Activated Sludge Workshop Techniques and Tools that Improve Clarifier Performance Mike Beattie Operations and Reliability.

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Desalination Becomes A Reality In Tampa Bay Florida
Operator Observations
Welcome to American #2 Wastewater Treatment Plant.
CE 370 Sedimentation.
CLARIFIERS Prepared By Michigan Department of Environmental Quality
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
1000 Friends of Florida Presentation on May 12, 2005 Presenter: Kart Vaith/CDM
Treatment of Slaughterhouse Wastewater
1 CTC 450 Review Preliminary & Primary Treatment Preliminary & Primary Treatment Measure flow Measure flow Screen Screen Grit chamber Grit chamber Primary.
Anne Arundel County Department of Public Works
Biological waste water treatment
Brief introduction about Segovia Segovia is a city in Spain, the capital of the province of Segovia in Castile- Leon. It is situated about an hour north.
Waste Water Treatment (Sewage Treatment)
Treatment
Math Basics I Area, Volume, Circumference, Converting Inches to Feet, Converting Flow, Converting Percent/Decimal Point, Decimal Point, Detention Time.
Surface Water Treatment Plant
Nitrification and Denitrification
ROTATING BIOLOGICAL CONTACTOR (RBC) PROCESS
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
Folklore in Activated Sludge Treatment Plant Operations
ACTIVATED SLUDGE PROCESS
Biosolids Treatment and Disposal
Domestic Waste Water Treatment
BIOTECHNOLOGY FOR INDUSTRIAL WASTES. BOD COD TRATTAMENTO CHIMICO TRATTAMENTO BIOLOGICO Most biological waste and wastewater treatment processes employ.
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
Flotation Flotation involves separation of solids from the water phase by attaching the solids to fine air bubbles to decrease the density of the particles.
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion.
Applications for CBX Sludge Blanket Meter Savings and optimization of the process.
Secondary Treatment Processes
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.
Using the CPE Approach to Optimize Industrial Waste Treatment Facilities Ronald G. Schuyler and Michael Rothberg Rothberg, Tamburini, and Winsor, Inc.
Representative Sampling. Samples vs. Populations The population is the total or all of the possible answers we might get by sampling. All of the individuals.
Wastewater Treatment. Moorestown Wastewater Treatment Plant.
Natural Resources Waste Water Management. Wastewater entering the treatment plant includes items like: Wood Rocks Dead animals Wedding Rings  Unless.
Screening: Wastewater entering the treatment plant includes items like wood, rocks, and even dead animals. Unless they are removed, they could cause problems.
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
Wastewater Treatment Principles and Regulation. What is Wastewater? Sewage released by residences, businesses and industry Contains liquid and solid components.
PERFORMANCE MONITORING – DEMO SESSION
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
© 2014 Evoqua Water Technologies LLC INTRODUCING THE CAPTIVATOR George Smith; Director of Biological Processes.
Tools to Control Energy Use through O&M Practices Wastewater/Water Sustainable Energy Cohort, October 11, 2012 Presentation by Walt Mintkeski, P.E.
When you pull the drain plug, wash clothes, or flush the toilet the magic of wastewater begins......
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
CTC 450 Review WW Collection Systems Types of pipes Installation.
2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.
Basic Process Design Parameters Food to mass ratio (F/M) = Q x BOD MLSS x V Where Q = average daily sewage flow to aeration (Ml/d) BOD = Average settled.
Welcome to American-Bath Wastewater Treatment Plant.
Conventional Sewage Treatment Plants:
Modified Ludzack-Ettinger Wastewater Plant
Preliminary Treatment Removing Large Solids Material by Raking & Screening REMOVES 1.
Secondary Treatment Processes
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Activated sludge settling problem resolved
Wastewater Treatment.
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
CTC 450 Review Preliminary & Primary Treatment Measure flow Screen
Schererville WasteWater Treatment Plant
Application of Process Simulators and CFD to Optimize Process Capacity of WRRFs November 13, 2017.
Wastewater Facilities Upgrade Project
Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update The 7th Biennial Meeting of the Lake Erie Millennium Network.
Advanced Wastewater Treatment
Presentation transcript:

Activated Sludge Workshop Techniques and Tools that Improve Clarifier Performance Mike Beattie Operations and Reliability

Troubleshooting: Provide some simple things to assist Can you run your plant using only a settleometer? Diagnostics Fundamental biology vs. Operating adjustments Topics Today Develop a Robust Operational Scheme Limit Standard Deviation Limit changes on other areas Avoid CTRL-ALT-DEL Brown and Caldwell 2

Reduce overflows No more convenience pressure relief Treat more/bypass less Would a clarifier that could only treat 3 MGD be of any use? My History 1992 Administrative Order Brown and Caldwell 3

Foaming, Scum Bulking Solids Washout Rising Sludge Ashing Straggler Floc Plant could only handle 3 MGD Anything > = MASSIVE WASHOUT Seen it All Brown and Caldwell 4 16 X 120 Clarifiers

What causes all of these things to happen? What where the commonalities? The end result had to be a simple decision making tool Operators had to Understand Original Design Intent (train, train, train, 21 conversations) SOR, Weir Overflow Rate, Solids Loading Rate, Solids Under-loading Rate Nuances of settled sludge Too much or too little food results in poor sludge quality Questions and Quest for Knowledge (The Grail) Brown and Caldwell 5

Drawings Influent Distribution Baffles Pump Capacities Flow Meters Calibration Needed to Understand Original Design Intent and Changes Brown and Caldwell 6

Found that the tanks were built in 1956 Original Primary Clarifiers Original operating depth was 7 feet Institutional knowledge was “ever since (1972) we got that aeration basin and those new primary clarifiers these final clarifiers have been nothing but a problem” Drawing Review Brown and Caldwell Grit Removal Primary Clarifiers Aeration Basin series/and parallel Gas Storage Digester Retrofit old primary clarifiers to finals Disinfection

Added Three Ponds (did I mention our collection system 240 MGD) 1978 Upgrade Brown and Caldwell 8

Drawings Said Yes Tank Inspection=NO! Most taken out during collector upgrade but not replaced $3,000 fix Final Clarifiers-I (used to) Have Baffles Brown and Caldwell 9

Inspecting for debris is very helpful Sampling the entire water column? Could a sludge judge, some buckets and a little laboratory work tell you anything? Proper Sludge Judge Use (ITA Study) Dye testing can be helpful CFD modeling can be helpful Influent Distribution Brown and Caldwell 10

Quieted the entry of the aeration basin effluent (no waterfalls into clarifier) mid-depth entry is was best Adjusted influent gates to even flow Leveled and set effluent the weirs Bucket tests of the RAS pumps Additional Efforts Brown and Caldwell 11

Identify all parameters where someone could make a decision, adjustment, equipment on and off Calculate standard deviation for the parameters Found out RAS Flow standard deviation was 200% MLSS standard deviation was 1500 mg/L WAS Concentration similar Design Issues Vetted-Next Step-Operate Brown and Caldwell 12

Can the operator directly influence RAS TSS? Can the operator directly influence MLSS TSS? Can the operator directly influence WAS parameters? How does the tail wag the dog here? How ?? Brown and Caldwell 13

What is Quality Sludge? Activated sludge that: Flocculates Settles and filters Compacts The influences did not matter unless I understood the goal: Quality sludge to get the most out of our clarifiers! Brown and Caldwell 14

Recommends Using the Settleometer Recommends that RAS Flow Control is Very Important Discusses the concept of different settling sludges exist that can do the same thing Learn the Blues Before You Learn How to Rock and Roll Brown and Caldwell 15

Flocculation? Settling? Compaction? What does Sludge Volume Index have to do with any of these? When is it done flocculating, settling, compacting? What is SVI Really? Does SVI allow you to measure- Brown and Caldwell 16

Sludge can settle at a rapid rate Sludge can settle at a normal rate Sludge can settle at a slow rate Rate of Settling All three types of sludge can flocculate, settle and compact All three can remove enough BOD to meet permit All three can perform well in a clarifier Brown and Caldwell 17

How Does RAS Concentration respond to Changes in RAS Flow? Brown and Caldwell 18

How does MLSS respond to changes in RAS Flow? Brown and Caldwell 19

How Do Solids Filter and Compact in the Settleometer? Brown and Caldwell 20

Collect more data during settle test 5, 10, 15, 20, 25, 30, 60, 120, 180, 240 minutes 5 minute-measures settling 15 minute-filters 30 minute-compaction Recommendations from Al’s Work Brown and Caldwell 21

Less than 500   900 or higher  Use 5 minute reading on MLSS to Type I have a Rapid Settling Sludge I have a Normal Settling Sludge I have a Slow Settling Sludge Brown and Caldwell 22

The goal is to determine when is the RAS sludge done settling, filtering and compacting in the final clarifier Spending the correct amount of time in the final clarifier allows much better process control Al Says - How do I know when its time to send the bugs back to the aeration tank? RAS Settleometer Test Collect Data at: 30 Minute 60 Minute 120 Minute Brown and Caldwell 23

<500  Rapid  RAS at 30 Min  Normal  RAS at 60 Min 900 or higher  Slow  RAS at 60 Min Use 5 minute reading on MLSS to Decide RAS Test Brown and Caldwell 24

What kind of sludge Use appropriate RAS Reading (30, 60 or 120 min) When RAS is at 900 its done What Now? Is reading above or below 900? If above 900 RAS turn RAS rate up 5-10% If below 900 turn RAS rate down 5-10% Brown and Caldwell 25

Before No more than 3 MGD Massive solids loss during storm events Permit Anxiety Flow diverted to other facilities Extreme STD DEV Remember My Plant? After 13 MGD Highest effluents out of plant were 50 ppm Reduced flow diversion by 85% MLSS STD DEV 300 mg/L RAS STD DEV 25% Brown and Caldwell 26

Unlock hidden capacity without adding any concrete Reduce energy usage Nutrient removal UV disinfection Your ready to rock and roll! If you can master this simple settleometer technique Brown and Caldwell 27

Questions?? Mike Beattie Brown & Caldwell Operations/Reliability Brown and Caldwell 28