CMTF Infrastructure Jerry Leibfritz PIP-II Machine Advisory Committee 9-11 March 2015.

Slides:



Advertisements
Similar presentations
SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011.
Advertisements

Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
SRF Beam Test Facility at NML Jerry Leibfritz April 26, 2010.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Current status Arkadiy Klebaner November 21, 2012
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
E. Doyle 7/20/06 rev 9/13/06 1 / 16RF Coupler Assembly Facility SLAC TTF3 Coupler Assembly Facility Specifications Based on TESLA facility built at LAL,
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
Installation of the T600 at Fermilab CSN2, September 22,
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
PX FY14 Budget PXIE Infrastructure R. Stanek J. Leibfritz.
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
LCLS-II Cryoplant Overview
Installation plans for RFQ and Superconducting linac Dave McGinnis Chief Engineer Eugene Tanke Systems Engineer March 20,
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
PXIE Layout and Infrastructure Building, Cryogenics, Utilities… Rich Stanek On behalf of the CMTF Team PXIE Collaboration Meeting November 28, 2012.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
HTS-2 – FY17 Budget Request Joe Ozelis, Sr. Eng. Physicist PIP-II Budget Retreat 26 April, 2016.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
This talk is not a summary of costs for conventional facilities This talk is Review of conventional facilities used by CDF Discussion of status of systems.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
Facility Layout and Infrastructure Requirements Rich Stanek (on behalf of CMTF facility team) PXIE Program Review January 16-17, 2013.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Integration of HWR, SSR1, and Cryo in the PXIE enclosure Curt Baffes PIP-II Collaboration Meeting 09 November 2015.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Cryoplant Controls Installation
RF Systems and Controls for the LERF CM Tests
Cryomodule test stand at ESS site
CBETA Technical Review
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
FRIB Cryogenic Support
1.3-GHz Cavity Vacuum Furnace at IB4
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
UITF – Upgrade Injector Test Facility
Accelerator Module Test Facility
IHEP Cryomodule Status
Overarching Commissioning Plan
Operator Training Requirements
SNS Cryoplant Commissioning Past Experiences
CryoPlant Commissioning
Presentation transcript:

CMTF Infrastructure Jerry Leibfritz PIP-II Machine Advisory Committee 9-11 March 2015

Outline CMTF Building PXIE Infrastructure PXIE Cave Electrical/Power Distribution Utilities –Cooling Water & Compressed Air Cryoplant Support Systems –Controls & Safety Systems –Control Room and Cleanroom Schedule 3/9/2015J. Leibfritz | P2MAC_20152

Cryomodule Test Facility (CMTF) CMTF is a new (2012) set of buildings (adjacent to NML) originally designed to house a helium cryoplant and two cryomodule test stands J. Leibfritz | P2MAC_2015 CMTF NML 3/9/20153 Empty High Bay Exterior of CMTF

SRF Accelerator Test Facility Complex (NML and CMTF) Cryomodule Test Facility (CMTF) Compressor Building Cryomodule Test Stand (CMTS1) PXIE Accelerator Cleanroom Cryogenic Cold Boxes NML Test Facility IOTA Ring ASTA Test Accelerator 3/9/2015J. Leibfritz | P2MAC_20154

PXIE - Infrastructure Cryoplant PXIE Cave Cleanroom Control Rm./Offices Racks on Mezzanine (above office area) RF and Controls LCW/Air 3/9/2015J. Leibfritz | P2MAC_20155

PXIE Cave Cave –Constructed of concrete shield blocks –Special penetration blocks for cables, water, and RF –Walls and penetration blocks of half of cave (IS, LEBT, RFQ, MEBT) assembled –Preliminary Shielding Analysis approved Alignment –Alignment network established within building and cave –Deep Rod Monuments to monitor movement of building will be installed in /9/2015J. Leibfritz | P2MAC_20156

Cave Pictures J. Leibfritz | P2MAC_20157 PXIE Cave 3/9/2015 PXIE Cave PXIE and CMTS CavesPXIE Cave PXIE IS and LEBT

Electrical/Power Distribution Electrical Power –(4) 1800 kVA transformers feed the CMTF building –PXIE racks, tray, and power distribution in place 3/9/2015J. Leibfritz | P2MAC_20158 Racks on Mezz. Racks & Tray RF for RFQ

Cooling Water & Compressed Air Systems PXIE Water Cooling –Ion Source chiller and manifolds installed and operating –Temporary LCW skid and piping to RFQ RF system installed –LEBT manifolds installed and piped to temporary LCW skid –RFQ sub-chillers being procured Low Conductivity Water (LCW) System –1000 GPM, 100 PSIG, 83F +/- 1F, 1200 kW cooling capacity –Currently being installed to support all of CMTF –Plan is to have system complete and operational in Spring 2015 (to coincide with RFQ delivery) Compressed Air System –95 CFM (160 CFM Max.), 100 PSIG, 40°F dew point –Compressed air system installed and operational throughout CMTF 3/9/2015J. Leibfritz | P2MAC_20159

Water/Air Layout Installed (water) In-Progress (water) Installed (air) Air LCW Pumps Chiller LCW Piping Temporary Chiller Piping from NML Temporary LCW Skid & I.S. Chiller 3/9/2015J. Leibfritz | P2MAC_201510

Water/Air Status 3/9/2015J. Leibfritz | P2MAC_ Ton LCW Chiller(s) on-site Awaiting thaw to pour concrete support pad Pump and piping installation is approximately 50% complete Temp. LCW Skid & IS ChillerLEBT Manifolds & LCW Chiller LCW and Air System

CMTF Cryoplant Helium Cryoplants in CMTF (nominal capacities) –New Superfluid Refrigerator (40K, 4.5K, 2K, using cold compressors) ~ 1.8K or 2K –Repurposed SLAC CTI-4000 Refrigerator – (liquefier using turbine expanders) ~ 4.5K Cryoplant provides independent operation of PXIE and CMTS Compressor RoomCryoplantCryo Pit 3/9/2015J. Leibfritz | P2MAC_201512

Cryoplant Status Status –Cryoplant was fully commissioned (2014) –Distribution piping from Cryoplant to Distribution Box due in March –Conceptual design for piping from Distribution Box to PXIE exists (cave to be modified Spring 2015) –Final design and procurement of cryo distribution piping in FY16 –Installation and commissioning of PXIE system in FY17 (HWR) 3/9/2015J. Leibfritz | P2MAC_ Distribution Box Cryo Piping in Cave Distribution into Cave Cryo Distribution

Controls & Safety Systems Cryogenic Control System –Siemens S7-400 with ET200 remote IO’s –Feeds into CMTF facility control system CMTF Master Control System –ACNET, real time data acquisition –Database, data logging, sequencer, alarms, save/restore, synoptic display –Linux, VxWorks, Java, Labview, EPICS support Interlocks and Controlled Access – FY16 –Same as NML and CMTS (standard at Fermilab) Oxygen Deficiency (ODH) – FY17 –Monitors, alarms, ODH ventilation, etc. needs to be designed for cave –Will be modeled after NML & CMTS (standard at Fermilab) J. Leibfritz | P2MAC_20153/9/201514

Control Room Control Room/Office Area –Control room is fully operational –Mobile control consoles in high-bay –5 offices, meeting area, kitchen, bathrooms, shower 3/9/2015J. Leibfritz | P2MAC_201515

Cleanroom –Class 10, 100, and 10,000 areas –External preparation area (ultrasonic tanks, rinse sinks, parts washer, ultra-pure DI water system, clean Nitrogen system) –Certification and ODH approval received (January, 2014) Preparation Area Inside Cleanroom Cleanroom Nitrogen Dewar 3/9/2015J. Leibfritz | P2MAC_201516

Infrastructure Schedule/Scope FY15 –Install infrastructure to test RFQ RF stations –Install and commission LCW system –Prepare for RFQ installation and commissioning FY16 –Design and procure cryo distribution piping FY17 –Install cryo piping –Extend cave –Install and commission HWR & SSR1 FY18 –Install HEBT, beam dump, and RAW cooling system –Test HWR and SSR1 with beam 3/9/2015J. Leibfritz | P2MAC_201517

Thank You! J. Leibfritz | P2MAC_20153/9/201518