Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.

Slides:



Advertisements
Similar presentations
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
Advertisements

June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
LAV firmware status Francesco Gonnella Mauro Raggi 23 rd May 2012 TDAQ Working Group Meeting.
LKr readout: present and future R. Fantechi 30/8/2012.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
Development of Readout ASIC for FPCCD Vertex Detector 01 October 2009 Kennosuke.Itagaki Tohoku University.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
Straw electronics Straw Readout Board (SRB). Full SRB - IO Handling 16 covers – Input 16*2 links 400(320eff) Mbits/s Control – TTC – LEMO – VME Output.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
The GANDALF Multi-Channel Time-to-Digital Converter (TDC)  GANDALF module  TDC concepts  TDC implementation in the FPGA  measurements.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Status of NA62 straw electronics Webs Covers Services Readout.
NA62 straw tracker readout status Georgios Konstantinou
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
Kraków4FutureDaQ Institute of Physics & Nowoczesna Elektronika P.Salabura,A.Misiak,S.Kistryn,R.Tębacz,K.Korcyl & M.Kajetanowicz Discrete event simulations.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
Clock and Trigger T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University Bratislava M. Krivda University of Birmingham.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Integration and commissioning of the Pile-Up VETO.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
SRB data transmission Vito Palladino CERN 2 June 2014.
LKr readout and trigger R. Fantechi 3/2/2010. The CARE structure.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
FW and HW Status TDAQ WG 10/6/2015. Hardware MPOD: ◦ HV was NOT floating   Sensibility of current limit to external devices  Particularly for chamber.
Straw VME Data Monitoring M. Koval Straw WG meeting
The NA62 Spectrometer Acquisition System TWEPP 2015, Lisbon Peter Lichard and Vito Palladino - CERN On Behalf of NA62 Straw Working Group.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Electronics and DAQ status Frontend - covers – Preparation of the final cover version and production Design finished Mounting of RJ45 verified using selective.
Straw readout status Run 2016 Cover FW SRB FW.
Status of NA62 straw electronics and services
Status of NA62 straw readout
LKr status R. Fantechi.
Michal Koval (CERN) Straw WG Meeting
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
* Initialization (power-up, run)
Vito Palladino Straw Working Group 23/3/2015
Iwaki System Readout Board User’s Guide
COVER Full production should arrive today
Run experience Cover FW SRB FW DAQ and monitoring
Presentation transcript:

Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015

Hardware Gas leak to repair in Station 4 HV discharge in Station 4 to be understood SBC ◦ Move to local accounts (AFS is not stable enough) COVER ◦ Make safer the masking of the channels ◦ Check the multi-hit and FIFO full flags SRB ◦ Boards removed from the experiment (March the 5 th ) ◦ Fix the NIM outputs:  Boards machinery (1 VIA removed/board)  Patch to be applied on all boards starting from 8 of April ◦ Heat sinks installation ◦ Trigger matching  Testing software  Test bench 2 Done In Progress NOT Started

Hardware II One DATA cable to be changed in Station 1 Installation of the shielding for the cable trays (Reminder: the data cables are RJ45 but the signals are LVDS) Gain monitor module Full development setup in 154 (16 covers,1 or 2 SRB(s) and a complete MPOD system) 16ch ISEG HV module repairing Temperature sensors to be installed on the manifolds 3 Done In Progress NOT Started

Run Control Init procedure: ◦ Recognize PLLs problems + automatic actions ( => restart ALL the PLLs ) ◦ Recognize links problems + automatic actions ◦ Add masking of not connected straws ◦ Add reset of internal links SOB/EOB ◦ Automatic checks + actions:  Masks  Connection to COVERs  Thresholds  PLLs  Noise spikes (induced) Automatic reload of COVER parameters in case of reset Readout of the HW configuration 4 Done In Progress NOT Started

VME Monitoring (0-bias Data Sample) Produce the FW to access the data via VME Use 2014 raw data to produce test samples Generate histograms and optimization of the histograms update 5 Done In Progress NOT Started

Raw Data Analysis Toy Montecarlo to estimate the data throughput in case of trigger matching, with various trigger rates. Exercise the trigger algorithm(s) Generate a root tree from the raw data (Straw only) Data merging Searching for problems in COVERs connectivity ◦ Multi-hit and FULL full flags ◦ Noise spikes 6 Done In Progress NOT Started

CIRCULAR BUFFER ~ 1 ms INPUT FIFO 25ns SLICE DEPTH MEMORY (# of hits per time slice) 8,16 or 32 hits 8bit straw addr 5b fine time 1b edge 2b monitoring 1-2b coarse time OUTPUT FIFO FROM FRONTEND TO ETHERNET COARSE TIME COUNTER TTC SOB TIME REORDER 10us TRIGGER QUEUE TTC L0 CLEARING

25ns Structure 8

9

10

Conclusions and Plans L0 HW trigger matching is ongoing FW structure has been defined, all the parameters chosen Test software is ready to be tested Test bench in 154 is almost ready Looking forward to be part of the general TDAQ (mid of April, first planned for the end of this month) 11