2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Click on this image to open the full PDF document.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Inside-, Depth-, and Height-Measuring Instruments
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Ladybugs spending the Winter on the brake hub and inside the wheel rim.
MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Specification section 3.3
Old Main Group. Design Issues There are no changes to the overall Design It will remain the way it is The Attachment Issue is resolved Going to screw.
994 RPDA 21/2”- 6”. Modification Overview  Production of the 994RPDA began in 1999 and is current.  The 994 RPDA currently utilizes the ¾” 009M3 for.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
LINEAR MEASUREMENT.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
1 What is a Linear Guidance System Linear guidance systems are construction elements that are used to enable parts of machines to perform a translation.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Mechanical design and tests of the new X-band flange
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
BY B.JITHENDRA KUMAR Shaper Machine. Introduction The shaping machine is used to machine flat metal surfaces especially where a large amount of metal.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
14/07/2008 Massimo Benettoni PMTs need replacement. SOB volume reduction is desirable. detectors: PMT Hamamatsu H8500 detectors resolution allows smaller.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
VIEW SERIES with Sliding Door
Planning for Proto-DUNE PD Installation and Cabling at CERN
Assembly of the doorknob
Baby-MIND Modules & Services
Update on Pavia MM mechanical prototype
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
SuperB IFR mechanics of IFR prototype – by C. Fanin
NA62 LAV Anti1 REMOVAL & TESTS
FDIRC PMTs dimensional tolerance
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
McMaster linear bearing #6709K180 with guide rail suppressed
880V 21/2”-10”.
Beam Finder Wire (BFW) Status
Presentation transcript:

2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding rails, by precise machining and measuring of block position (references) wrt bearings. Gas tight assembly by means of gasket, no glue to allow easy and fast dismounting Box design allows PMTs rows to slide aside for decoupling (assuming PMTs coupled to quartz with optical grease) Pinholes as references for PMTs and PCB boards PMTs assembly by "horizontal strips” (8 PMTs each): compatible with PCB "vertical" boards assembly? Pattern of threaded and reference holes to fix items not defined/available yet: PCBs support, case for cooling, Fbox to bbox sealing Holes for lifting and handling Hole for fiber entering for test

2010/12/14 Caltech Massimo Benettoni FDIRC Fbox assembly procedure (clean SLAC) FBlock on top back plate, gasket Side plates, “top” references on Fblock top wedge Front bar+ side push buttons Bottom C-shape enclosure Push buttons (belleville spring) on front bar and bottom enclosure

2010/12/14 Caltech Massimo Benettoni FDIRC FBox sealing gasket, sealing to barbox Flat EPDM gasket 4x12 mm between box plates, to avoid risks of air trapped in the Oring grooves EPDM Cord d.10 mm between alu plates and quartz (around PMTs window) Sealing to barbox Very tight space between adjacent barboxes Very tight space between barbox front frame and Fblock wedge Still working out how to close the Fbox to the barbox, at this stage will leave clean flange around wedge E.g: Sealing on barbox "head" perimetral surfaces: fine for CRT test, not solving superB setup (clearance between adjacent barboxes 2mm) Sealing to front surface of barbox head: very tight space between screws and frame and wedge of Fblock: would require to remove screws sticking out from front frame (at least on corners, where frame to Fblock 0.8 mm)

2010/12/14 Caltech Massimo Benettoni FDIRC Sealing to barbox

2010/12/14 Caltech Massimo Benettoni FDIRC Shopping list ready for order Alcoa Alca Plus plate t.10mm, 2 m 2 Alcoa Alca Plus plate t.20 mm, 1 m 2 Alcoa Alca Plus plate t.70&100 mm, 2x0.25 m 2 Anticorodal plate 50x30, 6m Anticorodal U extruded profile 50x50x5 Alcoa Alca Plus plate t=12mm, 2 m 2 Anticorodal plate t=10 mm, 2 m 2 square extruded profile 100x100x4 mm EPDM sheet 4mm, 1x1.5 m EPDM cord 70shore ø10 and 12mm 10+10m n° 3 wheel bearings ø 40 mm (ssteel) n° 30 EPDM ORINGs, various dimensions n° 2 linear bearing ø 25 mm (ssteel) Belleville springs øe 14 øi 7,2 Sp. 0,5 cyl rail bars ø25 x 4 m, steel Include “all” material for box and some alu plates possibly useful for support. Grandtotal of about 3k€, order going to be issued by next week

2010/12/14 Caltech Massimo Benettoni FDIRC PCB boards mounting vs pMTs partitioning Baeline up to now optical grease for PMT optical contact PCB FE boards plugging as into “crate slots” Assuming need of optical grease, PMTs partitioned by rows, 8 elements each rows (or part of rows) can slide aside for PMTs replacing, useful cause optical contact made by grease PCBs and backplane(s) partitioned in columns must be removed “completely” (depending on PCBs partition and # of PMTs removed) PCB mounting requirements for CRT test ?

2010/12/14 Caltech Massimo Benettoni FDIRC Contact to quartz with PET buttons (e.g. Arnite TM )

2010/12/14 Caltech Massimo Benettoni FDIRC Fbox support for CRT test

2010/12/14 Caltech Massimo Benettoni FDIRC Fbox support for CRT test : specifications No deformation under load (even during Fbox sliding) must allow barbox head passing trough support (two halves back flange to be inserted inside the support to fix the barbox to them after box insertion). Must allow free (as possible) access to the gluing area May be used to simulate the SuperB setup (e.g. accessability, gluing before complete insertion..) Alignment strategy to be defined, e.g.: –Align barbox and support to CRT: how, precision –Vertical alignment by barbox adjustable shimming or support shimming (one adjustment by shimming after measuring of both) Relative position of barbox head and support rails must be measured before Fbox insertion (how? e.g. measuring arm)

2010/12/14 Caltech Massimo Benettoni FDIRC Fbox support for CRT test: specifications must be aligned to the CRT structure (any precise reference on it?) barbox must be aligned to CRT structure (parallel to trolley movement, optical and mechanical tolerances) Alignment strategy to be defined, e.g.: –Vertical alignment by barbox adjustable shimming or support shimming (one adjustment after measuring of both) –Align barbox and support to CRT: how, tools, precision Relative position of barbox head and support rails must be measured before Fbox insertion (how? Tools?) The group of Bari going to take care of design and production of the support

2010/12/14 Caltech Massimo Benettoni FDIRC Fbox and support schedule update Preliminary workshop drawings ready, to be refined according to check and approval Not everything is fully defined but main parts could start Part production could begin late January (as soon as we get material) Part production February – March (! coincidence with major workshop restoration/reharsal in Padova!) Very likely to order machining of some/all items to external company Parts still to work out to be defined and produced: sealing to bbox, PMTs and PCB frames Measures and trial assembly April Shipping end April / May Assembly at Slac; May Need check and approval of model asap Support frame schedule … some delay wrt Fbox? to be seen with Jerry and Nicola M.