ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.

Slides:



Advertisements
Similar presentations
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Advertisements

AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
1 Dale Osborn Midwest ISO March 17, 2008 Detroit, Michigan Great Lake Regional Wind Institute Introduction to the Midwest ISO.
Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.
PJM© PJM as Part of the Eastern Interconnection KEY STATISTICS PJM member companies 750+ millions of people served 60 peak load in megawatts.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Midwest ISO Market Readiness Update October 27, 2004.
ERCOT PUBLIC 7/10/ LTSA Scenario Development.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
PJM©2012 Offshore Wind Integration Studies at PJM September 13, 2012 Steven Herling Vice President, Planning PJM Interconnection.
Long Term Study Scenarios and Generation Expansion Update December 7, 2012.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
Production Cost Model Fundamentals
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  Summary of first LTSA Workshop  Topics and Speakers.
RPG Meeting Five Year Plan Extension Brad Schwarz.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Update - RTOs and Capacity January 28, Purpose of Presentation Update the Commission on issues related to – (1) Ameren Missouri – potential Local.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Generation Portfolio Options Study Philip O’Donnell Manager, Generation Analysis 14 October 2009.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
SPP.org 1. Southeastern Inter-Regional Planning Update (SIRPP) Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Federal Energy Regulatory Commission MISO/Alliance Companies’ RTO Status Reports Presented by: Joseph Power Tony Ingram Rahim Amerkhail Patrick Clarey.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Economic Analysis Proposed Scope ERCOT RPG Meeting September 17, 2010.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Ancillary Services Redesign Update ERCOT TAC Meeting /25/2015.
Long Term Study Task Force Update Modeling Emerging Resources Through 2030 January 13, 2012 LTSTF.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
ERCOT – MISO DC Tie Study Comments
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
LTSA Scenario Development Workshop
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Wind Management at MISO
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Reliability Assessment Committee Proposal TSS Meeting
Transmission Planning at PJM Interconnection LLC
Supplemental Project Planning Process Under Order 890 Within PJM
Presentation transcript:

ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015

2 Background Study Scope Open Issues Process Outline

November 20, Background MISO approached ERCOT about performing a joint study to analyze a DC tie interconnection. MISO South reliability improvement Congestion benefits for MISO and ERCOT Efficiency gains from load and intermittent generation diversity between MISO and ERCOT Drivers

November 20, Study Assumptions ERCOTMISO Process Consistent with RTPMTEP Topology 2015 RTP 2020 Final CaseMTEP 16 BAU 2020 Case Demand (Production Cost Model) 2016 Long-Term Hourly Demand and Energy Forecast (50/50) MTEP 16 BAU Future Generation Existing plus planned generation meeting PG 6.9 minus known retirements Existing plus BAU resource expansion plan minus known retirements Wind, solar load shape year 2006 Regions modeled ERCOT (with five existing asynchronous ties) MISO, SPP, AECI, Manitoba, MRO, PJM, SERC, and TVA

November 20, MISO and ERCOT will agree on fuel prices prior to analysis MISO will perform production cost analysis using PROMOD –ERCOT will conduct sanity check of generation model data –ERCOT will analyze inputs and results Study will analyze the following: –Is a tie project needed? –If needed, what is the optimal location, size, and technology Study Scope

November 20, MISO and ERCOT will also conduct reliability “no harm” analysis Long-Term analysis may also be performed Sensitivity Analysis? –Southern Cross –Potential unit retirements due to increased environmental restrictions (Regional Haze, CPP, etc.) Study Scope cont.

November 20, Finalize NDAs and CEII agreements –Post study models on ERCOT MIS Secure Hurdle rates/ export fees Open Issues

November 20, Process MISO-ERCOT Coordinated Study Tasks 1Present concept to stakeholdersNovember Stakeholder comments dueDecember 4, Finalize scopeDecember Model developmentJanuary – March Perform analysis2016 6Draft joint MISO-ERCOT report?

November 20,