To Create a Better Life through Green Network ERTMS Application in Korean Railroad 2006.04.

Slides:



Advertisements
Similar presentations
Platform Screen Door SAI SYNERGY (India)
Advertisements

Positive Train Control Benefits
Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST.
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission WP 1: Specification and evaluation.
ERTMS deployment experience in Turkey: Mersin - Toprakkale and Gebze - Köseköy lines Leone Fenzi Istanbul, April 2nd 2014.
ERTMS deployment in Europe and beyond: the global perspective
Thales Axle Counter The Challenges for a modern Train Detection System
Meeting AECOM, AM SOP-T, CFR, JASPERS
Metro Today, Main Line Tomorrow Malcolm Dobell, Head of Train Systems Kate Whelan, Lead Systems Performance Engineer SUP ATC.
© Invensys 00/00/00Invensys proprietary & confidentialSlide 1.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity.
Calibration of an Infrared-based Automatic Counting System for Pedestrian Traffic Flow Data Collection Step 3: Calibration Models Calibration models were.
The City of Gdynia City rights in 1926 With Sopot and Gdańsk forms the Tri-City agglomeration It has inhabitants Port city, employment structure:
©David F. Thurston, 2012, All rights reserved Capacity Implications of PTC now and in the Future David Thurston, Ph.D., P.E., FIRSE Vice President – Rail.
INDUSTRIAL & SYSTEMS ENGINEERING
Railway Safety Plan and Its Status in Korea
SATLOC – state of the art George Barbu – Union Internationale des Chemins de Fer Satellite based operation and management of local low traffic lines.
Transport presentation October An integrated railway solutions provider Sales 4.9 B Euros Orders received 4.7 B Euros Employees Market Share.
CE 515 Railroad Engineering
New Satellite-based Solutions for Train Control Systems
Title: Railway Safety Plan in Korea Name: Sanglog Kwak, Sungbae Yoon, Kwanghag Choi Organisation: MLTM, KRRI Economy: Republic of Korea Thirty Fourth APEC.
Overview System modelling and holistic simulation :
Development of a Technique for HFCV Safey Assessment
ERTMS state of the art and evolution of the applications considering customer’s orientations.
Lead the Way APTA Transit Standards Development “BUS RAPID TRANSIT”
Introduction Communication Based Train Control is an automated control system that ensures safe operation of rail vehicles using data communication between.
ETCS Level 2 Operational Concept in Austria
11 Satellite-based solutions for Train Control Systems European Parliament, Brussels Tuesday, 11 February 2014 Francesco Rispoli, Manager Satellite Technology.
Future Road Map – Modern Control, Command Signalling Systems BY Anshul Gupta DRM, Adra, South Eastern Railway Secretary, Institution of Railway Signal.
INTRODUCTION OF KOREAN HIGH SPEED TRAIN ROTEM Company High Speed Trains October 2010 Hyundai Rotem Company.
Peter Gurník, Oldřich Trégl Satellite based train location.
마스터 부제목 스타일 편집 마스터 제목 스타일 편집 page_0 - Outcome of operation for one year and its vision after Outcome of operation for one year and its vision after.
Korea Rail Network Authority, Republic of Korea. Contents Introduction Organizations - KRNA Overview of KOREA’s High Speed Rail development Background.
1 A study of the Korean Maglev development program speaker Chung, Young – Chul, KRRI 1. Introduction 2. Maglev program in Korea 2.1 Background of the Program.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
Features of Tokaido Shinkansen Tokyo Shin-Osaka Distance: km Stations: 17 Max speed: 270 km/h Nagoya TOKAIDO Shinkansen Line Safety : No deaths due.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
Ministry of Industry and Trade of Russian Federation June 2013 Deputy director of the Department of transport and special engineering industry V. Kaganov.
Signalling: Convergence of needs
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
ROLE OF SIGNALLING IN RAILWAYS
DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES
Railway Demonstration. 2 Low-Density Traffic Lines * n Single track, few trains/day –High safety requirements –High installation and maintenance costs.
1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.
Summary and Wrap-up Discussion 8 July 2015
The KTX operation and RS Maintenance Experience KOREA RAILROAD Ph. D. Gil-Hyun, Kang.
INTERFACING ETCS WITH LEGACY CC-SYSTEMS TRACK - SIDE.
UIC ERTMS Conference - Budapest 4 th -6 th April 2006 STRATEGY AND EXPERIENCES OF THE ERTMS DEPLOYMENT IN SPAIN Antonio Domínguez Chala ADIF.
Positive Train Control The impact of legislative changes SCORT Chris Heald September 22, 2009.
1 ERTMS Applications in India UIC ERTMS Conference 2006 Towards a Masterplan for Deployment Budapest 4 th to 6 th April 2006 Presenters: Howard Revell.
CERTIFER 1 J.P PRONOSTP.OZELLO UCI ERTMS CONFERENCE BUDAPEST.
ETCS Level 1 Deployment in Luxembourg UIC ERTMS CONFERENCE 2006 BUDAPEST François JAEGER Director CFL Member of the CFL board of.
배관의 내부검사용 이동로봇 및 조향장치 등록번호 : , 특허권자 : 최 혁 렬 외 2 명.
17 November 2003 This document is confidential and is intended solely for the use and information of the Australian Rail Track Corporation. PRESENTATION.
ERTMS/ETCS BENEFITS FOR RAILWAYS WORLD WIDE Norwin Vögeli
NETWORKING OF GPS., SENSORS AND SOFTWARE SYSTEMS WITH DBMS (APPLICATION TO INDIAN RAILWAYS)
Accelerating the Energy Transition through standardized open-source smart flexibility solutions Flexiblepower Alliance Network aims at a renewable energy.
Positive Train Control
Public Conference December
Telecommunications & Electronics
ANTI-COLLISON AND BRAKING SYSTEM
Chicago Transit Authority Energy Initiatives
Communications in Railway Centralized Traffic Control Systems
The Implementation Experience of CTCS-3 Train Control System and the Implication of “Go Global” of China High-speed Railway Good morning. October 2017.
University of Colorado A Line and B Line Grade Crossing Update
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Green ICT Actions in China
Towards Suistanable Development - TSD 2018
Presentation transcript:

To Create a Better Life through Green Network ERTMS Application in Korean Railroad

To Create a Better Life through Green Network Agenda I. Introduction II. CASE : ATP Project III. Conclusion

To Create a Better Life through Green Network I. Introduction

To Create a Better Life through Green Network 1. Current Signalling System I. Introduction EquipmentsInstalled Lines Length [Km] No. of Station Operating rate(%) CTC The Capital area, Kyong-bu line & others 19 line 1, FBS ATC Gwa-Cheon line, Bun-dang line, Il-San line ABSKyong-bu line & others 21 lines2, ATSKyong-bu line & others 52 lines3, Interlocking Electric, Mechanical & Electronic interlocking ATC : Automatic Train ControlABS : Automatic Block System ATS : Automatic Train Stop SystemFBS : Fixed Block System Review of Korail Main line status

To Create a Better Life through Green Network 1. Current Signaling System I. Introduction ProjectDescriptionContractorBudgetRemark Integrated CTC Center Unification and retrofit of all the existing CTC systems KBTech40M EUR- ATP Application of ERTMS/ETCS Class I for main line TaeJung/LG- CNS Consortium 120M EUR758.6km Bundang Line (Pilot) Pilot application of RF-CBTC for the commuter line between Seoul and satellite town Samsung SDS20M EUR22km Business status and Market drivers

To Create a Better Life through Green Network 1. Current Signaling System I. Introduction Limitation Of The Current System Limitation of Track Circuit based Fixed Block System Long Train Headway Low Train Operation Speed Low Line Capacity Low efficiency due to manual brake and traction control No intelligent control and reporting Increased maintenance due to many count of hardware Safety issue due to deterioration of devices Low Efficiency of Old Technology & Equipment

To Create a Better Life through Green Network I. Introduction 2. Why ERTMS (Background) ERTMS As the basis of world-wide Signalling Standard As the easy and effective way of interoperability As the solution to accommodate increasing transportation demand Various kinds of trains Different types of control systems Increased transportation demand High cost for maintenance

To Create a Better Life through Green Network II. CASE : ATP Project

To Create a Better Life through Green Network II. CASE : ATP Project 1. Project Introduction Items Gyeongbu (Seoul ~ Busan) Honam (Daejon ~ Mokpo) NationwideRemark LENGTH444 (km) 253 (km) 3,380 (km) ( ) Transportation Capacity Weekday 3,491,000 (man/year) 642,000 (man/year) - ( ) Weekend 1,867,000 (man/year) 402,000 (man/year) - ( ) Shared line with KTX 174.2km (incl. Dongdaegu ~ Busan : km) km (existing line) (km) ( ) Applied systems CTC, ATS, ABS, Optical cable network CTC, ATS, ABS- ( ) Site Information

To Create a Better Life through Green Network 1. Project Introduction Project summary Duration : - Dec ~ Dec Contractor : - TeaJung/LG CNS consortium Train Control System : - ERTMS/ETCS Class I (SRS Level 1) Current Stage : - Main Line Construction II. CASE : ATP Project

To Create a Better Life through Green Network 2. Project Target World-wide Standard Specification Increase of Capacity Improve Safety Support various service patterns Shorten the train headway Increase scheduled train speed Improve operation economy by increased passenger Internationally recognized safety level (CENELEC SIL4) Safety case already accepted by many certification authorities internationally recognized Can support driver’s Careless operation Can support automatic Train Protection on accident Can support various service patterns Efficiency for Maintenance Provide operation flexibility II. CASE : ATP Project

To Create a Better Life through Green Network 3. Current Progress Current Stage 4Q2Q1Q4Q3Q1Q4Q3Q2Q1Q4Q3Q2Q Test Manufacture & Assembling Basic Design Detail Design Manufacture & Assembling Test Pilot Line Main Line Design II. CASE : ATP Project

To Create a Better Life through Green Network 3. Current Progress Site Acceptance Test (Pilot Line) II. CASE : ATP Project

To Create a Better Life through Green Network 4. Expected System Performance Result of Evaluation  Train Speed  Stoppage Time  Acceleration and Deceleration  Balise Group with In-Fill In Case of Normal Station Stop Line Conventional Improve Headway for Operation KyungBu138Sec131Sec3Min(180Sec) HoNam181Sec160Sec4Min(240Sec) Seoul ~ Busan Down-Bound 131Sec HeadwayBuSan ~ Seoul Up-Bound 131Sec Headway II. CASE : ATP Project

To Create a Better Life through Green Network 5. Various Trains II. CASE : ATP Project

To Create a Better Life through Green Network 758.6km km Pilot Line Main Line 7 lines : incl. - Gyeongbu line - Honam line 6. Planned project 1401km 200 Duration : 2007 ~ 2010 Lines : 10 lines (incl. Chungbook line) Estimated Budget : 200 bil KWON Future Lines II. CASE : ATP Project

To Create a Better Life through Green Network III. Conclusion

To Create a Better Life through Green Network III. Conclusion Application of ERTMS/ETCS Standard World-wide global standard Interoperability Re-signaling projects planned (500 km in 5years) New Line planned (100 km in 5years) Easy way to join using Global Standard Vision in Korean Railroad Market

To Create a Better Life through Green Network THANK YOU !