SSC Preflight Status Tested during Sim #3: –Telemetry ingest –Beacon processing –Science planning –Archiving of MOC data products, including level-0 telemetry.

Slides:



Advertisements
Similar presentations
Year 10 ISA Controlled assessment Week starting March 4 th 2013.
Advertisements

STEREO SPICE Tutorial It’s been the intention of the STEREO Science Center to make the use of SPICE kernels by the instrument teams as simple as possible.
Problem of the Week! Max was in charge of getting the equipment for the 14 people on his baseball team. He made sure he had 8 bats and 38 baseballs. He.
Solar-B FPP 1 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations Ted Tarbell
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG #22 (via telecon)
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG # March 2010 Dublin, Ireland.
QUESTION 1 What day is it today? A) I’m Tuesday. B) I have Tuesday. C) Tuesday. D) It’s Tuesday.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
2012 CALENDAR. JANUARY 2012 Sunday 日 Monday 月 Tuesday 火 Wednesday 水 Thursday 木 Friday 金 Saturday 土
IMPACT Report SSMO Receiving Review– January 23, 2007.
SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation SECCHI Synoptic and Special Observing Programs Simon Plunkett SECCHI Operations Lead.
Online Analysis for STEREO's IMPACT Investigation: Lessons Learned P. Schroeder, J.G. Luhmann, W. Marchant and V. Toy (University of California – Berkeley),
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
MY fLIGHT pLAN By Josephine. DeStInAtIoNDuRaTiOnTiMe ZoNe Surabaya  Singapore2 hours 13 minutesSingapore is 1 hour ahead of Surabaya Singapore  Suva11.
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO Science Center SWG – May 2005 William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO Science Center William Thompson NASA Goddard SFC Code Greenbelt, MD
ARISE Summer Institute UC Davis June 17-June 22, 2011.
AERONET Web Data Access and Relational Database David Giles Science Systems and Applications, Inc. NASA Goddard Space Flight Center.
Bernhard Fleck SOHO Project Scientist SOHO Science Operations Now and Then.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG #23 29 March 2012 (via telecon)
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG 3-5 February 2009 Pasadena, California.
08__050610_SCIP/SEB_PSR_Delivery.1 SECCHI Data Processing, Analysis and Access Jeff Newmark Naval Research Laboratory
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
1 “STEREO PLASTIC STATUS REPORT” A.B. Galvin Lorna Ellis (Data) Mark Popecki (Operations) Team (Science) STEREO SWG Meredith NH October 27, 2009.
Heliospheric Imager – Scientific Operations  HI Operations Document – R. Harrison  HI Image Simulation – C. Davis & R. Harrison  HI Operations Scenarios.
SECCHI Status Russell A. Howard 27 MAR 2007 STEREO SWG.
Instrument Performance Spefication 13 July 2001 SECCHI Consortium Meeting Cosner’s House, Abington Dan Moses.
Spacecraft and Ground Segments Status March 21, 2014 Dan Ossing STEREO Mission Operations Manager (240)
Heliospheric Imager – Scientific Operations  HI Operations Document – R. Harrison (presented by Dave Neudegg – SciOps for Cluster, Mars Express, Double.
Plastic Software Status and Data Access March 27, 2007 Lynn Kistler & Lorna Ellis.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
2007 March 261 SECCHI-EUVI Status and First Observations Jean-Pierre Wuelser Lockheed Martin Solar and Astrophysics Lab And The SECCHI Team.
Click the button to begin. 12:25 What time does this clock show? 5:00 4:00.
Swift HUG April Swift data archive Lorella Angelini HEASARC.
Michael L. Kaiser STEREO Project Scientist NASA/Goddard Space Flight Center STEREO June 11, 2008 STEREO at 1.4 years.
1 GSFC (Jan 2000) 2 GSFC (May 2000) 3 UCB (Dec 2000) 4 UNH (Jun 2001) 5 Paris (March 2002) 6 Washington (May 2002) 7 NRL (March 2003) 8 UCB (Dec 2003)
IMPACT SWG Status Report – December 11, Early IMPACT Timeline Status Day 3,410-28, 10-29IDPU/MAG/SWEA and STE turned on Day 711-1Booms deployed.
IMPACT Data Plans May 2006 Peter Schroeder UC-Berkeley
William Thompson L-3 Communications NASA Goddard Space Flight Center STERE The STEREO Science Center.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
STEREO - Solar Terrestrial Relations Observatory Mission SECCHI Calibration Activities Simon Plunkett SECCHI Operations Scientist Naval Research Laboratory.
Telemetry Constraints during Early Operations The STEREO telemetry rate is restricted during the phasing orbits due to S/C RF interference with each other,
Michael L. Kaiser STEREO Project Scientist NASA/Goddard Space Flight Center STEREO May 2, 2008 STEREO at 1.25 years.
The Virtual Heliospheric Observatory and Distributed Data Processing T.W. Narock 1,2, A. Szabo 2, A. Davis 3 1. L3 Communications,
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG November 2007 Pasadena, California.
SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude.
SSC Data Access Plans All data will be available through web –Also setting up anonymous ftp site –SECCHI images will be password protected during embargo.
STEREO Science Working Group Fall AGU December 11, 2006 San Francisco Meeting #15 (I think) Agenda 19:00-19:30Project and SSC status 19:30-20:00SECCHI.
SWG040322SECCHI_STATUS.1 SECCHI Status R.A. Howard Presentation to STEREO SWG 22 March 2004 Boulder, Colorado.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG October 2009 Meredith, NH.
STEREO and the Virtual Heliospheric Observatory Tom Narock 1,2 Adam Szabo 1 Jan Merka 2 (1) NASA/Goddard Space Flight Center (2) L3 Communications, GSI.
The birthday calendar 2B : Unit 6 Days of the week Days of the week.
The Calendar.
Daily Math Review September 2-6, Monday Solve the following problems with strategies and/or algorithms 5, = 9, = 3, =
STEREO Science Center SWG – November 2005 William Thompson NASA Goddard SFC Code Greenbelt, MD
My Plan to Go to Around the world By: Benedict/5C.
Heliophysics MO&DA Program - November 13, Page 1 Notes from the Heliophysics MO&DA Program STEREO SWG Meeting Chuck Holmes “Director, Heliophysics.
PLASTIC Post Launch Data Flow Lynn Kistler & Lorna Ellis May 2006.
Working with MAVEN Data
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Solar Orbiter Instrument Testing by MOC-SOC
Launch and On-orbit Checkout
STEREO Michael L. Kaiser STEREO Project Scientist
The STEREO Space Weather Broadcast
Presentation transcript:

SSC Preflight Status Tested during Sim #3: –Telemetry ingest –Beacon processing –Science planning –Archiving of MOC data products, including level-0 telemetry –Archiving of instrument data Interfaced archive to Virtual Solar Observatory –Tested IDL interface –Event catalogs still under development Developed browse tools –Daily summary images and plots –SPICE orbit web browser –“Latest events” pages under development (Sam Freeland)

SSC Flight Status Currently working: –Telemetry ingest –Science planning web pages: Current plans DSN Schedule Summary Weekly meeting minutes Early Orbit Summary –Archiving of MOC data products, including level-0 telemetry –Archiving of instrument data (SECCHI, PLASTIC) –Organization of SPICE ephemerides within SolarSoft SPICE orbit web browser, “Where is STEREO?” page Virtual Solar Observatory –IDL interface working for PLASTIC data Waiting until embargo over for SECCHI Beacon interface with NOAA antenna partners imminent –Ephemerides and viewperiod files being generated for ground stations.

Science Planning Pages Planning Calendar & Meeting Minutes DSN Summary Early Orbit Summary

STEREO Orbit Tool New web-based tool for plotting STEREO’s position in the solar system. Can also plot Ulysses and Messenger positions, Parker spiral. Also prints out summary information. Uses IDL RPC server, with a PHP front-end.

Future Work Beacon processing: –Need new software from instrument teams –Instruments need to finish commissioning (high voltages, etc.) Daily summary plots: –Same comments as above –Need to incorporate non-STEREO data SolarSoft has software to retrieve WIND, ACE, SOHO data Image/plot search tool –Plan to build on SOHO tool

Beacon & Daily Summary Plots

Upcoming Operations – 1 Dec 11, Monday –Ahead: Power test, 45° off-point –Ahead: Open HI baffle cover Dec 12, Tuesday –P4 Perigee, IMPACT MAG roll Dec 13, Wednesday –Ahead: SECCHI GT calibration (small off-points) –Behind: Open SECCHI SCIP doors Dec 14, Thursday –Ahead: SECCHI GT calibration –Ahead: Open IMPACT SIT and SEPT doors Dec 15, Friday –S1 first lunar swingby Dec 16, Saturday –Behind: SECCHI GT calibration

Upcoming Operations – 2 Dec 18, Monday –Ahead: SWAVES calibration roll –Ahead: Open HI baffle cover Dec 19, Tuesday –Behind: SWAVES calibration roll Dec 20, Wednesday –Behind: SECCHI GT calibration Dec 21, Thursday –Behind: SECCHI GT calibration –Behind: S1+ Prime Delta-V Maneuver Dec 23, Saturday –Behind: S1+ Backup Delta-V Maneuver

Upcoming Science Events Dec 2006 – May 2007 –Ulysses quadrature Mar 13 – Apr 30 –SUMER/Hinode campaign May 1-15 –SECCHI campaign June 5 –Messenger – Venus fly-by August 19 –Ulysses ecliptic plane passage Don’t forget to get in your JOP write-ups!