Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Offtake Metering Errors Stephen Skipp Asset Manager (Transmission and Storage)
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification 0213 – User Pays Governance Arrangements Simon Trivella – 19 th June 2008 Governance Workstream.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
Offtake Arrangements Document – An Overview Paul Roberts 12 th May 2005.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Metering Standards and Impact on Shrinkage Issue for Consideration 1 October 2009 for Gas Transmission Workstream.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Distribution workstream 29th January 2009
Transmission Workstream February 2009
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
RBD NOTIFICATION PROCESS
Offtake Workstream : 8th September 2010
Mod 186 Report Assumptions for 2013 DCMF 26 January 2009
Introduction of Code Contingency Guidelines Document
Transmission Workstream 4th July 2007
Action 0002: Meter Error Notifications
UNC 0407 Analysis Scope - Update
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Amendment to NEA & NExA Measurement Provisions Change Process
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
2 hour / 5% Rule Bethan Winter.
Simon Trivella – 22nd May 2008 Distribution Workstream
0433: Inclusion of the Transmission to Distribution “System Operator Agreement Guidelines” within the Offtake Arrangements Document.
MOD Flow Swap Scenario’s – Initial Thoughts
Review of Physical Regime Times for Modification Proposal 461
MOD National Grid NTS Initiated Flow Swaps
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Flow Swaps at NTS / LDZ offtakes
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Introduction of Code Contingency Guidelines Document
Proposed Transitional Gas Exit Arrangements
CDSP Service Document amendment - high-level activity description*
Assured Pressures Proposal
MP0131: Meter Error Notifications
Offtake Workstream : 19 March 2012
Proposed Changes to UNC Section Q Emergencies - Mod 035
MOD Flow Swap Scenario’s – Initial Thoughts
Presentation transcript:

Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream

What are NTS Operational Flows? NTS/LDZ and LDZ/LDZ Offtakes only Requirements as to the submission of Offtake Profile Notifications in relation to NTS/LDZ Offtakes Pressure provisions at NTS/LDZ Offtakes Other operational provisions relation to LDZs and NTS/LDZ Offtakes

Why are we here? Internal review of business processes vs OAD requirements identified inconsistencies Pre network sales ‘Operating Agreement between the National and Area Control Centres’ Offtake Arrangements Document implemented in 2005 Amended via Mod 195AV in April 2009 Some issues remain UNC review proposal required

Examples of current issues Offtake Profile Notice submissions –OAD I (b) vs (b) vs (a) –3 variants potentially at odds with each other…none entirely fit for purpose? –Similarly OAD I2.3.5 vs –Potentially conflicting timeframes re OPN submissions

Things to consider Should any conditions in OAD be amended to reflect a more relevant condition? Are there any absent conditions which should be included? What are the benefits for both parties (NTS and DNO) by adhering to existing OAD clauses (which may create additional workloads) to warrant full compliance?

Proposed Terms of Reference General review of areas covered in Section I Comparison of working practices versus OAD requirements Availability and understanding of OPN submissions/usage Availability and understanding of pressure submissions/usage Measurement of flat overruns

Going forward WWU raise UNC Review Proposal (June 2010) 3-5 meetings 1-2 topics per session Key personnel required for specific topics First meeting July 2010, monthly thereafter

Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream