Energy consumption and savings potential of CLIC Philippe Lebrun CERN, Geneva, Switzerland 55th ICFA Advanced Beam Dynamics Workshop on High Luminosity.

Slides:



Advertisements
Similar presentations
Report on Accelerator Plenary Session “Power Consumption” Chris Adolphsen & Philippe Lebrun LCWS 12 University of Texas at Arlington, USA 22 – 26 October.
Advertisements

ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
A. Bay Beijing October Accelerators We want to study submicroscopic structure of particles. Spatial resolution of a probe ~de Broglie wavelength.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EnEfficient – a networking.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
CLIC power consumption B. Jeanneret CLIC Project meeting, Oct 2011 Clic Power, BJ, proj meet oct
CLIC Staged Design October 2012 D. Schulte for the CLIC collaboration.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Erica Lindström Report on Sessions B1 and B2. Boosting accelerator electrical efficiency at the ESFR Presented by Mr. Jean François Bouteille The new.
Drive beam magnets powering strategy Serge Pittet, Daniel Siemaszko CERN, Electronic Power Converter Group (TE-EPC) OUTLINE : Suggestion of.
Future Accelerators at the High Energy Frontier
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
Compact & Low Consumption Magnet Design Workshop for Future Linear and Circular Colliders Geneva, November 26-28, 2014 Saving opportunities in accelerator.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
1 Tunnel implementations (laser straight) Central Injector complex.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
Luminosity expectations for the first years of CLIC operation CTC MJ.
Status of the Rebaselining D. Schulte for the Rebaselining Team D. Schulte, CLIC Rebaselining, October 2013.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
Cost Model including Civil Engineering and Conventional Facilities Hans-H. Braun, CLIC ACE, June 20, 2007  Cost model goals  Methodology  Scaling assumptions.
CLIC cost & power consumption issues Philippe Lebrun on behalf of the C&S WG CLIC Meeting 11 December 2009.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
1 Physics Input for the CLIC Re-baselining D. Schulte for the CLIC collaboration.
CLIC cost drivers Philippe Lebrun on behalf of the C&S WG CLIC Technical Committee 3 November 2009.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
CLIC Energy Stages Meeting D. Schulte1 D. Schulte for the CLIC team.
ParameterL-bandS-bandX-band Length (m) Aperture 2a (mm) Gradient (Unloaded/Loaded) (MV/m)17/1328/2250/40 Power/structure (MW) Beam.
Modulators for DB klystrons: requirements and plans for developments Serge Pittet, David Nisbet TE EPC.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
How CLIC-Zero can become less expensive A.Grudiev, D. Schulte 16/06/09.
Paths to CLIC power and energy efficiency Philippe Lebrun CLIC Workshop 2014 CERN, 3-7 February 2014 EnEfficient.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
Risto Nousiainen, CLIC workshop ” Technical Issues, Integration & Cost ” working group Progress on Study of Module Cooling Risto Nousiainen.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
CLIC Re-baselining CSC, October Possible CLIC stages studied 2.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Parameters and the Costs of CLIC H.H. Braun, CLIC Parameter Away Day,
CLIC Civil Engineering & Infrastructure Working Group Meeting
1st FCC Infrastructure & Operation meeting
ILC - Upgrades Nick Walker – 100th meeting
CLIC Rebaselining at 380 GeV and Staging Considerations
CLIC Klystron-based Design
Linac possibilities for a Super-B
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
COOLING & VENTILATION INFRASTRUCTURE
Future Collider Projects at CERN
Why are particle accelerators so inefficient?
LCWS 2017 – 26th October C. Rossi
Session Ic “Energy efficiency/recovery/optimization”
CLIC Drive Beam Klystron Modulators
Measurements, ideas, curiosities
Status of the CLIC Injector studies
LHC (SSC) Byung Yunn CASA.
Explanation of the Basic Principles and Goals
Barry Barish Paris ICHEP 24-July-10
CLIC Feasibility Demonstration at CTF3
Power Consideration of CEPC
JLEIC Reaching 140 GeV CM Energy: Concept and Luminosity Estimate
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Energy consumption and savings potential of CLIC Philippe Lebrun CERN, Geneva, Switzerland 55th ICFA Advanced Beam Dynamics Workshop on High Luminosity Circular e + e - Colliders – Higgs Factory Beijing, 9-12 October 2014

CLIC linear e + e - collider study Ph. Lebrun2

CLIC complex schematic Ph. Lebrun3

Energy, luminosity and power consumption of linear colliders Grid power Beam energy Grid-to-beam efficiency Vertical beta at collision Vertical emittance Bunch length Ph. Lebrun4 CLIC

Electricity price projections European Commission, Directorate-General for Energy EU energy trends to 2030, Reference Scenario 2010 CERN average Ph. LebrunHF 2014 Beijing5

CLIC CDR parameters for Scenario A « optimized for luminosity at 500 GeV » Ph. LebrunHF 2014 Beijing6

CLIC CDR parameters for Scenario B « lower entry cost » Ph. LebrunHF 2014 Beijing7

CLIC power flow Ph. LebrunHF 2014 Beijing8 Power flow for the main RF system of CLIC at 3 TeV Overall power flow for CLIC at 3 TeV

CLIC power consumption by WBS domain 500 GeV A Total 272 MW 1.5 TeV Total 364 MW 3 TeV Total 589 MW Power consumption of ancillary systems ventilated pro rata of and included in numbers by WBS domain RF: drive beam linac, FMT: frequency multiplication & transport, So: sources & acceleration up to 2.5 GeV, DR: damping rings, Tr: booster linac up to 9 GeV & transport, ML: main linacs, BDS: beam delivery system, main dump & experimental area Ph. LebrunHF 2014 Beijing9

CLIC power consumption by technical system 500 GeV A Total 272 MW 1.5 TeV Total 364 MW 3 TeV Total 589 MW CV: cooling & ventilation, NW: electrical network losses, BIC: beam instrumentation & control Ph. LebrunHF 2014 Beijing10

CLIC CDR Integrated luminosity/Collision energy scenarios Ph. LebrunHF 2014 Beijing11

From power to energy CLIC CDR assumptions For each value of CM energy -177 days/year of beam time -188 days/year of scheduled and fault stops - First year -59 days of injector and one-by-one sector commissioning -59 days of main linac commissioning, one linac at a time -59 days of luminosity operation -All along : 50% of downtime -Second year -88 days with one linac at a time and 30 % of downtime -88 days without downtime -Third year -Still only one e+ target at 0.5 TeV, like for years 1 & 2 -Nominal at 1.5 and 3 TeV -Power during stops: scheduled (shutdown), unscheduled (fault), downtime Ph. LebrunHF 2014 Beijing12

CLIC CDR Yearly energy consumption Integral over the whole programme –Scenario A : 25.6 TWh –Scenario B : 25.3 TWh Ph. LebrunHF 2014 Beijing13

sobriety efficiency energy management waste heat recovery The four pillars of energy economy Ph. LebrunHF 2014 Beijing14

Paths to power & energy savings Sobriety Reduced current density in normal-conducting magnets –Magnets & overheads (electrical network losses, cooling & ventilation) represent 27 % of overall power at 3 TeV –For given magnet size and field, power scales with current density –Compromise between capital & real estate costs on one hand, and operation costs on the other hand Reduction of ventilation duty –Most heat loads already taken by water cooling –Possible further reduction in main tunnel by thermal shielding of cables –Possible reduction in surface buildings by improved thermal insulation, natural ventilation, relaxation of temperature limits Ph. LebrunHF 2014 Beijing15

Paths to power & energy savings Efficiency Grid-to-RF power conversion –R&D on klystrons –R&D on modulators, powering from the grid at HV RF-to-beam power conversion –Re-optimization of accelerating structures and gradient Permanent or super-ferric superconducting magnets –Permanent magnets distributed uses, e.g. main linac DB quads fixed-field/gradient or mechanical tuning –Super-ferric superconducting magnets « grouped » and DC uses, e.g. combiner rings, DB return loops in main linacs Total potential for further power savings at 3 TeV - RF already taken at high efficiency - magnets ~ 86 MW - cooling & ventilation ~24 MW Total potential for further power savings at 3 TeV - RF already taken at high efficiency - magnets ~ 86 MW - cooling & ventilation ~24 MW Ph. LebrunHF 2014 Beijing16

Development of high-efficiency modulators Useful flat-top Energy22MW*140 μ s = 3.08kJ Rise/fall time energy 22MW*5μs*2/3= 0.07kJ Set-up time energy22MW*5μs = 0.09kJ Pulse efficiency0.95 Pulse forming system efficiency 0.98 Charger efficiency 0.96 Power efficiency 0.94 Overall Modulator efficiency 89% D. Nisbet & D. Aguglia Ph. LebrunHF 2014 Beijing17

Main linac DB quadrupoles Conventional electromagnetTunable permanent magnet M. Modena, B. Shepherd Ph. LebrunHF 2014 Beijing18

Paths to power & energy savings Energy management Low-power configurations in case of beam interruption Modulation of scheduled operation to match electricity demand –Seasonal load shedding –Diurnal peak shaving Ph. LebrunHF 2014 Beijing19

Variations of electricity demand in France (source: RTE) Annual variations of power consumption (integrated weekly) Diurnal variations of power consumption (winter day) Ph. LebrunHF 2014 Beijing20

Paths to power & energy savings Waste heat recovery Possibilities of heat rejection at higher temperature, e.g. beam dumps Valorization of low-grade waste heat for concomitant needs, e.g. residential heating or absorption cooling Three-bed, two evaporator adsorption chiller (Wroclaw Technology Park) Ph. LebrunHF 2014 Beijing21

Is waste heat worth recovering? Consider heat rejection Q at temperature T with environment at T 0 What are the recovery options? 1)use as such o Is there a concomitant need for heat Q at T=T use ? 2)use as heat at higher temperature T use >T o Minimum work required for heat pump W min = Q (T use /T – 1) o Example: for raising waste heat from 40 °C to 80 °C, W min = 0.13 Q o In practice, W real may be 2 to 3 times higher o May still be an interesting option 3)use to produce work o Maximum work produced (Carnot machine) W max = Q (1 – T 0 /T) o This can also be written W max = Q – T 0  S = Exergy o Example: with T = 40 °C and T 0 = 15 °C, W max = 0.08 Q o In practice, W real is only a fraction of this o Very inefficient unless one operates at higher T  Investigate all options, using both energy and exergy as f.o.m. Ph. LebrunHF 2014 Beijing22

Energy & exergy in CLIC magnet systems T cooling water = 40 °C 100 drawn from network produces only 82.9 used in magnet Waste heat in water contains 84.3% of consumed energy, but only 6.7% of consumed exergy: waste heat recovery is therefore interesting for final use as heat, not as source of electrical/mechanical energy Exergy economy should target improvement of electrical efficiency upstream the magnets, rather than waste heat recovery Ph. LebrunHF 2014 Beijing23

Energy & exergy in CLIC magnet systems T cooling water = 60 °C Increasing cooling water temperature to 60 °C raises its exergy content to 11.4% Ph. LebrunHF 2014 Beijing24

Energy & exergy in CLIC RF systems T cooling water = 40 °C 100 drawn from network produces only 53.8 in PETS, 43.7 in AS, of which 10.9 goes into the main beam Waste heat in water contains 92.6% of consumed energy, but only 7.4% of consumed exergy: waste heat should rather be valorized as heat Exergy economy should target improvement of electrical efficiency upstream the magnets, rather than waste heat recovery Ph. LebrunHF 2014 Beijing25

Energy & exergy in CLIC RF systems T cooling water = 40 °C & 80 °C (klystrons & b. dumps) Increasing klystron and beam dump cooling water temperature to 80 °C raises its exergy content to 8.4%, i.e. 12.1% in total (water1 and water2) Ph. LebrunHF 2014 Beijing26

Conclusions Power consumption of CLIC and other large accelerator projects at the energy frontier has become a major issue in their technical feasibility, economic affordability and social acceptance Power and energy savings are therefore essential aspects of the study of such machines from the conceptual design phase Paths towards this goal must combine sobriety, efficiency, optimal energy management and waste heat recovery and valorisation Exergy content of CLIC waste heat remains low at acceptable recovery temperatures –Conversion to mechanical work is inefficient –Use for heating/cooling may be economical, provided one finds concomitant needs Ph. LebrunHF 2014 Beijing27