November, 2013 TH 53 Realignment: E-1A Preliminary RSS Design GALE-TEC ENGINEERING, INC/Dr. B.R. Christopher November, 2013 Gale-Tec Engineering, Inc.

Slides:



Advertisements
Similar presentations
Site Grading Site Grading Civil Engineering and Architecture
Advertisements

1 CTC 261 Hydraulics Culvert Design. 2 Objectives  Know the factors associated with culvert design  Know what a skewed culvert is.
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
Chapter 3: Elements of Design Transition Design Controls (p
A World of Solutions TM Falgout Canal Floodgate Structure Unbalanced Forces and Proposed Solutions October 2013.
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
Earthmoving Materials and Operations
SLOPE STABILITY ANALYSIS
Center Street & 2080 East Roadway Connection Springville City John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist.
Earthwork for Designers. What needs to get done first? Request Conventional/Photometric Survey Preliminary Plans - should be prepared once horizontal.
MINE WASTE DUMP The Overburden of waste and uneconomic mineralized rock is required to be removed to mine the useful mineral resource in a surface mining.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Lecture 3 Earthmoving Materials
CTC-375 Construction Methods
Contour and Topo map Applications Profile View (Longitudinal Sections): Roads, Canals, Pipes,… Cross-Sectional View, Roads, Canals, Pipes, Building,…
SEISMIC ANALYSIS Stability of a slope can be affected by seismicity in two ways: earthquake and blasting. These seismic motions are capable of inducing.
Mechanically stabilized earth wall in Northwest Greece
CE 453 Lesson 24 Earthwork and Mass Diagrams
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010 Case Study Session
Areas and Volumes Introduction Faculty of Applied Engineering and Urban Planning Civil Engineering Department 2 nd Semester 2008/2009 Surveying.
Your logo کاربرد ژئوگرید در افزایش پایداری موج شکنها
Bridge Engineering (5) Substructure – Abutments and Piers
Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
Department of Civil Engineering,
Planning for Earthwork Construction
Geotechnology Fundamental Theories of Rock and Soil Mechanics.
Reclaiming Surface Mines ©2007 Dr. B. C. Paul. Mines That Can Be Concurrently Reclaimed  Area Strip Mines and Most Contour Strip Mines can be reclaimed.
CE303: Introduction to Construction Blueprint Lab.
Highway Route Surveys And Location
Copyright © 2006 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Slope Rate and Slope Horizontal and Vertical Lines Applications 3.5.
Chapter C Cross Section (ANSWERS )
Highway Subgrade (1) Introduction
CE303: Introduction to Construction Blueprint Lab.
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
ESTIMATING EARTHWORK DR. Nabil Dmaidi.
Earthwork & Volumes Spec Requirements End Areas End-area Volumes
Soil And Rock General Soil Characteristics Trafficability – ability of soil to support weight of vehicles under repeated traffic –Controls traffic on unimproved.
Mass Diagrams Balance Cuts and Fills Shrink/swell Mass Diagram Cost Analysis.
Copyright © 2014, 2010, and 2006 Pearson Education, Inc. Chapter 3 Introduction to Graphing.
Bridge Hydraulics and Geotechnical. BRIDGE HYDRAULICS AND GEOTECHNICAL TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2 The Hydrological.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 5 ESTIMATING EARTHWORK.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
ECNM Meeting October 1, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects.
1 | Eton Range Realignment Project RAAG Presentation 10 March 2016.
FHWA CMGC Workshop October 23, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that.
 PREPARED BY:  AVAIYA KEYUR ( )  BADRUKHIYA DHAVAL( )  BHANDERI AKASH( )  CHATROLA VIVEK( )  CHAUDHARI.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
Available at: hwy53relocation/sco ping.html hwy53relocation/sco ping.html.
 HDR, Ott Constructability, Dan Brown  Visit and boat tour of Rouchleau pit ◦ Access better than potrayed ◦ Challenging geotechnically 
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Development of Seismic Design Approach for Freestanding Freight Railroad Embankment Comprised of Lightweight Cellular Concrete Cell-Crete Corp. Steven.
Geotechnical Investigation
DESIGN CONSIDERATIONS OF CONSTRUCTION OF EMBANKMENT
Presented by Engr. Motaher Hossain
EAG346-Sem II 2014/2015 Lesson 2.
CT Reinforced Earth Structures
Soil Mechanics-II Earthen Dames
Soil Mechanics-II Soil Stabilization and Improvement
How Do Geologists Learn About Earth’s Interior?
ANALYSIS AND DESIGN CONSEPT OF GRE PF RETAINING WALL
Geologic Geometry.
Comparison of Seismic and Well Data
Soil Mechanics-II Earthen Dames
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Design of Stable Channels CH-4
Slope 3.5 Rate and Slope Horizontal and Vertical Lines Applications.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Presentation transcript:

November, 2013 TH 53 Realignment: E-1A Preliminary RSS Design GALE-TEC ENGINEERING, INC/Dr. B.R. Christopher November, 2013 Gale-Tec Engineering, Inc.

E-1A Alignment E-1A Alignment Gale-Tec Engineering, Inc. City of Virginia UTAC Thunderbird Mine Pit Existing TH 53 Old Rouchleau Mine Pit

E-1A Alignment E-1A Alignment Gale-Tec Engineering, Inc.

E-1A Alignment E-1A Alignment Gale-Tec Engineering, Inc.

E-1A Alignment E-1A Alignment Gale-Tec Engineering, Inc.

E-1A Alignment E-1A Alignment Gale-Tec Engineering, Inc.

E-1A Alignment E-1A Alignment Gale-Tec Engineering, Inc.

E-1A Alignment E-1A Alignment Gale-Tec Engineering, Inc. Rouchleau Pit City of Virginia Roadway Profile 130 – 170ft ~ 2800ft

E-1A Alignment E-1A Alignment Submerged Haul Road Embankment – Topo Map Gale-Tec Engineering, Inc. Haul Road Embankment Highwalls (80ft) ~520ft

E-1A Alignment Submerged Haul Road Embankment 2013 MnDOT Drilling/Resistivity Study 40 – 120ft Mine Waste Rock Boulders/Cobbles over Cherty Bedrock Gale-Tec Engineering, Inc.

E-1A Alignment Submerged Haul Road Embankment Gale-Tec Engineering, Inc. Results of Resistivity Study Recovered Core Samples from Drilling

E-1A Alignment Roadway Embankment Footprint 3H:1V Side slopes will create a Roadway Embankment Footprint about 1100ft wide 1H:1V Sideslopes reduce Footprint Width to 450ft 1H:1V Sideslopes requried to fit Roadway Embankment on Submerged Mine Haul Road Gale-Tec Engineering, Inc.

E-1A Alignment Why are Reinforced Soil Slopes Required ? Reduce Embankment Footprint Submerged Haul Road Embankment only 500ft Wide Reinforce Embankment from Seismic Forces Caused by Mine Blasting Events Less Fill Material Required For Embankment Gale-Tec Engineering, Inc.

E-1A Alignment Roadway Embankment Footprint 1H:1V Embankment Side Slopes Gale-Tec Engineering, Inc.

E-1A Alignment Roadway Embankment –Fill Quantities Embankment with 3H:1V Side slopes : >10 Mil CY Fill Embankment with 1H:1V Side slopes : 4 Mil. CY Fill Gale-Tec Engineering, Inc.

E-1A Alignment Roadway Embankment Design Seismic Forces Mine Blasting induces Seismic Forces Acting on Embankment HDR/Revey Assoc. Study of UTAC Thunderbird Pit in 2012 HDR/Revey Assoc. Study indicates PPAmax = 0.3g Gale-Tec Engineering, Inc.

E-1A Alignment Roadway Embankment Design Stability Analysis Need to Reinforce Both Embankment Sideslopes so Back-to Back RSS Embankment is Required Seismic Stability Governs Design – Horizontal Seismic force of 0.3g added to each slice during Stability Analysis Vary Geogrid Strength, Vertical Increment, Horizontal Length until Adequate Seismic Factor of Safety (1.1) Obtained With Seismic FS = 1.1, Static FS = 2.5 Gale-Tec Engineering, Inc.

E-1A Alignment Roadway Embankment Design Stability Analysis – Typical Section Gale-Tec Engineering, Inc.

E-1A Alignment Roadway Embankment Design Seismic Stability Analysis - Results Gale-Tec Engineering, Inc. Direct Sliding Global Stability w/Highwall

E-1A Alignment Roadway Embankment Design Questions? Gale-Tec Engineering, Inc.