SLAC All Hands Briefing: FY2008 Budget Persis S. Drell SLAC Director 1/7/08.

Slides:



Advertisements
Similar presentations
DOE Office of Science Budget Overview
Advertisements

Director’s Welcome Jonathan Dorfan 32 nd Annual SSRL Users Meeting October 17, 2005.
FES International Collaboration Program: Vision and Budget Steve Eckstrand International Program Manager Office of Fusion Energy Sciences U.S. Department.
Department of Energy Office of Science HEP FY08 Budget Status and Issues Robin Staffin preCRB Discussion April
Office of High Energy Physics Report to the AAAC Kathleen Turner Office of High Energy Physics (HEP) Office of Science (SC), U.S. Department of Energy.
Structural Genomics – an example of transdisciplinary research at Stanford Goal of structural and functional genomics is to determine and analyze all possible.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
1 SLAC National Accelerator Laboratory Amber Boehnlein October 18, 2011.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
Comments to P5 Persis S. Drell Director SLAC. February 22, 2008P52 Advice to the Community We have to listen to what we are being told We must be willing.
Sept. 18, 2008SLUO 2008 Annual Meeting Vision for SLAC Science Persis S. Drell Director SLAC.
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
U.S. Department of Energy’s Office of Science Dr. Raymond Orbach February 25, 2003 Briefing for the Basic Energy Sciences Advisory Committee FY04 Budget.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
This is the last message in this gathering of North American PI’s with an interest in the INFN hosted SuperB project. I will try to deal with issues on.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
June 12, 2007DOE Program Review1 Emergency Information Be aware of exits in your building Be aware of exits in your building –Speaker will indicate locations.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Under Secretary for Science U.S. Department.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
Future Planning for SLAC Persis S. Drell. December 5, 2003SLAC Scenarios2 Scenarios Study 2003: Process  Started early in 2003  Inclusive of SLAC faculty,
Budget Briefing with OHEP Staff: March 3, 2009 Page 1 SLAC HEP Budget Meeting Summary Discussion Charts S. M. Kahn, D. B. MacFarlane, R. Alva SLAC Rev.
September 26, 2005SLUO Meeting1 The State of the Laboratory Persis S. Drell Deputy Director, SLAC.
National Fund 2.0: Vision Across America, communities are thriving because local leaders are working in partnership so that employers have the skilled.
3/6/2006FY07/08 DOE Budget Briefing1 FY07/08 Budget Briefing Jonathan Dorfan Director Persis Drell Deputy Director SLAC.
Long Range Planning Pier Oddone September 24, 2007.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
DOE Annual Review of SLAC HEP Research Program June 14-16, 2005 SLAC Charge to Committee Issues Procedures.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
U.S. Department of Energy Office of Science U.S. Department of Energy Office of Science High Energy Physics Advisory Panel Meeting FY 2009 Budget Request.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
The Library The HEP Databases & The Changing Science at SLAC.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
All Hands Meeting FY 2008 Budget Pier Oddone Fermilab December 20, 2007.
Light Source Reviews The BES Perspective July 23, 2002 Pedro A. Montano Materials Sciences and Engineering Basic Energy Sciences BASIC ENERGY SCIENCES.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
3/15/ SABER Workshop March 15 & 16, 2006 Organizing Committee: Roger Erickson Mark Hogan Bob Noble Stephanie Santo Bob Siemann.
U.S. Department of Energy Office of Science U.S. Department of Energy Office of Science Basic Energy Sciences Advisory Committee Meeting FY 2009 Budget.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Office of Science U.S. Department of Energy 1 ILC R&D Program Dr. David Sutter, Senior Program Manager Office of High Energy Physics Office of Science.
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
Scientific Computing at SLAC: The Transition to a Multiprogram Future Richard P. Mount Director: Scientific Computing and Computing Services Stanford Linear.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
All hands meeting Budget discussion P. Oddone, February 15, 2011.
U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Director, Office of Science April 29, 2004 PRESENTATION FOR THE BIOLOGICAL AND ENVIRONMENTAL.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Workshop Overview, Charge and Deliverables Joachim Stöhr.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
MORE INVESTMENT in an Incomparable National Resource: Science at the DOE-BES Light Sources Our Message: Support Proposed FY03 Budget The President’s FY03.
Committee to Assess the Current Status and Future Direction of High Magnetic Field Science in the United States 18 May 2012 Dr. Patricia M. Dehmer Deputy.
Budget Outlook Glen Crawford P5 Meeting Sep
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
Office of Science January 28, 2008J.Blazey / SiD Workshop / SLAC1 The View from DOE Moving ForwardMoving Forward HEPAPHEPAP FY08 “in review”FY08 “in review”
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
6/13/20161 South Seattle Community College College-wide Meeting Budget Planning for FY March 10, 2008.
Brookhaven Science Associates 2006 RHIC & AGS Annual Users’ Meeting June 5-9, 2006 Sam Aronson Interim Director.
CPAD Instrumentation Frontier Meeting October 5-7, 2015 Glen Crawford, Helmut Marsiske Office of Science, U.S. Department of Energy DOE Office of High.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
U.S. Department of Energy’s Office of Science Presentation to the Basic Energy Sciences Advisory Committee (BESAC) Dr. Raymond L. Orbach, Director November.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
Yet Another Report from DOE Office of High Energy Physics
LCLS Ultrafast Science Instruments
Atomic, Molecular, and Optical Sciences
Introduction FY09 Linac Ops Review
LCLS Instrument MIE Project: Staffing, Schedule
Presentation transcript:

SLAC All Hands Briefing: FY2008 Budget Persis S. Drell SLAC Director 1/7/08

FY2007 President’s Request for DOE Office of Science –$4.1B FY2007 Allocated budget DOE Office of Science –$3.8B Shortfall –$300M

FY2008 President’s Request for DOE Office of Science –$4.4B FY2008 Allocated budget DOE Office of Science –$4B Shortfall –$400M

DOE Basic Energy Sciences Allocated Budget FY07$1.25B President’s Request FY08$1.5 B Allocated Budget FY08$1.3 B Resulting shortfall nationally ~$200 M At SLAC –LCLS Construction fully funded –PULSE space renovation in Bldg. 40 fully funded –LUSI project ramped up –SSRL approximately flat –XLAM and PULSE growth scaled back

DOE High Energy Physics Allocated Budget FY07$752M President’s Request FY08$782M Allocated Budget FY08$694M Resulting shortfall nationally of ~$90M At SLAC –Projected FY08 HEP ~$120M –Actual FY08 HEP ~$95M

Program SLAC LCLS and LUSI construction will proceed –early operations for LCLS at the end of FY09 and CD-4 for LCLS in SSRL will likely curtail user operations in FY08 by 15% ILC SLAC will be stopped for this year. The future is uncertain. The B-factory program will terminate at the beginning of March

Staffing SLAC To cope with the budget realities of FY08 and prepare for FY09 –Involuntary layoff of 125 additional people from the lab –This is in additional to the program in process (announced Nov. 2) to readjust the skills mix at the lab to optimize the workforce for future LCLS operations

SLAC 1 Year from Now Opening new scientific frontiers with start of LCLS commissioning and subsequent operations –Continued strong user and research program at SSRL –Continued leadership in particle physics, astrophysics and accelerator research –Continued leadership in ultrafast science and advanced materials Smaller laboratory staff More effective mission support services More focused scientific programs Stronger ties to Stanford main campus We should not underestimate the challenges but the opportunities ahead of us are great