Charlie Martin AVAPS Users Meeting April 28-29 2009 Boulder, Colorado AVAPS I: GPS.

Slides:



Advertisements
Similar presentations
Months of the year December January November October February
Advertisements

DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.

WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Section Events IES Annual Planning/Reporting District Events July New Officers and Board of Managers Aug President to Schedule Section BOM Yearly Meeting.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Calendar for 2011 Months of the Year with Holidays.
AVAPS II DROPSONDE Overview
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
“Falcone - Borsellino Airport”
Baltimore.
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Year 2 Autumn Term Week 12 Lesson 1
Centralized Classroom and Event Scheduling: Fall 2018
13-block rotation schedule
NATA Foundation Building Blocks Process
2018/2019 School Calendar July August September October November
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Due Dates subject to change. Watch for dashboard updates.
McDonald’s Kalender 2009.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
January MON TUE WED THU FRI SAT SUN
McDonald’s calendar 2007.
Year 2 Autumn Term Week 12 Lesson 1
1 - January - Sun Mon The Wed Thu Fri Sat
Teacher name August phone: Enter text here.
A Climate Study of Daily Temperature Change From the Previous Day
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Circle Chart Template Process Name.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Tropical cyclones movement
February 2007 Note: Source:.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
January MON TUE WED THU FRI SAT SUN
S M T W F S M T W F
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
McDonald’s calendar 2007.
PLAYMATES LEARNING CENTER CALENDAR
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Habitat Changes and Fish Migration
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Charlie Martin AVAPS Users Meeting April Boulder, Colorado AVAPS I: GPS

Timeline Early 2007 Early 2007: July 2007: January 2008: April 2008: Aug – Sept 2008: December 2008: February 2009: April 2009: July 2007 April 2008 April 2009 Aug 2008 Sept 2008 Feb 2009 Dec 2008 Vaisala informs NCAR GPS module (TIM-LF) will be discontinued in July NCAR test drops 4 AVAPS I sondes with the new TIM-4P. No major problems found. TIM-LF module discontinued Vaisala Starts production of sondes with TIM-4P module AVAPS User Conference T-PARC field project begins to use new sondes with the new TIM-4P module. Could not get good wind data on the newer TIM-4P sondes. A possible fix is found. Vaisala is instructed to modify 50 AVAPS I rev F sondes and send to NCAR for tests. Once tested, sondes were given to the 53 rd to flight test. Altered TIM-4P based sondes are flown with a very high success rate. AVAPS User Conference Jan 2008

AVAPS I / uBlox Physical Configs Sonde TypeuBlox ModuleGPS AntennaDates Produced AVAPS I, rev FTIM-LFWI-SYSUp to Jan 2008 AVAPS I, rev FTIM-4PWI-SYSJan - Oct 2008 AVAPS I, rev FTIM-4PTrimble, P/N 57589Dec 2008 and on AVAPS II, rev -TIM-5HTrimble, P/N Trimble, P/N Trimble, P/N Wi-Sys

AVAPS I GPS Upgrade Steps Sondes AffecteduBlox ModuleGPS AntennaDates Produced AVAPS I, rev FTIM-LFWI-SYSUp to Jan 2008 NCAR, Vaisala, and NOAA work towards are replacement for the TIM-LF: December 15 th, 2006: uBlox sends out a letter giving a timeline for obsoletion of several production modules. The TIM-LF GPS modules used in AVAPS is affected. July 12 th, 2007: NCAR flight tests four TIM-4P and four TIM-LF based sondes for comparison. The test results are very positive. July 30 th, 2007: The uBlox TIM-LF goes obsolete. January. 2008: Vaisala begins production of the TIM-4P based sondes. NCAR, Vaisala, and NOAA work towards are replacement for the TIM-LF: December 15 th, 2006: uBlox sends out a letter giving a timeline for obsoletion of several production modules. The TIM-LF GPS modules used in AVAPS is affected. July 12 th, 2007: NCAR flight tests four TIM-4P and four TIM-LF based sondes for comparison. The test results are very positive. July 30 th, 2007: The uBlox TIM-LF goes obsolete. January. 2008: Vaisala begins production of the TIM-4P based sondes.

AVAPS I GPS Upgrade Steps Sondes AffecteduBlox ModuleGPS AntennaDates Produced AVAPS I, rev FTIM-4PWI-SYSJan - Oct 2008 Data Courtesy of June Wang

AVAPS I GPS Upgrade Steps Sondes AffecteduBlox ModuleGPS AntennaDates Produced AVAPS I, rev FTIM-4PWI-SYSJan - Oct 2008 August to September 2008: NCAR deployed to Guam for T-PARC Errol finds there are multiple problems with the TIM-4P based sondes: Winds data is erroneous on many “Good” drops Extremely long lock up times in the air. Errol and Laura spent many hours in Guam looking for a fix. Ultimately for a lack of working sondes, they started using TIM-LF based sondes borrowed from the AF 53 rd. After some analysis in Boulder, it was found the GPS configuration was not properly applied. Effectively the TIM-4P’s navigation mode was left as “Auto” instead of “Airborne <2g”. A fix was applied, but did not solved all problems. August to September 2008: NCAR deployed to Guam for T-PARC Errol finds there are multiple problems with the TIM-4P based sondes: Winds data is erroneous on many “Good” drops Extremely long lock up times in the air. Errol and Laura spent many hours in Guam looking for a fix. Ultimately for a lack of working sondes, they started using TIM-LF based sondes borrowed from the AF 53 rd. After some analysis in Boulder, it was found the GPS configuration was not properly applied. Effectively the TIM-4P’s navigation mode was left as “Auto” instead of “Airborne <2g”. A fix was applied, but did not solved all problems.

AVAPS I GPS Upgrade Steps Sondes AffecteduBlox ModuleGPS AntennaDates Produced AVAPS I, rev FTIM-4PWI-SYSDec 2008 and on October 2008: NOAA and the AF 53 rd contact NCAR with problems about very long acquire times. NOAA found sondes in the hanger cannot acquire lock AF 53 rd was having nearly identical problems on the C130’s November 2008:NCAR traveled to Keesler AFB in Biloxi to further troubleshoot. NCAR modified and tested a variety of sonde and sonde components in an attempt to isolate the failure point during testing at Keesler. NCAR replicated the failures the AF 53 rd and NOAA experienced, and were able to duplicate them in Boulder. October 2008: NOAA and the AF 53 rd contact NCAR with problems about very long acquire times. NOAA found sondes in the hanger cannot acquire lock AF 53 rd was having nearly identical problems on the C130’s November 2008:NCAR traveled to Keesler AFB in Biloxi to further troubleshoot. NCAR modified and tested a variety of sonde and sonde components in an attempt to isolate the failure point during testing at Keesler. NCAR replicated the failures the AF 53 rd and NOAA experienced, and were able to duplicate them in Boulder.

AVAPS I GPS Upgrade Steps Sondes AffecteduBlox ModuleGPS AntennaDates Produced AVAPS I, rev FTIM-4PWI-SYSDec 2008 and on December 2008: NCAR discovered reradiated GPS signals are deceiving Proven problematic sondes work well in reradiated areas, but fail when exposes to a true constellation (outside). Once a systematic roof-top test was constructed, the problem was isolated to RF interference at the GPS antenna. Once the GPS antenna was exchanged from a Wi-Sys to a Trimble, P/N 57589, nearly all GPS lockup problems evaporated. January 2009: 50 Sondes were retrofitted by Vaisala with the new GPS antenna Sondes were then fully tested with the new methods at NCAR February 2009: 50 Sondes were flight tested by the 53 rd with a very high success rate December 2008: NCAR discovered reradiated GPS signals are deceiving Proven problematic sondes work well in reradiated areas, but fail when exposes to a true constellation (outside). Once a systematic roof-top test was constructed, the problem was isolated to RF interference at the GPS antenna. Once the GPS antenna was exchanged from a Wi-Sys to a Trimble, P/N 57589, nearly all GPS lockup problems evaporated. January 2009: 50 Sondes were retrofitted by Vaisala with the new GPS antenna Sondes were then fully tested with the new methods at NCAR February 2009: 50 Sondes were flight tested by the 53 rd with a very high success rate

Final Results: Sondes AffecteduBlox ModuleGPS AntennaDates Produced AVAPS I, rev FTIM-4PTrimble, P/N 57589Dec 2008 and on Configuration AVAPS I, rev F TIM-4P Trimble P/N AVAPS I, rev F TIM-4P Wi-SYS Data Source50 drops by 53 rd T-PARC Number Dropped4512 Good Drops436 % Good95.56%50.00% Drop Problems 1 Fast Fall 1 No GPS lock 1 Erroneous GPS (very odd) 1 No GPS lock 3 Only Tracked 6 SVs and never changed Data Courtesy of June Wang

Lessons Learned Re-radiated GPS signals can mask RF interference problems. Make sure to fully field test all changes to qualify Make sure all involved parties are fully aware and on board with changes

Questions or Thoughts?