation on Innovative Practices for States TWO DAYS CONFERENCE OF CEOs OF SLNA STATE :GUJARAT TO REVIEW IMPLEMENTATION OF WDC-PMKSY (ERSTWHILE.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
Hyderabad city water supply system
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Virtual Review - #61 by Chief Minister Dt
Polavaram Irrigation Project
#80 Virtual Review by Hon’ble CM dt: 5 Nov. 2018
Polavaram Irrigation Project
#28 Site Visit of Hon’ble Chief Minister Dt. 22nd October, 2018
Polavaram Irrigation Project
#79th Virtual Review by Hon’ble Chief Minister Dt. 29th October, 2018
Polavaram Irrigation Project
#82 Virtual Review by Hon’ble CM dt: 19th Nov. 2018
Polavaram Irrigation Project
#85 Virtual Review by Hon’ble Chief Minister, Dt. 21st January 2019
#87 Virtual Review by Hon’ble Chief Minister Dt: 04 FEB 2019
#89 VIRTUAL REVIEW BY HONBLE CHIEF MINISTER Dt. 25th FEBRUARY 2019
Polavaram Irrigation Project
#86 Virtual Review by Hon’ble Chief Minister, Dt. 28th January 2019
Presentation transcript:

52, 060 Ac. Cap.3.859 TMC Cap. 3.260 TMC 28, 000 Ac. Under Progress

GUNDLAKAMMA RESERVOIR PROJECT 1 Project Profile: Across river Gundlakamma near Chinnamallavaram (V), Prakasam District 2 Administrative Sanction : G.O.Ms.No.163, Dt.27-10-2003 2. Rs.165.22 Crs. G.O.Ms.No.243, dt.28-12-05, Amt. Rs.453.85 Crs. 3 No. of EPC Packages 2 No 4 Agreement value of 2 packages Rs.238.47 Crs. 5 Budget provision for 2006-07 Rs.225.00 Crs. 6 Expenditure of the project 2004 – 05 Rs. 29.52 Crs. 2005 – 06 Rs. 69.89 Crs. Cum. Exp. Rs. 99.41 Crs 7 Utilisation 14 TMC 8 Ayacut New Ayacut 80,060 acres 9 Drinking water 2.56 Lakh people 10 Land Acquisition Required 7891 acres Requisitioned 7051 acres Acquired 3262 acres

11 Estimated Cost of LA : Rs.111.00 Crs. 12 Estimated Cost of R & R Rs.65.00 Crs. Clearances CWC & Environmental Clearance obtained 13 Mob. Advance (Rs. in Crores) Paid Recovered 2004-05 11.93 1.30 2005-06 -- 3.41 Total 11.93 4.71 14 Target date of completion 8/2007

GUNDLAKAMMA RESERVOIR PROJECT PKG No. Description Agt. Value & Date Agt. Period Name of the contractor 1 Formation of Left Earth dam including construction of Left sluice & spillway. Rs. 25.98 Cr. Dt: 15-07-2004 18 months M/s NCC Ltd, Hyderabad 2 Formation of Right Earth bund and excavation of Left & Right main canals, CM&CD works and distributory system. Rs. 212.49 Cr Dt: 10-11-2004 30 months M/s Maytas – NCC (J.V), Hyderabad 3 Supply and fixing of spillway gates Rs. 7.30 Crs. M/s AARPI Engineering Co. Nagpur

GUNDLAKAMMA RESERVOIR PROJECT Pkg.No. 1 : Formation of left earth dam including Construction of Head Sluice and Spillway of Gundlakamma Reservoir Project. Name of the Contractor : M/s. Nagarjuna Constructions Agreement Amount : Rs. 25.977 Crs. Agreement Date : 15-07-2004 Period of completion : 18 Months (6 milestones) Target date of completion : 1/2006 Investigation : Completed Designs : Completed Execution : in progress Qty. of earth work done : 17,73,185 cum against 21,00,440 cum Qty. of concrete work done : 61,044 cum against 75,609 cum Machinery : 44 Nos. deployed (Excavators-4, Tippers-25, concrete mixers 10 etc.) Expenditure : 2004-2005 - Rs. 11.81 Crs. 2005-2006 - Rs. 11.81 Crs. Cum. Exp. Inc.Mob. Adv. only - Rs. 23.62 Crs. Land Acquisition : Required 126.8 Acres, Acquired 126.8 Acres

GUNDLAKAMMA RESERVOIR PROJECT Pkg.No. 2 : i)Formation of Right Earth Bund, ii) Closing of Gorge Portion by Earth Bund, iii) Excavation of Left and Right Canals, iv) Construction of Right Head Sluice, v) CM&CD works and vi) distributary system for an ayacut of 80,000 Acres. Name of the Contractor : M/s. Maytas-NCC Ltd (JV) Agreement Amount : Rs. 212.49 Crs. Agreement Date : 10-11-2004 Period of completion : 30 Months (10 milestones) Target date of completion : 8/2007 Investigation : 28.135 Km length against 51.735 Km. Designs approved : 14 Km length against 51.735 Km. Execution : 9 Km length against 51.735 Km Qty. of earth work done : 4,07,000 cum against 63.304 Lakh cum Qty. of concrete done : 1060 cum against 40,825 cum Machinery : Deployed 39 Nos. (Excavators-6, Tippers-25, Rollers-3 etc.) Expenditure : 2004-2005 - Rs. 10.63 Crs. 2005-2006 - Rs. 23.40 Crs. Cum. Exp. Inc. Mob. Adv. only - Rs. 34.03 Crs. Land Acquisition : Required 7857.87 Acres, Acquired 2475.26 Acres