27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.
Homogeneity of Small Chambers T4, T6, T7, T8 and Gas Gain Measurements of Frascati and Roma Chambers Emmanuel Angulo (CSU Fresno) Weekly Meeting ATLAS.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
02-Mar-09A. Cardini / CERN & INFN1 Muon Detector Status (week 9: Feb 23 rd  Feb 27 th ) Present: Ale, Thomas, Nikolai, Oleg, Sasha, Maria Luisa, Perluigi,
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
G. Carboni - Open LHCC - July 2001 Technical Design Report for the LHCb Muon System Giovanni Carboni on behalf of the Muon Group Part II: RPC Detectors,
Construction material – All the material has been ordered with some spare (10%) Material Procurement Faraday cage – Final FEE board dimensions available.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
1 Status of the Test System of the MWPC for the LHCb Muon System Andre’ Massafferri (Universita’ Tor Vergata – INFN sezione II - Roma) V. Bocci, R. Nobrega.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
1 Status of GEM DHCAL Andy White For GEM-TGEM/DHCAL Group March 21, 2011 ALCPG11 Workshop Univ. of Oregon Introduction 30cmx30cm 2D readout with KPiX chip.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
Russian groups in LHCb: Status report V. Egorychev CERN-Russia JWG, October 2009.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
P. Colas - Status of the cosmic run 1 Tsukuba, January 16, 2006 STATUS OF THE DATA TAKING JANUARY 2006 COSMIC RUN.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Ken Wyllie, CERN LHCb power supplies, 19th May Does each sub-detector have enough power supplies for the upgrade???? If not, do they need: More.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Status of GEM DHCAL Jae Yu For GEM DHCAL Group April 25, 2012 KILC Workshop, KNU Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
Status of the Muon detector Alessandro Cardini CERN & INFN Cagliari Thanks do Davide, Rafael, Maurizio, Oleg, for part of the material included here.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
1 26 November 2003, CERN LHCb Muon meeting Anatoli Kachtchouk (INFN Cagliari, PNPI) Final FEE-board conception proposed by Walter Bonivento Sandro Cadeddu.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
The LHCb Installation Story
Preparation of LHCb for data taking
G. Carboni for the Muon Group
LHCb & EYETS
Pre-installation Tests of the LHCb Muon Chambers
Presentation transcript:

27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb

27 December 2006 LHCb Status Report (A.Vorobyov) 2 LHCb

27 December 2006 LHCb Status Report (A.Vorobyov) 3 MWPC production at PNPI M3R4M2R4M4R4 Production plans 200 Produced by Dec Passed all tests at PNPI All classified as Class A except 3 bad M3R4 produced in the beginning of production Delivered to CERN * Production at PNPI-1 is finished. Production at PNPI-2 is finished. *)The last transport to CERN is arriving November 28, 2006 with 70 M4R4.

27 December 2006 LHCb Status Report (A.Vorobyov) 4 MWPC preparations at CERN Preparation Phase 1 1Gas leak tests 2HV test - 1 Dark currents at HV up to 2.9 kV 3Pad capacity tests 4Preparations for chamber dressing 5HV test – 2 Dark currents at HV up to 2.85 kV 6Mounting Faraday Cages 7Dressing with HV and LV lines 1 Installation of FE electronics 2 Pre-installation tests - Thresh. Scan ( Noise counts, Pulse generator counts) - HV test - 3 Dark current up to 2.85 kV - Cosmic ray tests Preparation Phase 2

27 December 2006 LHCb Status Report (A.Vorobyov) 5

27 December 2006 LHCb Status Report (A.Vorobyov) 6 MWPC preparations at CERN

27 December 2006 LHCb Status Report (A.Vorobyov) 7 Preparation Phase 2 Pre-installation Test Stand 5 chambers can be tested simultaneously with the rate of 5 chambers per day

27 December 2006 LHCb Status Report (A.Vorobyov) 8

27 December 2006 LHCb Status Report (A.Vorobyov) 9 Chambers M4R4 # 53, 54, 55, 56, 57 Run _0_0_0 100 sec Cosmic Ray Counts from Internal Counters. Thresh = 15fC. GapA in 5 chambers.

27 December 2006 LHCb Status Report (A.Vorobyov) 10

27 December 2006 LHCb Status Report (A.Vorobyov) 11 Construction Status LHCb Spectrometer VELO RICH1 TT Magnet OT RICH2 Calo. System Muon System

27 December 2006 LHCb Status Report (A.Vorobyov) 12 IP8 now... IP8 Now Mu-system PS SPD RICH-2 OT

27 December 2006 LHCb Status Report (A.Vorobyov) 13

27 December 2006 LHCb Status Report (A.Vorobyov) 14

27 December 2006 LHCb Status Report (A.Vorobyov) 15 Muon wall preparation

27 December 2006 LHCb Status Report (A.Vorobyov) 16 Further planning In the optimistic planning with the pre-installation tests rate of 5 chambers per day, all 600 chambers could be ready for installation by the end of May,2007 However, there will be still problems with additional conditioning of the chambers,repairs etc that may require some additional time HV-System for 4000 channels