Generation Adequacy Task Force Meeting April 10, 2014.

Slides:



Advertisements
Similar presentations
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
Advertisements

AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
California Energy Action Plan Joint Public Meeting Electricity System Reliability Activities California Energy Commission July 17, 2003.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
NERC LTRA Update / CDR Capacity Counting Issues
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
1 ERCOT 2007 Strategic Financial Plan & Budget Proposal _____________________ Board of Directors November 14, 2006.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
1 Open University Integrating Renewables Conference 24 January 2006 Wind power on the grid… What happens when the wind stops blowing? David Milborrow
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
Review of Integration of the Requirements of MOD Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
1 WMS Report TO TAC April 2007 (which is in March)
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
PLWG Report to ROS September 4, PGRR039 PGRR requires Interconnecting Entities (IEs) to provide information for ERCOT’s resource adequacy reports,
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
2006 CDR Status Report Technical Advisory Committee May 4, 2006 Bill Bojorquez.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
LOLEv Methodology Details GATF April 5, Calculation of the Target Reserve Margin in the LOLEv study The reserve margin is calculated by the following.
REVISION TO DEFINITION OF TRANSMISSION OPERATOR NOGRR 149 ( APPEAL ) Small Public Power Group of Texas (SPPG) Presentation to ERCOT Reliability and Operations.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Status Report on 2007–2016 Long-Term Reliability Assessment Mark Lauby August 16, 2007.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Modeled Load Levels in the Valley
PLWG Review 6.9 and the Interconnection process
Generation Adequacy Task Force Update to WMS
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Cold Snap Task Force Update
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
2018 RTEP Report Key Maps, Tables & Figures
Presentation transcript:

Generation Adequacy Task Force Meeting April 10, 2014

2 Wind Capacity Value All generators in service as of Jan 1, 2011 ∑ HSL capacity for 20 peak load hours All generators in service as of Jan 1, 2012 ∑ HSL capacity for 20 peak load hours All generators in service as of Jan 1, 2013 ∑ HSL capacity for 20 peak load hours Three-year average HSL capacity All generators in service as of Jan 1, 2011 ∑ Year-end nameplate capacity All generators in service as of Jan 1, 2012 ∑ Year-end nameplate capacity All generators in service as of Jan 1, 2013 ∑ Year-end nameplate capacity Three-year average nameplate capacity Three-yr. Average Summer Peak Capacity Factor Calculations for 2015 CDRs would use four years of data for averaging, Calculations for 2016 CDRs would use five years of data for averaging,

3 CDR Resources without a Full Interconnection Study Planning Guide, Section (2): Before an SGIA is signed, all studies included in the FIS scope must be completed, unless mutually agreed by the IE and the TSP. The IE and TSP must meet and maintain compliance with all North American Electric Reliability Corporation (NERC) Reliability Standards, Protocols, and the requirements of this Planning Guide and the Operating Guides concerning interconnection. There are 20 projects with a signed SGIA but don’t have a FIS completed and approved (15 wind, four gas, one coal) Proposed language change to section :

4 Emergency Response Service Capacity Estimates ERCOT would like to add the following wording to the existing ERS capacity estimation methodology in Section : The estimate may be adjusted to account for program modifications, procurement methodology changes, changes in the seasonal risk assessment, and ERS time period expenditure limits.

5 NERC 2014 LTRA Planning Reserve Margins NERC 2014 Long Term Reliability Assessment will report four types of Planning Reserve Margin based on the likelihood of capacity to be available for the summer/winter seasons –Existing-Certain & Net Firm Transfers Margin –Anticipated Margin –Prospective Margin –Adjusted-Potential Margin

6 NERC 2014 LTRA Planning Reserve Margins, Cont. Existing-Certain: Includes existing generator units (expressed in MW), or portions of existing generator units, that are physically located within the assessment area that meet at least one of the following requirements when examining the projected peak for the summer and winter of each year: –Where energy-only markets exist, unit must be a designated market resource eligible to bid into the market “Existing-Certain & Net Firm Transfers Margin” only includes Existing-Certain capacity Planned, Tier 1: Planned units in Tier 1 must meet at least one of the following requirements when examining the period of peak demand for each season/year: –Resource construction is underway or complete (not in commercial operation) –Resource has been designated or approved by a market operator and an Interconnection Service Agreement has been signed “Anticipated Margin” includes Existing-Certain and 100% of Planned Tier 1 capacity

7 NERC 2014 LTRA Planning Reserve Margins, Cont. Planned, Tier 2: Planned units in Tier 2 (that do not meet the requirements of Tier 1), must meet at least one of the following requirements when examining the period of peak demand for each season/year: –A power purchase agreement (PPA) or Generation Interconnection has been requested “Prospective Margin” includes Existing-Certain, Planned Tier 1 capacity, and up to 50% of Tier 2 capacity Planned Tier 3: Includes all capacity that does not meet the requirements of Tier 2 when examining the period of peak demand for each season/year. “Adjusted-Potential Margin” includes Existing-Certain, Planned Tier 1 capacity, up to 50% of Tier 2 capacity, and up to 10% of Tier 3 capacity