Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May.

Slides:



Advertisements
Similar presentations
Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL May 17, 2010.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
MICE Spectrometer Solenoid Design and Fabrication Update Mike Green and Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference December.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL June 7, 2010.
Spectrometer Solenoid Tech Board Schedule Discussion
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Spectrometer Solenoid – Quench Analysis The LBNL version of the quench model has been further refined - Heng Pan is finishing various quench scenarios.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
Spectrometer Solenoid Test Plan Workshop: Safety Considerations Steve Virostek - LBNL February 17, 2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
TE-CRG Activities D. Delikaris, TE-CRG.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Integration of the Spectrometer Solenoid Magnets
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
Presentation transcript:

Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May 7, 2015 MICE VC May 7, 2015

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL TopicsTopics Background Info Background Info Insulating vacuum Insulating vacuum Helium circuit Helium circuit Cryocooler compressors Cryocooler compressors Cryocooler Update Cryocooler Update Background Info Background Info Insulating vacuum Insulating vacuum Helium circuit Helium circuit Cryocooler compressors Cryocooler compressors Cryocooler Update Cryocooler Update

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL Background Info Some tasks remained after 10/14 trip to RAL by LBNL techs (K. McCombs, A. Williams) Some tasks remained after 10/14 trip to RAL by LBNL techs (K. McCombs, A. Williams) Techs are currently at RAL from April 27 th through May 8 th (2 weeks) Techs are currently at RAL from April 27 th through May 8 th (2 weeks) Goal is to get magnets fully operational and ready for cooldown Goal is to get magnets fully operational and ready for cooldown Some work still to be completed at LBNL related to the cryocoolers Some work still to be completed at LBNL related to the cryocoolers Some tasks remained after 10/14 trip to RAL by LBNL techs (K. McCombs, A. Williams) Some tasks remained after 10/14 trip to RAL by LBNL techs (K. McCombs, A. Williams) Techs are currently at RAL from April 27 th through May 8 th (2 weeks) Techs are currently at RAL from April 27 th through May 8 th (2 weeks) Goal is to get magnets fully operational and ready for cooldown Goal is to get magnets fully operational and ready for cooldown Some work still to be completed at LBNL related to the cryocoolers Some work still to be completed at LBNL related to the cryocoolers

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL VacuumVacuum Replace all four power feedthroughs on SS2 Replace all four power feedthroughs on SS2 Install manual 6” gate valves on each vacuum gauge tree Install manual 6” gate valves on each vacuum gauge tree Install vacuum burst disks on each magnet Install vacuum burst disks on each magnet Install G-10 strain reliefs on vacuum side of power leads - both magnets Install G-10 strain reliefs on vacuum side of power leads - both magnets Leak check after all vacuum work is completed Leak check after all vacuum work is completed Replace all four power feedthroughs on SS2 Replace all four power feedthroughs on SS2 Install manual 6” gate valves on each vacuum gauge tree Install manual 6” gate valves on each vacuum gauge tree Install vacuum burst disks on each magnet Install vacuum burst disks on each magnet Install G-10 strain reliefs on vacuum side of power leads - both magnets Install G-10 strain reliefs on vacuum side of power leads - both magnets Leak check after all vacuum work is completed Leak check after all vacuum work is completed

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL Ceramic Power Feedthrus

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL Feedthru Strain Relief Recurring damage to feedthrus likely due to forces from warm leads inside vacuum Recurring damage to feedthrus likely due to forces from warm leads inside vacuum Custom made G-10 strain reliefs will prevent large moments from being transmitted to fragile ceramic insulation Custom made G-10 strain reliefs will prevent large moments from being transmitted to fragile ceramic insulation Recurring damage to feedthrus likely due to forces from warm leads inside vacuum Recurring damage to feedthrus likely due to forces from warm leads inside vacuum Custom made G-10 strain reliefs will prevent large moments from being transmitted to fragile ceramic insulation Custom made G-10 strain reliefs will prevent large moments from being transmitted to fragile ceramic insulation

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL Vacuum Gauge Tree

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL Helium Circuit Change cold head O-rings and clean cold head surfaces Change cold head O-rings and clean cold head surfaces Install foam insulators on all cold heads Install foam insulators on all cold heads Install all cold heads Install all cold heads Extend SS2 Exhaust Line Extend SS2 Exhaust Line Install SS2 pressure transducers Install SS2 pressure transducers Leak check helium circuit after all helium circuit work is done Leak check helium circuit after all helium circuit work is done Change cold head O-rings and clean cold head surfaces Change cold head O-rings and clean cold head surfaces Install foam insulators on all cold heads Install foam insulators on all cold heads Install all cold heads Install all cold heads Extend SS2 Exhaust Line Extend SS2 Exhaust Line Install SS2 pressure transducers Install SS2 pressure transducers Leak check helium circuit after all helium circuit work is done Leak check helium circuit after all helium circuit work is done

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL Cryocooler Insulation

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL CompressorsCompressors Establish power to compressors Establish power to compressors Set up compressor water cooling Set up compressor water cooling Lay out compressor hoses Lay out compressor hoses Route compressor motor cables Route compressor motor cables Establish power to compressors Establish power to compressors Set up compressor water cooling Set up compressor water cooling Lay out compressor hoses Lay out compressor hoses Route compressor motor cables Route compressor motor cables

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL Bellows Leak A small leak was found on the SS1 single stage cooler bellows A small leak was found on the SS1 single stage cooler bellows Replacement is very difficult, and part is not readily available Replacement is very difficult, and part is not readily available LBNL techs carried out a repair in place using vacuum epoxy LBNL techs carried out a repair in place using vacuum epoxy A small leak was found on the SS1 single stage cooler bellows A small leak was found on the SS1 single stage cooler bellows Replacement is very difficult, and part is not readily available Replacement is very difficult, and part is not readily available LBNL techs carried out a repair in place using vacuum epoxy LBNL techs carried out a repair in place using vacuum epoxy

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL Cryocooler Update Recent cooler tests completed at LBNL Recent cooler tests completed at LBNL 2 of 3 heads were underperforming 2 of 3 heads were underperforming Poorly performing heads are on the way to Cryomech for refurb Poorly performing heads are on the way to Cryomech for refurb 3 rd head found to provide 70 mW additional cooling at 4K w/insulation 3 rd head found to provide 70 mW additional cooling at 4K w/insulation Insulation added to all heads at RAL Insulation added to all heads at RAL Recent cooler tests completed at LBNL Recent cooler tests completed at LBNL 2 of 3 heads were underperforming 2 of 3 heads were underperforming Poorly performing heads are on the way to Cryomech for refurb Poorly performing heads are on the way to Cryomech for refurb 3 rd head found to provide 70 mW additional cooling at 4K w/insulation 3 rd head found to provide 70 mW additional cooling at 4K w/insulation Insulation added to all heads at RAL Insulation added to all heads at RAL

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL Cryocooler Update To date, LBNL has sent the following to RAL: To date, LBNL has sent the following to RAL: 10 ea PT-415 compressors 10 ea PT-415 compressors 9 ea PT-415 cooler heads 9 ea PT-415 cooler heads 2 ea AL-330 single stage heads 2 ea AL-330 single stage heads 1 ea AL-330 compressor 1 ea AL-330 compressor Associated hoses Associated hoses FNAL purchased & sent a spare PT-415 head FNAL purchased & sent a spare PT-415 head To date, LBNL has sent the following to RAL: To date, LBNL has sent the following to RAL: 10 ea PT-415 compressors 10 ea PT-415 compressors 9 ea PT-415 cooler heads 9 ea PT-415 cooler heads 2 ea AL-330 single stage heads 2 ea AL-330 single stage heads 1 ea AL-330 compressor 1 ea AL-330 compressor Associated hoses Associated hoses FNAL purchased & sent a spare PT-415 head FNAL purchased & sent a spare PT-415 head

LBNL MICE VC 7 May ‘ Spectrometer Solenoid Update  Steve Virostek  LBNL Cryocooler Update LBNL will be sending the following to RAL in the coming months: LBNL will be sending the following to RAL in the coming months: 2 ea PT-415 cooler heads (after refurb & test) 2 ea PT-415 cooler heads (after refurb & test) 1 ea PT-415 compressor (after head testing) 1 ea PT-415 compressor (after head testing) 1 ea AL-330 compressor (DOE property issue) 1 ea AL-330 compressor (DOE property issue) One pair of PT-415 hoses One pair of PT-415 hoses LBNL will be sending the following to RAL in the coming months: LBNL will be sending the following to RAL in the coming months: 2 ea PT-415 cooler heads (after refurb & test) 2 ea PT-415 cooler heads (after refurb & test) 1 ea PT-415 compressor (after head testing) 1 ea PT-415 compressor (after head testing) 1 ea AL-330 compressor (DOE property issue) 1 ea AL-330 compressor (DOE property issue) One pair of PT-415 hoses One pair of PT-415 hoses