Core Drilling into an Energized 13.2 kv Manhole Near Miss Los Alamos National Laboratory, TA-55 Plutonium Facility Presented by Dan Carter, Facility Representative.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Lockout/Tagout Awareness Training
Site Safety Plans PFN ME 35B.
Cleveland Construction Safety Initiative Introductions Purpose of a 3SP Overview of Sections of a 3SP Pat McMillen – Gilbane Building Company Dave.
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
PROJECT RISK MANAGEMENT
OSHA’s Voluntary Protection Program (VPP) Job Hazard Analysis Mishap reporting 1 This class is only intended to familiarize you with the programs in place.
Job Loss Analysis Overview
“TIMEOUT” Human Performance Improvement Tool 5 November 2013.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
GCEAG Meeting January 12,  NPR Issued September 14, 2011  Comments were due November 14, 2011  Focuses on six new or expanded items  Stop work.
Systems Analysis and Design 9th Edition
ELECTRICAL SAFETY / E N V I R O N H & S T R A I N I N G P R O G R A M ELECTRICAL SAFETY OSHA requires that electrical equipment be approved for use and.
Contractor Safety Management
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Unit 8: Tests, Training, and Exercises Unit Introduction and Overview Unit objectives:  Define and explain the terms tests, training, and exercises. 
Electrical Safety Training
Utilizing Only Qualified Persons for Electrical Work can Reduce Risk Presented by: Dennis K. Neitzel, CPE Director Emeritus AVO Training Institute, Inc.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Proprietary & Confidential | For Internal Use Only Safety Orientation for New Employees ENGL-2100 Project 2, Option 3 To: Professor Laryssa Waldron and.
Control of Hazardous Energy – Lockout/Tagout 29 CFR
AUDITS AND INSPECTIONS
Safety and Health Programs
EMPLOY THE RISK MANAGEMENT PROCESS DURING JOB PLANNING and EXECUTION
Risk Assessment – An Essential Standard
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
Safety & Project Management by NABEEH JUM’AH. Eye on Safety  Proactive  Reactive.
Safety & Health Programs.
LOCKOUT/TAGOUT ENERGY CONTROL PROGRAM
Contact with a Stored Energy Source 1 Feb 2012 Summary of events Contributing factors Moving forward, What did we learn and do.
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
Elements of Effective Behavior Based Safety Programs
Grader and Pick up Incident June 30 th, Incident Overview 2  On September 20 th,2011 at approximately 2:30am Dan had just finished filling 3 of.
MNM Fatal Falling Material Accident Falling Material Accident April 4, 2013 (Arizona) April 4, 2013 (Arizona) Copper Operation Copper Operation.
1. Module Rev.F1 2  The Integrated Safety Management System (ISMS) is a systematic, common sense approach to working safely. The objective of.
Presented by: Rick Kendall, NA-17 Integrated Safety Management Best Practices Workshop September 2006; Denver Co. Assessment Criteria and Guidelines for.
Integrating Human Performance Improvement Concepts and Tools into Work Planning CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Best Practices: Qualified Observer. Practice Statement Identify and utilize qualified observer for critical tasks.
Standing TSA/Addendum Process Importance of TSAs Why are TSAs important? – Planning safety into the job minimizes surprises and slow downs, thereby improving.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA Improvement of Integrated Work Management and ISM Presented.
ISM Best Practices Workshop Aurora, CO. [September 13, 2006] Performing Work Within Controls – Fieldwork Supervision A Panel Presentation and Discussion.
NCSX Hutch Neilson NCSX Project Manager NCSX Team Meeting January 20, 2005 Meeting Our Safety Management Responsibilities.
U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA Los Alamos National Laboratory Maintenance Work Planner Training.
MNM Fatal Electrical Electrical November 18, 2013 (Kentucky) November 18, 2013 (Kentucky) Crushed Stone Mine Crushed Stone Mine Contract Electrician.
NCSX NCSX Safety Meeting The Arc Flash Event at SLAC – How Should We Respond? Wayne Reiersen 20 January 2005.
MNM Fatal Electrical Electrical October 16, 2004 (Missouri) October 16, 2004 (Missouri) Crushed Stone Operation Crushed Stone Operation Laborer.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
MNM Fatal Slip or Fall of Person Slip or Fall of Person August 21, 2004 (Oregon) August 21, 2004 (Oregon) Sand & Gravel Operation Sand & Gravel.
Electrical Events Involving Look-Alike Equipment within the DOE Complex.
Control of Hazardous Energy 29 CFR Lockout/Tagout Basics? Regulatory requirements Energy Isolation Devices Energy Sources Affected, Authorized.
Training of Airport Visual Aids Maintenance Personnel “Airport Operator” - Are you Meeting the Requirements? IESALC Denver 2015 Presented by Seward Ford.
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
LCLS-II ES&H Requirements: Subcontractors
Maintaining Safety Standards
STOP CARD, Step up, step in for everyone’s safety
Maintaining Safety Standards
IPLOCA Workshop – 2015 Lessons Learned
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
HSE Case: Risk Based Approach.
Cranes, Hoists and Lifting Devices Identification
Management of Change Report Errors to Management.
INDUSTRIAL FIREPROOFING Evaluation Services
Gulfstream Permitting
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Core Drilling into an Energized 13.2 kv Manhole Near Miss Los Alamos National Laboratory, TA-55 Plutonium Facility Presented by Dan Carter, Facility Representative at TA-55

Event Summary Electricians drilled multiple 8 inch holes/cores into an electric utilities man hole containing energized 13.2 kv cables. The actual event occurred in December The concern was identified on January 20, 2011 during a walkdown of the work to be performed. The drilling tool came within approximately 2 inches of the energized cable.

Immediate Actions The Facility Operations Director suspended Nuclear Materials Safeguards and Security Upgrade Project (NMSSUP) operations on January 21, 2011 pending outcome of a Critique. Critique was held on January 24, 2011 NMSSUP management provided actions to ensure IWD requirements would be reviewed in pre-job meetings, and What actions should be taken if it is determined that job hazards and proper controls were not in the IWD prior to resuming construction activities.

Description of Events Additions were being made to the 13.2 kv electrical system as part of the Nuclear Materials Safeguards and Security Upgrade Project (NMSSUP). Two IWD’s were to be generated, the first was to install a new manhole/conduits, the second was to pull cables and splice into the 13,200 volt service line in an existing manhole. Work under the first IWD was to be performed by electricians/wiremen. Work under the second IWD was to be performed by utility linemen at a later date.

Description of Events, cont. Work under the first IWD started in mid A pre-job was held but the IWD was not reviewed. The first IWD hazard analysis did not include work on or near energized 13.2 kv lines. The conduit tie-ins, cable pulls and splicing including coring of 6 holes in the existing man- hole should have been performed under the second IWD.

Description of Events, continued

Barriers that failed Formal Integrated Work Management Process was not implemented This resulted in the wrong personnel performing work using the wrong IWD in close proximity to energized 13.2 kv cables

Step 1: Define the Scope of Work The Person-in-Charge worked from memory and his memory was inaccurate. Failing to use the IWD on the day the work was performed did not give him the opportunity to recognize that the IWD only applied to new manholes. Wiremen failed to review and use the IWD. Personnel perceived a lack of value of IWD’s in daily work execution.

Step 2: Identify and Analyze Hazards The 13.2 kv hazard was not formally identified and analyzed. The wiremen analyzed the hazards based on their knowledge, skills, and abilities as wiremen Their analysis included a discussion of hazards with the site ESH&Q representative and did not include a review of the IWD.

Step 3: Develop and Implement Preventive Measures and Controls The IWD was not originally intended to cover drilling into the existing manhole and did not identify or analyze the hazards. Informally they considered de-energizing the cables but determined it would have a negative impact on facility operations and would delay work execution. Based on their informal hazard identification & analysis the crew developed and implemented a set of measures and controls (on-the-spot) that would prevent them from hitting the energized cables.

Step 4: Perform Work safely From June through November 2010, the PIC used the IWD, hold points were signed off, the IWD was reviewed and signed by the workers. As the months passed by the PIC’s daily use of the IWD diminished and it became a work authorization document to assign work. The PIC forgot the details of the IWD and assumed he could safely assign wiremen to perform core drilling and conduit installation under the IWD. This should have been performed by linemen. The IWD was not used/reviewed to confirm required controls were in place, nor did they confirm the qualification, training of workers and authorization required by LANL to perform this task.

Step 5:Provide Feedback Workers did not provide feedback to the PIC regarding their jurisdictional question. The wiremen sensed that the work might be linemen work. The foreman contacted their union steward, but neither the steward nor the linemen foreman ever notified the PIC of their concern.

Conclusion The root cause of this event was a breakdown in the implementation of LANL’s formal Integrated Work Management Process

Corrective Actions/Lessons Learned A question regarding jurisdiction should result in a pause of work and review of related safety concerns. Believing you can perform work safely is not the same as being trained and qualified to perform work safely. Balancing multiple work activities in a changing work environment requires: –PICs to make frequent decisions on whether to stop work and generate new work control documents –Workers to continually remember which IWD they are working under for the task at hand –IWD’s be reviewed prior to start of work.

Corrective Actions/Lessons Learned cont. Electrical Safety Officers are to independently review all electrical IWD’s. All moderate and high hazard work must have documented daily pre-job briefings. Jurisdictional direction with union is to be updated to clarify medium and high voltage work and clarification on Pause Work in the case of safety implications.

Corrective Actions/Lessons Learned cont. Perform briefings on Scope Change and Electrical Safety to:  Electricians  Managers  Superintendents  Work Control Team Leads  Planners and Maintenance Coordinators

Any Questions If you have any question in the future please contact Dan Carter at: –