Ross Parkman PE Ryan Wester PE Central Chiller Plant Experience Big Ten and Friends Mechanical and Energy Engineering Conference October 1, 2013.

Slides:



Advertisements
Similar presentations
Commissioning Approach Integrated Service Solutions
Advertisements

UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
WHO - PSM Water –part 3 Workshop on GMP and Quality Assurance of HIV products Shanghai, China 28 Feb - 4 March 2005 Maija Hietava M.Sci.Pharm Quality Assurance.
Energy Sub-Metering for Measurement and Verification
ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
Technology in Architecture Lecture 10 Mechanical Systems Lecture 10 Mechanical Systems.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
ME 4343 HVAC Design Real-Time Building Energy Modeling and Fault Detection and Diagnostics for a DoD Building Bing Dong 1, Zheng O’Neill 2 1 University.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
AFFILIATED ENGINEERS, INC. THE UNIVERSITY OF TEXAS MEDICAL BRANCH (UTMB) AT GALVESTON Presented to Houston Area Association of Hospital Engineering July.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Hydraulics.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
BETHESDA CENTRAL PLANT 6”
1Belimo Americas Danbury, Connecticut Belimo Energy Valve™ Investing in Efficiency.
Utility Planning For North Campus Upgrades Area in and around Cook Physical Science Building Sal Chiarelli, Director of Physical Plant November 15, 2007.
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
CHW Optimization Case Studies
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Chilled Water Systems Total Cost of Ownership
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
ENTERPRISE ENERGY MANAGEMENT SYSTEM Jason Kutch, P.E. Malcolm Drane, P.E. UTILITY METERING AT PURDUE.
Examples of Commissioning Cost Savings Commissioning for Sustained Building Performance September 29, 2011 Marriott Birmingham, AL.
RICHARD BROWN UPF Procurement Director October 31, 2013.
1 Steam to Hot Water Conversion The University of British Columbia Paul Holt Director, Generation & Distribution.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Some Basic UVM Info 425 acres of maintained acreage.. Central Steam Plant Central Chilled Water Plant Back Up Boilers Research.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009.
Retrocommissioning Program UBS 677 Washington Blvd, Stamford, CT.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Dialing it in: A Year of Tuning the NCAR-Wyoming Supercomputing Center Aaron Andersen, Deputy Director of Operations, National Center for Atmospheric Research(NCAR)
Utility Engineers, PC.  Generation  Transmission  Distribution.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Welcome. GRU South Energy Center Anderson Illustration Association, Inc Phase 1 – 500,000 sf – 192 beds Build out – 3 M sf - 1,200 beds Shands.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Commissioning Forms & Procedures ESCONDIDA CONSTRUCTION COMPLETION PHASE CIVIL PROCEDURES INSTRUMENTACION PROCEDURES Testing Test of Density In Field Z01.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Data Center Energy Use, Metrics and Rating Systems Steve Greenberg Energy Management Engineer Environmental Energy Technologies Division Lawrence Berkeley.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
AstraZeneca R&D Boston Waltham Energy Reduction Initiative 2016 Green Labs Symposium.
The Data Center Challenge
UMCP Learning Objectives
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Grunenwald Science and Technology Building
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Ross Parkman PE Ryan Wester PE Central Chiller Plant Experience Big Ten and Friends Mechanical and Energy Engineering Conference October 1, 2013

2 Discussion Topics Planning Design Project Delivery and Construction Commissioning and Startup Operations Q&A Facilities Operation and Development

3 Significant Planning Milestones Feasibility Study Med Center Chiller PlantJune 2004 Campus Infrastructure Master PlanMarch 2006 Preliminary Design and Cost EstimateSept 2006 Additional Studies and Value Engineering Redesign option for “Building Loop” Planning/design New Bed Tower and Existing Hospital HVAC Upgrades Feasibility Study/Life Cycle Cost for “Building Loop” vs. Central Plant Plant Site Studies (W of Cannon / 10 th Ave, W of Cannon / E of Cannon) A/E and Construction Manager ContractsAug2009 Program of Requirements Oct2009 Estimate of Probable CostNov2009 Facilities Operation and Development

4 Key Project Dates Chiller Order 2500 tons)June 2010 Construction Start January 2011 Initial Equipment TestingMay 2012 “Construction” Chilled WaterAugust 2012 “Reliable” Chilled WaterOctober Additional Chillers December 2013 Plant Statistics 20,000 tons initial plant capacity (5000 tons on standby generators) Awarded LEED Silver by USGBC 10,000 tons future expansion Free cooling future addition Facilities Operation and Development

5 Design and Project Delivery Tunnel and distribution piping designed and constructed as part of Med Center Expansion Project Building Exterior Design by Signature Architect Local Architect of Record and Engineering Team Controls integrator on A/E team Design and building modeling with Revit Chillers selected and direct purchased through State of Ohio Term Contract Active input by OSU Utilities (McCracken Chiller Plant Experience) Commissioning Agent Facilities Operation and Development

6 Design and Project Delivery (cont.) Utilized Construction Reform opportunity: State of Ohio designated 3 demonstration projects for Construction Reform Medical Center Expansion including Chiller Plant was identified as the “LARGE” demonstration project A modified project delivery method was applied utilizing “Design Assist” by the following contracting specialties Mechanical, Electrical, Structural, Concrete Design assist contracts established with Guaranteed Maximum Pricing (GMP) Construction Coordination Model in Navisworks with Construction Manager as lead Included all equipment, steel and pipe and conduits (>=2 inch diameter) Resolved all interferences Produced shop fabrication drawings Facilities Operation and Development

7 Design and Project Delivery (cont.) Distribution Tunnel to new Tower and 5 existing buildings, Cast in place concrete 10’ x12’ 42” to 36” welded steel chilled water supply and return pipe 12” inch seamless steam pipe 6” 316L stainless steel condensate pipe Valve vaults and provision for future building connections Chilled Water Distribution Direct buried HDPE Transition from HDPE to welded steel in four valve vaults Primary/Secondary Pumping with Plate and Frame Heat Ex. Primary pumps maintain chiller and positive bridge flow Secondary building pumps maintain flows for building temperature control Facilities Operation and Development

8 Project Delivery Method Key Benefits System designed to match pre-purchased chillers Design Assist under GMP provided an effective process for equipment evaluation/selection and value engineering Model review and update meetings insured construction was coordinated and stayed on schedule Modeling eliminated rework of shop fabricated piping due to interferences Common commissioning agent for both Plant and Building Systems Facilities Operation and Development

9 3D BIM Construction Model of #1 Chiller (Navisworks )

10 Installation of chillers on second floor of the plant

11 Inspections Construction Structural steel and concrete UT weld examinations: steam, chiller water and condensate piping Hydrostatic tests A/E as Contract Administration Construction Manager Final Inspections ODIC <=480 volt electrical Building systems Life Safety OSU Utilities (as AHJ) 575V and higher electrical Instrumentation and control wiring Process piping and equipment Facilities Operation and Development

12 Equipment Readiness Mechanical Vendor/Contractor startup support Pipe flushing with system pumps at 7-9 fps, (chiller tube bundles bypassed) Frequent startup strainer cleaning Metal passivation and chemical treatment systems Electrical Vendor/Contractor startup support Phase checks Relay and wiring checkout Controls Field instrument calibration and verification Point to point zero and span check 134 field devices, one time, complete through to the graphical interface Verified wiring, communication and graphical displays for 3500 total points. Facilities Operation and Development

13 Site Acceptance Testing (SAT) and Commissioning Hydraulic flow testing of distribution loop (chiller plant & bldg. pumps) Systematic test and verification of all Control Sequences Condenser Pumps, Cooling Towers, Chiller Water Pumps, Chillers Tested chillers with “warm” loop water prior to building conversions Go live Building chillers kept as backup for two weeks Midnight conversion of first two buildings (8/17/12 and 8/24/12) Initial testing and controls tuning completed by 7:00 AM Reliable Chilled Water/Backup Generators Tested load share with utility Controlled load assumption Full Black Start Test Third building conversion (10/16/12) Facilities Operation and Development

14 Operating Results Med Center reports improved building temperatures and chilled water system reliability Plant operates on full automatic Four daily walkthroughs for equipment checks and water quality testing Towers and chillers stage on and off to satisfy building cooling needs Metrics 0.76 kw/ton (central plant only, range 0.72 to 0.78) 17% (preliminary) net reduction in campus electricity for central chilling 98% of production metered and billed at buildings $3800/ton initial build (with standby generation) $2950/ton final build out (estimated) Some increase in net building utility costs but with improved service levels Facilities Operation and Development

15 Facilities Operation and Development

16 Facilities Operation and Development Questions?

17 Thanks to the Project Team! Facilities Operation and Development