ATLAS ITk - Activities Common Mechanics group (Lukasz Zwalinski, Paolo Petagna, … ) Plant →PP1 DEMO & BABY DEMO 14/03/2016C. Rossi - INFN Genova1 Detector.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
Novel technologies and materials for thermal management
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
CO 2 Cooling for High-Energy Physics Experiments EU-FP7 Project CRISPCooling Method CO 2 Cooling Prototype Systems Dr. Johann M. Heuser* * GSI Helmholtz.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
IBL cooling thermal chock incident 15 October The IBL cooling team.
CO 2 Cooling: Overview over CMS activities Jennifer Merz RWTH Aachen University, 1. Physikalisches Institut B May CEC General Meeting, Karlsruhe.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
UT cooling discussion 3 december 2014
PRESENTATION OF CFD ACTIVITIES IN CV GROUP Daniel Gasser.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO Łukasz Zwaliński PH-DT-PO 1 J.Godlewski,
a magnetic refrigeration stage
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
60kW Thermosiphon control system
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
EP-DT roadmap towards CO 2 cooling of "phase-2" detectors Paolo Petagna (CERN PH-DT)
Pierre Barroca ITK LAPP – Goals 2.Simulation 3.Prototype measurements 4.Setup 5.Results 6.Conclusions 1.Goals 2.Simulation 3.Prototype measurements.
A two-stage system for the future cooling system.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Use of Air Showers to Reduce Soaking Time for High Precision Dimensional Measurements Ted Doiron, Donna McLaughlin, Ann Schneider Engineering Metrology.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
Stave thermal analysis Cooling connections CO2 warm Test
OCEAN THERMAL ENERGY CONVERSION (OTEC)
Master Thesis Presentation – Bart Festen
Feedback on transfer line sizing and flow calculations for UT
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
ATLAS ITk Baby-DEMO update
Technology progress and R&D on detector cooling
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
Detector Cooling Project WP2 CO2 activities status report
Micro-channel Cooling
Kröhnke, 14 November 2012 FCAL Collaboration Meeting Sergej Schuwalow
Forum on Tracking Detector Mechanics - Bonn, May 2016
M. Battistin CERN EN/CV/DC 9th July 2009
update on UT cooling system
IBL activities ATLAS Meeting Milano, 14 May 2012 S. Coelli,
Pixel CO2 Cooling Status
CO2 cooling requirements for the IBL
VLT Meeting, Washington DC, August 25, 2005
Cryomodules Challenges for PERLE
CF testing pipe & testing plan
Experimental Program and Endstations System (WBS ) J
The Baby-DEMO small scale low temperature CO2
Presentation transcript:

ATLAS ITk - Activities Common Mechanics group (Lukasz Zwalinski, Paolo Petagna, … ) Plant →PP1 DEMO & BABY DEMO 14/03/2016C. Rossi - INFN Genova1 Detector group (Danilo Giugni,…) PP1 → Detector 8 Pump Staves Transfer line 5 6 PP2 PP1 Plant in USA15 Chiller 7 A.ATLAS ITk cooling system B.Pixel detector activities Splitting Box

ATLAS ITk – Cooling system Prototype plant built to demonstrate operation of a single CO2 plant (15kW) + redundancy approach operation suitable for ATLAS and CMS. (end of 2019) DEMO ATLAS Pixel needs to know the min achievable cooling temperature Input needed for the ATLAS ITk Pixel Technical Design Report (end of 2017). BABY-DEMO One PP2 loop + corresponding CO2 Plant (≈ 1.5kW) 14/03/2016C. Rossi - INFN Genova2

For both the common mechanics and detector group → main challenges for the distribution design are concentrated in PP2 to PP1 distribution lines and the detector evaporator loop Cold temperature ability of the detector evaporator loops depends on: -low-temperature capability of the plant -pressure gradients from detector to plant BD1: design, construction, operation of small cooling plant (Krakow CUT) BD2: design, construction, R&D of full scale PP2 distribution line (Institutes & CERN) BD1 & BD2 will be coupled and tested to demonstrate the full system loop performance in realistic conditions with a representative prototype detector loop at CERN 14/03/2016C. Rossi - INFN Genova3 Part of the cooling R&D activity the a can be done by a collaboration of INFN institutes but the qualification tests must be CERN ATLAS ITk – cooling

ATLAS ITk - Activities Common Mechanics group (Lukasz Zwalinski, Paolo Petagna, … ) Plant and distribution up to PP1 DEMO & BABY DEMO 14/03/2016C. Rossi - INFN Genova4 Detector group (Danilo Giugni,…) Distribution from PP1 to detector A.ATLAS ITk cooling system B.Pixel detector activities

ATLAS ITk – Pixel detector activities 14/03/2016C. Rossi - INFN Genova5 1.Studies on the global thermal efficiency of the pixel local supports → This activity will be done at CERN in SR1 2.Thermal testing for material characterization of the materials used for the different pixel designs (complementary to SR1 tests). The thermal conductivity measurements are strongly influenced by thermal radiation and conduction through air for high conductivity materials (e.g. TPG, Carbon Foam, …) → qualification in a measuring chamber (≈1 m 3 ) with multi-layer super insulator radiation shield + vacuum pressure < mbar. Results: -drive the design/optimization process -input for numerical simulations. The tests should be independently repeated. 3.Other activities, … Different activities can be done also for the Pixel detector group

14/03/2016C. Rossi - INFN Genova ATLAS ITk – INFN – Sezione di Genova 6 ATLAS Genova lab: Dynamic climate chamber BINDER MK53 T range (-40÷180)°C T uniformity (0.4÷2)°C, depending on set point T fluctuation (0.1÷0.5)°C, depending on set point Chiller LAUDA RK 20 KS T range (-40÷150)°C T accuracy 0.1°C Bath volume (11÷18)L Cooling capacity at 20°C 0.8 kW Chiller LAUDA Proline RP 855 T range (-55÷200)°C T accuracy 0.01°C Bath volume (5.5÷8)L Cooling power at 20°C 1.6 kW Thermal Imaging Camera FLIR SC 620 Accuracy ±2°C or ±2% of reading Thermal sensitivity 40 mK at 30°C T range (-40÷500)°C Coordinate Measuring Machine DEA Mistral Axis lengths [mm]: X=660 Y=710 Z=460 Accuracy: L/1000 (ISO 10360) (Calibration showed an average accuracy ±4.5 µm) Probe Model (head): PH10M PLC Siemens S7-300

14/03/2016C. Rossi - INFN Genova ATLAS ITk – INFN – Sezione di Genova 7 INFN – Genova resources: C. Rossi, Engineer G. Gariano, Technician A. Rovani, Technician Support of the mechanical design office Support of the mechanical workshop INFN – Genova is interested in: -Study design and prototyping of the splitting box (PP1 – PP2, PP2 – Detector) or -Measuring chamber and thermal qualification of the pixel mechanical components To be discussed at the ATLAS ITk cooling meeting 15 – 16 March Where the sharing of responsabilities for the BABY-DEMO will be defined