SUSTAINABLE ENERGY FUND John Costlow Just Live It.

Slides:



Advertisements
Similar presentations
Appendix: Background on RELCOST Results
Advertisements

Farmland Values and Leasing Key Questions Chapter 20 §What determines the value of farmland? §What are the advantages and disadvantages of owning vs. leasing?
CREATIVE FINANCING FOR ENERGY INITIATIVES Ed Kirk CEM, LEED AP.
Capital Investments Chapter 12. Capital Budgeting How managers plan significant outlays on projects that have long-term implications such as the purchase.
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
Energy Financing for Municipalities Andrew Brydges Director, Institutional Programs Clean Energy Finance and Investment Authority (CEFIA) April 2014.
FA2 Module 5. Interest concepts of future and present value 1.Time value of money 2.Basic interest concepts 3.Present and future values a.Single payment.
Discounted Cash Flow Valuation
Chapter 17 Investment Analysis
TOPIC TWO: Chapter 3: Financial Mathematics By Diana Beal and Michelle Goyen.
CEFIA Residential Financing: Smart-E, Solar Lease, CT Solar Loan Training Presentation for Round III.
Accounting for Leases ACCTG 5120 David Plumlee.
Chapter 4: Time Value of Money
CODE Project WP3 – Modelling support for cogeneration across the EU27.
EE535: Renewable Energy: Systems, Technology & Economics
CAPITAL BUDGETING AND LEASING Chapter 4. Investment The addition of durable assets to a business Disinvestment is the withdrawal of durable assets from.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. May 31 Capital Budgeting Decisions.
CEFIA Residential Financing: Smart-E Loan, CT Solar Loan, CT Solar Lease Training Presentation for Solarize West Hartford Ambassadors.
Should You Buy or Lease Your Signs? The Pros and Cons of Billboard Loans and Billboard Leases Dave Westburg
Feasibility of Solar Technology Adoption: A Case Study on Tennessee’s Poultry Industry Ernest F. Bazen & Matthew A. Brown Presented by Yao Yin.
University of Pittsburgh School of Law 2013 Energy Law & Policy Institute October 14, 2012 Citizens for Pennsylvania’s Future (PennFuture). A statewide.
3.1 Sources of Finance Chapter 18 Part 1.
Welcome and Introductions CoServ Presentation & Member Input.
WHY DIDN’T I THINK OF THAT? What does every baseball player need to complete the uniform? A cap. What a business opportunity for C&C Sports! Or is it?
Discounted Cash Flow Valuation.  Be able to compute the future value of multiple cash flows  Be able to compute the present value of multiple cash flows.
6-0 Week 3 Lecture 3 Ross, Westerfield and Jordan 7e Chapter 6 Discounted Cash Flow Valuation.
EPT 221 Engineering Design Introduction to Engineering Economics.
Intro to Engineering Economy
Summer Time Value of Money Session 2 07/02/2015.
NH Utilities Programs/ Carbon Reduction Opportunities Thomas Palma, Esq., CSDP Project Development Executive.
Optimizing Greening Schools for a Carbon Constrained Future Presented to: The Association of California Construction Managers Presented by: Stephanie R.
Lecture 3 Managerial Finance FINA 6335 Ronald F. Singer.
1 Microeconomics Lecture 11 Capital market Institute of Economic Theories - University of Miskolc Mónika Orloczki Assistant lecturer Andrea Gubik Safrany,
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
Risk, Return, and the Time Value of Money Chapter 14.
ECE 7800: Renewable Energy Systems Topic 12: Economic Analysis of Renewable Energy Systems Spring 2010 © Pritpal Singh, 2010.
Florida Real Estate Principles, Practices & Law 38th Edition Linda L. Crawford Copyright © 2015 Kaplan, Inc. All rights reserved.
Rural Development’s Rural Energy for America Program (REAP) Grants and Loans Guarantees & Renewable Energy Feasibility Studies June 5, 2009.
Options for Financing Small CHP Systems Barry Sanders, AmericanDG.
Long-Term (Capital Investment) Decisions
Economic Evaluation of PV systems in Jordan
Energy Economics A synthetic methane plant from coal is to be constructed at a cost of $4 billion dollars. It requires 14,000 tons/day of coal (10,000.
Introduction to Economic Analysis Part 1 February 10, 2014.
NPV and the Time Value of Money
0 CHAPTER 10 Long-Term (Capital Investment) Decisions © 2009 Cengage Learning.
1 Long-Term Liabilities: Notes, Bonds, and Leases.
Cash Purchase vs Loan vs Lease to obtain a capital asset Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
©CourseCollege.com 1 16 Long Term Debt Long term debt - liabilities with due dates greater than one year. Learning Objectives 1.Explain accounting for.
 Discuss the importance of farm credit.  Explain three fundamentals of credit.  List eight rational credit principles needed for effective decision.
Chapter 8 Long-Term (Capital Investment) Decisions.
1 Capital Budgeting. 2 n Capital Budgeting is a process used to evaluate investments in long-term or Capital Assets. n Capital Assets n have useful lives.
FINANCIAL MANAGEMENT FINANCE & BANKING: CHAPTER 3 FINANCIAL MANAGEMENT.
Lecture 2 Managerial Finance FINA 6335 Ronald F. Singer.
Financial Planning Skills By: Associate Professor Dr. GholamReza Zandi
LEASE  A LEASE REPRESENTS AN AGREEMENT THAT GIVES CONTROL OVER ASSETS OWNED BY THE LESSOR TO THE LESSEE FOR A SPECIFIC PERIOD OF TIME UPON THE PAYMENT.
ECON 201 Lecture 4-5(a) Finance: Net Present Value & Benefit/Cost Analysis.
An Overview of Personal Finance The Time Value of Money –Money received today is worth more that money to be received in the future –Interest Rates Nominal.
Third-Party Solar Financing Options in New Hampshire 1.
1 Engineering Economics.  Money has a time value because it can earn more money over time (earning power).  Money has a time value because its purchasing.
CHAPTER © jsnyderdesign / iStockphoto 9 CAPITAL BUDGETING.
Financing Equipment – Pitfalls to Avoid Jennifer Conner VP, Division Controller USPI.
Solving the Energy Puzzle Understanding the Rules of Energy Delivery Electricity Natural Gas Tariffs Solar Combined Heat and Power Generation Distribution.
U NIT 8 - T HE T IME V ALUE OF M ONEY 1. T HE T IME V ALUE OF M ONEY Would you prefer to have $1 million now or $1 million 10 years from now? Of course,
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
1 Simple interest, Compound Interests & Time Value of Money Lesson 1 – Simple Interest.
ESCO MODELS IN INDIA Click to begin.
Environmental Upgrade Agreements
Presentation Chapter 9 Capital Budgeting Cash Flows.
Financial Appraisal of Project
Island Energy Advisory Committee Board
Presentation transcript:

SUSTAINABLE ENERGY FUND John Costlow Just Live It

I N T HEIR H EAD How Many Here Have LED Bulbs in All Sockets at Home? How About CFL’s? How Many Here Arrive on Public Transportation? How About a Hybrid? Why Not 100%?

W HAT YOU ARE A SKING TodayTomorrow Give MeYou Will Save

W OULD Y OU D O I T ? If You Did Not Profit Would You Do It?

T ODAY ' S G OAL – DEMONSTRATE THAT YOUR PROJECT MAKES BETTER SENSE THAN COMPETING INVESTMENTS

F INANCIAL E VALUATIONS Simple Payback Net Present Value Internal Rate of Return Equivalent Uniform Annual Costs Life Cycle Costing

L IGHTING C OMPARISON Type Life Cost Color Temp Dimmable Lumens Rated Power Actual Power Light Emitting Diode 25,000 Hours $ K Yes 800 Lm 12.5 Watts 12.8 Watts Incandescent 1500 Hours $1.97 0K Yes 830 Lm 60 Watts 63.3 Watts Compact Fluorescent 10,000 Hours $ K No 900 Lm 14 Watts 15.7 Watts

EDC R ATES ApplicationResidential IF hours Annual949 Hours Universal Service Rider0.533¢/kWh ACT129 Rider0.242¢/kWh Smart Meter Rider0.005¢/kWh Distribution Rate3.364¢/kWh PPL Price to Compare6.935¢/kWh Energy + Distribution10.299¢/kWh Monthly Fee$8.75/month Retailer 4719 Hours 0¢/kWh 0.333¢/kWh 0.033¢/kWh $4.530/kW 6.387¢/kWh 6.387¢ plus $4.53/kW $14.00/month

S IMPLE P AYBACK Least complicated Favors projects with high initial savings Penalizes projects with a long service life Simple Payback = First Cost Annual Energy Savings

I NTERNAL RATE OF RETURN Does Investment Result in Wealth? Summation of Future Values Compares Investment to Income & Expenses Life of Project To present Value Used to determine Life Cycle Cost Net Present ValueInternal Rate of Return Complicated Requires Iterations Set NPV to Zero Minimum Value that makes investment worthwhile Solve for Discount Rate

L IFE C YCLE C OSTING Identification of All Costs Installation Maintenance Energy Fuel Escalation Inflation Interest on Investment Salvage value Copyright Sustainable Energy Fund 2008 Life Cycle Costing

L IGHTING C OMPARISON Type Life Cost Color Temp Dimmable Lumens Rated Power Actual Power Light Emitting Diode 25,000 Hours $ K Yes 800 Lm 12.5 Watts 12.8 Watts Incandescent 1500 Hours $1.97 0K Yes 830 Lm 60 Watts 63.3 Watts Compact Fluorescent 10,000 Hours $ K No 900 Lm 14 Watts 15.7 Watts

EDC R ATES ApplicationResidential IF hours Annual949 Hours Universal Service Rider0.533¢/kWh ACT129 Rider0.242¢/kWh Smart Meter Rider0.005¢/kWh Distribution Rate3.364¢/kWh PPL Price to Compare6.935¢/kWh Energy + Distribution10.299¢/kWh Monthly Fee$8.75/month Retailer 4719 Hours 0¢/kWh 0.333¢/kWh 0.033¢/kWh $4.530/kW 6.387¢/kWh 6.387¢ plus $4.53/kW $14.00/month

S IMPLE P AYBACK Least complicated Favors projects with high initial savings Penalizes projects with a long service life Simple Payback = First Cost Annual Energy Savings

R ESIDENTIAL L IGHTING C OMPARISON TypeIncandescent First Cost$1.97 Annual Power kWh Rate cents/kWh Annual Cost$6.187 Annual Savings$0 Simple Payback, years N/A Compact Fluorescent $ , $1.534 $ Light Emitting Diode $ $1.251 $

C OMMERCIAL L IGHTING C OMPARISON TypeIncandescent First Cost$1.97 Annual Power kWh Rate cents/kWh6.387 Generation Cost$ Annual Demand Charge Annual Cost$ Annual Savings$0 Simple Payback, years N/A Compact Fluorescent $ $4.732 $0.853 $5.585 $ Light Emitting Diode $ $3.858 $0.696 $4.554 $

T IME V ALUE OF MONEY PV = Present Value FV = Future Value t = time i = rate n = number of periods Formula

T IME V ALUE OF M ONEY TIME PRESENT VALUEFUTURE VALUE AMOUNT RECEIVED AMOUNT EXPENDED Simple Method

T IME V ALUE IF M ONEY Arrows point Away from time Axis Arrows pointing Up are Income Arrows pointing Down are Expense Arrows can be Summed in the Same Year Cash Flow Rules

P RESENT V ALUE OF FUTURE I NCOME Question What is the present value of a payment of $100 at 5% annual discount rate paid 1 year from now. Answer Formula Payment * Factor Substitution $100 * Answer $95.24 Example

P RESENT V ALUE OF F UTURE I NCOME Question What is the present value of a payment of $400 at 6% annual discount rate paid 4 year from now. 4 year at 6% would be factor of Answer Formula Payment * Factor Substitution $400 * Answer $ Example

N ET P RESENT V ALUE Your Choice Add Future Values OR

T IME V ALUE OF M ONEY TIME PRESENT VALUEFUTURE VALUE AMOUNT RECEIVED AMOUNT EXPENDED ANNUAL SAVINGS Future Savings

P RESENT VALUE OF FUTURE SAVINGS STREAM Question What is the present value of a saving of $1400 a year for 5 years with a 4% annual discount rate. Answer Formula Sum(Payment * Factor) Substitution $1400* $1400* *$ *$ *$1400 Answer $5, Factors Year 1 = Year 2 = Year 3 = Year 4 = Year 5 =

N ET P RESENT V ALUE Incandescent Light Calculation for 25,000 Hours TypeIncandescent First Cost$1.97 Annual Power kWh Rate cents/kWh6.387 Generation Cost$ Annual Demand Charge Annual Cost$ Annual Savings$0 TypeIncandescent Life hours1500 Annual Hours4719 Labor Cost/Bulb$4.00 Factors for 4% Year 1 = Year 2 = Year 3 = Year 4 = Year 5 = Year 6 =

R ESIDENTIAL L IGHTING C OMPARISON Type First Cost Annual Power kWh Rate cents/kWh Annual Cost Annual Savings Simple Payback, years Light Emitting Diode $ $1.251 $ Incandescent Light Calculation for 25,000 Hours Factors for 4% Year 1 = Year 2 = Year 3 = Year 4 = Year 5 = Year 6 = TypeIncandescent Life hours25,000 Annual Hours4719 Labor Cost/Bulb $4.00

R ESIDENTIAL L IGHTING C OMPARISON TypeIncandescentCompact Fluorescent Light Emitting Diode Simple Payback, years N/A1.5 years10.1 years Life Cycle Cost$10.38$20.26$50.34 Cost per Hour NPV

SUSTAINABLE ENERGY PURCHASE AGREEMENT

SEF Pays Contractor Contractor Installs Devices Energy Consumption is Reduced "NegaWatts" are created. Energy User Buys "NegaWatts" From SEF

S USTAINABLE E NERGY P URCHASE A GREEMENT No upfront investment Purchase Agreement Price of Negawatt-h less than current energy rates. Cash Flow Positive from Day 1 Immediate Payback Contractor Guarantee Performance Minimal M&V Benefits

S USTAINABLE E NERGY P URCHASE A GREEMENT ItemValue Contractor Payment$14,580 NegaWatts Created – kWh100,000 Utility Rate$0.075 Utility Bill Reduction$7,500 NegaWatt Rate$0.050 NegaWatt Invoice – SEF Payments$5,000 Net Savings – Energy User$2,500 Benefits

SEF FINANCING John Orsini Business Development Specialist

B ENEFITS OF SEF F INANCING 100% Financing Subordinate Lien Positions Interest Only Construction or Rebate Periods Terms Established to Seek Positive Cash Flow No Prepayment Penalty Understanding of Renewable Energy and Energy Efficiency Projects

E ARNING O PPORTUNITIES ESP’s can Earn Up To 0.5% of Loan Value

SEF F UNDING P RODUCTS Loan Lease, Capital Sustainable Energy Purchase Agreement “NegaWatt” Financial Products

F UNDING P RODUCTS Term Loans Possible upfront investment Fixed rate/term Fully-amortizing Full ownership

No upfront investment Benefits and drawbacks of Ownership Own Equipment at End of Lease Lease Considered Debt F UNDING P RODUCTS Capital Lease

F UNDING P RODUCTS If any one of four conditions exist, lease is a capital. Lease Life Exceeds 75% of Asset Life. Transfer of Ownership at End of Lease. If Asset can be Purchased at End of Term at “Bargain Price”. Present Value of Lease Payments Exceed 90% of Fair Market Value of Asset. Capital vs. Operating Lease

S USTAINABLE E NERGY P URCHASE A GREEMENT No Upfront Investment Purchase Agreement Avoided kWh’s = “Negawatt-hrs” Negawatt-hrs Purchased by Customer Operating Expense NegaWatt

PROJECT T YPES Building Envelope Measures Lighting Heating, Cooling, and Ventilation Geothermal Heat Pump Demand Reduction Industrial Methods Building Automation flue Gas Heat Recovery VFD’s Efficient Motors Energy Efficiency

PROJECT T YPES Solar PV Anaerobic Digesters Wind Micro-hydro Biogas Biomass CHP from Sustainable Feed Stocks Renewable Technologies

R EQUIRED D OCUMENTATION < $35,000 Complete Application. Financial Statement or Tax Returns for last Fiscal Year. Interim Statement Recent Quarter. Schedule of Business Debt. Copy Project Proposal. Personal guarantee FICO > 724 DSCR > 1.1:1 2 Years of Operation Positive Net Worth

R EQUIRED D OCUMENTATION > $35,000 Complete Application. Financial Statement or Tax Returns for last 3 Fiscal Years. Interim Statement Recent Quarter. Schedule of Business Debt. Copy Project Proposal. Personal guarantee FICO > 680 DSCR > 1.2:1 2 Years of Operation Leverage Ratio < 4.0X

T ERMS Minimum $10,000 Maximum Loan$1,000,000 Length 5 Years Amortization Length Up to 10 years Interest Only PeriodUp to 6 months Interest Rates $35, % Origination Fee $35,000 1% or $350 Outside of Pennsylvania (Very limited) plus 1%

H OW TO C OMPLETE A PPLICATION

O NLINE C ALCULATOR

E XAMPLES Example #1 Contractor – Municipality LED Traffic Lights Borrow $10,012 3 year loan Include financing rebate Example #2 Veterinary Clinic Solar Thermal System Borrow $65,000 5 year loan Includes PA Sunshine and DEP Grants Example #3 Hospital Energy Efficiency Upgrade $2,099,457. SEF portion $892,269 8 Year Lease Multiple Party Deal Example #4 Public Library New Mechanical System Gas and Electricity Reduction $250,00 6 Years

C ONTACT I NFORMATION Business Development Specialist John Orsini PRI Analyst Scott DeStefon