PC Current Interlocking for the SPS Fast Extractions. 1 J. Wenninger July 2009.

Slides:



Advertisements
Similar presentations
Indistar® Leadership Team Meetings. Where can we plan a meeting? Choose ‘Plan Your Meeting’ from the main menu screen Click on Meeting Agenda Setup.
Advertisements

The following demo demonstrates features and benefits of the Fasfold CNC controller when retrofitted to a new or used Pressbrake. It can be retrofitted.
Slow Control LHCf Catania Meeting - July 04-06, 2009 Lorenzo Bonechi.
Advanced Audio Setup Troubleshooting your audio Users’ Reference.
New UI Changes for Endpoint Security in LDMS 9.6 SP2.
DB Audit Expert v1.1 for Oracle Copyright © SoftTree Technologies, Inc. This presentation is for DB Audit Expert for Oracle version 1.1 which.
The TIMING System … …as used in the PS accelerators.
Indistar® Leadership Team Meetings. Where can we plan a meeting? From the Navigation Toolbar, simply click on ‘Team Agendas & Meetings’
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
Recovery-Oriented Computing User Study Training Materials October 2003.
High Speed Data Converter University
4 May I/O Control. 4 May What is I/O Control? A Doors feature that allows you to program input events to drive output responses – for example:
1. Insert the Resource CD into your CD-ROM drive, click Start and choose Run. In the field that appears, enter F:\XXX\Setup.exe (if “F” is the letter of.
Feedback from MEF  Only possible, if COMMON COORDINATION MEETINGS  Main possible conflict: SAFETY –No “work permits” in the injectors. MEF working on.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
23/08/20081 RBI.816 Operation First aid on RBI.816 converter control J. Wenninger.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
OpenEMR: Basic Billing Based on OpenEMR 4.1 Laboratory Informatics Institute January 2014.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.
JDS5 Training Guide. On Start Up you will see this screen click the OK button Click OK.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
09/01/2016James Leaver SLINK Current Progress. 09/01/2016James Leaver Hardware Setup Slink Receiver Generic PCI Card Slink Transmitter Transition Card.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the CON-DVT-IOE. Intellect 1.5 is used for the software portion. NEXT.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the DVT CON-IOE. Intellect 1.0 is used for the software portion.
BT/BP AB/CO/MI 17 th September 2008 Safe Machine Parameters Status & Update.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
19/06/20081 CNGS Operation Part 1 : CNGS beam operation. Protons on their way to the target. CNGS specialties. Part 2 : Extraction Interlock System. Detailed.
Hands-On Microsoft Windows Server 2008 Chapter 5 Configuring Windows Server 2008 Printing.
V. Kain – eLTC – 7March08 1 V.Kain, S. Gysin, G. Kruk, M. Lamont, J. Netzel, A. Rey, W. Sliwinski, M. Sobczak, J. Wenninger LSA & Safety - RBAC, MCS Roled.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
June CNGS Operation Part 1 : CNGS beam operation. Protons on their way to the target. ‘Special’ CNGS issues. Part 2 : Extraction Interlock System.
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
Basic Navigation in Oracle R12 BY: Muhammad Irfan.
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
1 Philips EvoKit Lumen Selection App User Manual * Philips Lighting April 20, 2016 *Can be used for Philips EvoBase as well.
An Overview When Connecting to Yaskawa Drives Date: 8/14/06, Rev: PP.AFD.26.
Emergency dump update 2. M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam.
LSA Core overview 6 / 11 / 2007 Wojciech Śliwiński (AB-CO-AP) on behalf of LSA team.
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
3/10/20071 CNGS Operation Part 1 : CNGS beam operation. Protons on their way to the target. CNGS specialties. Part 2 : Extraction Interlock System. Detailed.
CERN Marc Magrans de Abril MPP – RBI DCCT Incident Beam Lost in TI2 Event Analysis and Proposed Mitigations SPS and LHC MPP
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
SPS Partial Economy 1 J. Wenninger BE-OP-SPS April 2009 The partial economy team: S. Page, M. Jonker, S. Cetour Cave, L. Pereira, J.C. Bau, I. Kozsar,
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
About Interlocks, Timing Systems and how to send SPS beams to the LHC
Injectors BLM system: PS Ring installation at EYETS
Setup Of 4050 EIP To Control LOGIX PLC
Setup Guide - DeviceNet Communication AC1314 with RSNetworx
BLM settings management in LSA
Interlocking of CNGS (and other high intensity beams) at the SPS
Web service.
Configuration of BLETC Module System Parameters Validation
Click “Execute” button.
LHC An LHC OP guide… under construction J. Wenninger
Presentation transcript:

PC Current Interlocking for the SPS Fast Extractions. 1 J. Wenninger July 2009

ROCS FEI System 2 The ROCS FEI (Fast Extraction Interlock) system is implemented as a task in the SPS ROCS PC front-end crates (FESA class). The task is triggered by a CTIM associated to the fast extraction. The FEI interlocks are organized in ‘work units’. Each unit is characterized by:  A group of PCs to survey (with interlock references and tolerances).  A user mask to decide on which cycle the FEI must be evaluated. For CNGS : all CNGS users. For LHC : all LHC, LHCFAST and LHCION users.  An output pulse length (currently 2 ms for CNGS, 3 ms for LHC).  A HW output signal that is input to one of the SPS extraction BICs. The interlock signals are connected to the SPS extraction interlock BICs.

FEI Timing 3 The evaluation of the FEI is triggered by the mugef.fei.wrn (legacy) event that is sent out twice for each fast extraction : - At -16 ms to perform a preliminary check of the currents  start MKE resonant charge. - At -4 ms to perform the final check of the currents. In both cases the ROCS system will produce a ms long OK signal to the extraction interlock system if all PCs of the FEI unit are in tolerance.

FEI BIS Diagnostics 4 4 BIC detail Time evolution of the signal When all currents are in tolerance, the PC FEI unit provides 2 short pulses (triggered by the timing events) where the BIS input switches to TRUE/OK. The green/shadowed regions indicate where the signal must be = 1 (TRUE) to be OK (and to give status = green !

Main UI 5 One tab per transfer One tab per FEI unit PC interlock settings in AMPERES. With the appropriate RBAC role, you may edit some parts of the table. Configuration – no edit PCs that belong to the FEI unit

Main UI 6 Interlock pulse width FEI device name: Rocs_FEI_ _ BIC crate/input User categoryROCS FEI output no. (0 to 3)

Main UI 7 Drive all settings (or all settings for a transfer) from LSA DB to ROCS crates. Drive selected FEI unit

Main UI – CNGS Tab 8 CNGS settings use Magenta as color. Involve 3 crates : m1sba4, m2sba4, m1sbb4.

Main UI – LHC Beam 1 Tab 9 LHC Beam 1 settings use BLUE as color. Involve 5 crates : m2sba6, m3sba6, m4sba6, m1sba7, m1ssr2.

Main UI – LHC Beam 2 Tab 10 LHC Beam 2 settings use RED as color. Involve 4 crates : m1sba4, m2sba4, m1sbb4, m1ssr8.

Settings issues 11 For the moment the settings in the FEC are NOT persistent, i.e. they are lost when the ROCS FEC are rebooted. This will automatically generate interlocks on all affected channels. >> Drive is required after reboot.

SIS 12 Since those interlocks are very critical, SIS will progressively incorporate more and more cross-interlocks to avoid any error on the most critical FEI settings. SIS checks: o The pulse width (xxx_PULSEWIDTH) tests. o The output (xxx_OUTPUT) tests. o The settings of the critical converters (level EXPERT or GURU (xxx_SETTINGS) tests.

Updating Settings 13 The ROCS FEI settings are stored as critical settings in the LSA DB (digitally signed). The settings can be driven to HW like any other LSA setting without special rights. The following RBAC roles are allowed to alter FEI settings:  MCS-SPSOP Can only change the corrector reference settings.  MCS-SPSOP-EXPERTCan change all settings and tolerances except some DCCT references for RBI.816.  MCS-SPSOP-GURUCall change all settings, including the pulse width. RolePeople MCS-SPSOPAll people on SPS shifts + Machine supervisors + GA + Edda MCS-SPSOP-EXPERTJorg, Verena, Karel, Elias, Django, Malika MCS-SPSOP-GURUJorg, Verena From the CNGS experience there is NO need to trim any setting except the corrector reference settings once the setup is finished.

Trims 14 The trim button changes depending on the user role (adapts to the different FESA properties): o For role MCS-SPSOP the trim button sends the Reference. o For role MCS-SPSOP-EXPERT the trim button sends the Tolerances and Enabled status. o For role MCS-SPSOP-GURU the trim button sends the Pulse width and Output number. The SIS reference settings can be updated with the MCS-SPSOP-EXPERT and MCS-SPSOP-GURU roles. Attention: When the reference or tolerance is updated for a PC associated to the EXPERT or GURU roles, it is necessary to update the SIS settings. Since SIS only retrieves its reference every 15 minutes from LSA, it may be required to restart the subscription in SIS >> see one of the following slides !

Trim Button / 1 15 No MCS role MCS-SPSOP

Trim Button / 2 16 MCS-SPSOP-GURU MCS-SPSOP-EXPERT Trim SIS settings

SIS Subscriptions to LSA FEI ref settings 17 When the reference or tolerance is updated for a PC associated to the EXPERT or GURU roles, it is necessary to update the SIS settings. Since SIS only retrieves its reference every 15 minutes from LSA, it may be required to restart the subscription in SIS that are shown below (rmi://lsa/SIS_FEI.xxxxx).

Cycle Selection 18 Open cycle selection from ‘File’ menu. Select appropriate CYCLE and TRANSFER. The settings can be edited directly at the level of the table, or imported from the DB !

Settings Comparison & Import 19 Click on ‘FEI<>FSA’ button to compare LSA PC settings and FEI settings : this opens a table with PC and FEI settings. If there are differences, you can import the PC settings to the FEI (if you have the rights). Do not forget to click on ‘Trim’ button at the end to apply the changes. Authorization: -SPSOP -SPSOP-EXPERT -SPSOP-GURU

20 Monitoring & diagnostics : ROCS FEC Click on ‘DB<>FEC’ button. Opens frame Active users For all parameters : HW and FEI (DB) value

21 Monitoring & diagnostics : SIS Click on ‘DB<>FEC’ button. Opens frame For all parameters : SIS and FEI (DB) value The FEI Ref must match the SIS Ref + SIS Tol.

Monitoring & diagnostics 22 Click on ‘Monitor FEI’ button. Opens frame You can see the currents (I), the differences wrt reference (dI) or the differences normalized to the tolerance in %.

Help 23 This presentation can be opened from the help menu.