Brittany Giel University of Florida Ph.D. Candidate Center for Advanced Construction Information Modeling January 8, 2013 Measuring Success - Metrics.

Slides:



Advertisements
Similar presentations
. Chapter 5 Auditing and mapping equity and diversity Erica French and Lyn Simpson Copyright 2010 McGraw-Hill Australia Pty Ltd PPTs to accompany Strachan,
Advertisements

. . . a step-by-step guide to world-class internal auditing
TWS Aid for Supervisors & Mentor Teachers Background on the TWS.
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
Course: e-Governance Project Lifecycle Day 1
Asia’s Best in Powerpoint Presentation D I A M O N D A W A R D First Place.
Gaining a Competitive Advantage
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
1 THE OFFICE 2 OFFICE PROJECT COLLABORATION SYSTEM.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
A Presentation for the Enterprise Architect © 2008 IBM Corporation IBM Technology Day - SOA SOA Governance Miroslav Petrek IT Software Architect
Proposed Way Forward for SERC EM Task Barry Boehm, USC-CSSE 30 January 2009.
Accreditation Strategy for the BYU CE En Dept. Presentation to External Review Board October 20, 2000.
ACCREDITATION SITE VISITS.  DIVISION 010 – SITE VISIT PROCESS  DIVISION 017 – UNIT STANDARDS  DIVISION 065 – CONTENT STANDARDS.
Combining Perceptions and Prescriptions in Requirements Engineering Process Assessment Presented By: Hector M Lugo-Cordero, MS EEL
The BIM Project Execution Planning Procedure
Process: A Generic View
The Importance of the Qualifications Based Selection (QBS) Process
Student Learning Objectives 1 Implementing High Quality Student Learning Objectives: The Promise and the Challenge Maryland Association of Secondary School.
© Loyalist Certification Services, 2009 Certified Process Design Engineer (CPDE) ®
The Evergreen, Background, Methodology and IT Service Management Model
Integrated Capability Maturity Model (CMMI)
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
Thirteenth Lecture Hour 8:30 – 9:20 am, Sunday, September 16 Software Management Disciplines Process Automation (from Part III, Chapter 12 of Royce’ book)
1 “ Understanding leads to perfection” Author: Herb Isenberg Ph.D A Bird’s Eye View Quality Foundations January 2011.
Lori Smith Vice President Business Intelligence Universal Technical Institute Chosen by Industry. Ready to Work.™
Finnish ICT Barometer 2007Copyright © VTT BIM - Experience in Finland Reykjavik Heikki Kukko.
The Guide to the Software Engineering Body of Knowledge
TOPIC-9- PROJECT ORGANIZATION
Using Electronic Portfolios to Assess Learning at IUPUI. Trudy Banta, et. al. Indiana University-Purdue University Indianapolis 2007.
Part IV: Organizing to Perform Systems Engineering Art, Alice, Heidi, Richard, Hillary, James, Garry, Ken.
1 Energy Efficiency & Utilities Sector March 2014 CALIFORNIA COMMUNITY COLLEGES CHANCELLOR’S OFFICE.
March 26-28, 2013 SINGAPORE CDIO Asian Regional Meeting and Workshop on Engineering Education and Policies for Regional Leaders Programme Evaluation (CDIO.
BSBPMG405A Apply Human Resource Management Approaches Apply Human Resource Management Approaches Unit Guide C ertificate IV in Project Management
Quality Activity Matrix Presented by Sandra Toalston President, SanSeek 1.
University of Sunderland CIFM03Lecture 2 1 Quality Management of IT CIFM03 Lecture 2.
October 6, 2007 Atlanta, Georgia USA. Agenda Welcome Remarks Greg Balestrero Case Study: Siemens Corporation Facilitated Discussion Groups Share and discuss.
Resources. Behavioral Health providers are being challenged to adopt health information technology with very limited resources. There is a need to prepare.
The Value Driven Approach
Faculty Perceptions of Readiness to Teach Online.
1 Managed Network for BIM modeling and collaboration Managed data center Model hosting Private secure network Attacking a problem in the.
CSI—The Lifecycle Stage
Assessment Validation. MORE THAN YOU IMAGINE ASQA (Australian Skills Quality Authority) New National Regulator ASQA as of 1 July, 2011.
Chapter 8 - Integrative Process
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
© 2015 IBM Corporation IBM and IBM Business Partner Use Only Business Partner Technical Vitality Overview January, 2015 Send an to
BIMILACI 2007 Best Practice Procurement of Engineering Services Washington, D.C. May , 2007 Gregs Thomopulos, P.E., FACEC Executive Committee Member,
1 3:00 PM, EST. 2 Don Hewitt Vice President, Business Operations OSEHRA Ramina Toy Program Manager Brad Triebwasser.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Talent Acquisition, Staffing, Recruitment, Executive Search.
Internal Audit Quality Assessment Guide
CMMI Certification - By Global Certification Consultancy.
EGrove Systems Professional Web Development Services
Quality Online Preparation: Qualities of Faculty, Courses, and Preparation Programs By Dr. Erin O’Brien Valencia College League of Innovation Conference,
Creating or Enhancing Skills-Based Training Programs:
Professional Review Process for Heads / Principals
Data Architecture World Class Operations - Impact Workshop.
BANKING INFORMATION SYSTEMS
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
Identify the Risk of Not Doing BA
Accreditation Canada Medicine Accreditation 2016.
Creating or Enhancing Skills-Based Training Programs:
Modernization Maturity Model and Roadmap
Quality management standards
National Institute of Building Technology is the first institute that creates awareness comprehensively in the field of construction and project management.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Define Your IT Strategy
PSG COLLEGE OF NURSING.
Project Management Method and PMI ® PMBOK ® Roles
Presentation transcript:

Brittany Giel University of Florida Ph.D. Candidate Center for Advanced Construction Information Modeling January 8, 2013 Measuring Success - Metrics

 As the benefits of BIM are widely marketed and adoption increases, many construction owners are now mandating that it be utilized on new construction projects.  However, the change in traditional processes associated with implementation may be very new to them.  As a result: o They are often unsure of what deliverables and processes to require o They lack the technical capabilities to operationalize BIM during O&M 2

Source: McGraw Hill Construction 2009 Source: Bercerik-Gerber et al Perceptions2010 Perceptions BIM Use in Different Life Cycle StagesPerceived Value of BIM by Phase 3

 Assess the level of BIM readiness among US building owner organizations.  Identify what critical factors must be measured in the evaluation of building owners’ BIM competency.  Determine the perceived importance of those factors by leading experts in the research domain.  Develop a framework for assisting owner organizations in evaluating their BIM competency. 4

6 Project Evaluation Models CIFE’s BIM Scorecard NBIMs’ ICMM Organization Evaluation Models IU’s BIM Proficiency Matrix CIC Research Program’s Owner Matrix Product Driven Vico’s BIM Score TNO’s BIM QuickScan Process Driven Succar’s BIMMI Incorporate Building Owner needs and requirements Specifically

7 BIM ICMM (NIBS 2007) BIMMI (Succar 2009) BIM proficiency matrix (IU 2009) BIM QuickScan (Van Berlo et al. 2010) BIM Scorecard (CIFE 2011) Owner Maturity Matrix (CIC 2012) Rating Context Rates the building project Rates organizations, teams, individuals, etc. Rates designers & contractors’ ability to perform BIM services Rates BIM performance of organizations who are executing BIM Rates VDC practices on a project Rates owners’ maturity of BIM planning strategies Evaluation Style Designed for self- evaluation but validated using external reviewers 4 different types of evaluations possible based on granularity level Stakeholder fills out the matrix, owner scores them based on responses QuickScan -uses external accredited evaluator or Self-scan - web assessment tool Offered in an Express, Lite and Full version-all use an excel template Designed for self- evaluation Measurement Categories and Weightings Measures information management using 11 areas of interest weighted on importance Measures process, technology and policy using 12 Key Maturity Areas (KMAs) weighted equally Measures 8 areas of interest related to owner’s wants from designers and contractors that are all weighted equally Measures BIM performance across 4 chapters and 10 different aspects based on weighted KPIs Measures 4 areas across 10 different dimensions weighted based on perceived importance Measures strategy, BIM Use, Process, Information, Infrastructure, Personnel in 16 planning elements that are weighted equally Number of Maturity Levels 10 maturity levels5 maturity levels4 maturity areasNo maturity levels based on weighted KPIS 5 Percentile Ranges of increased Innovation 6 maturity levels similar to SEI’s CMMI Criteria Used for Evaluation Project documentation and model External audit of project documentation/ Interviews with BIM personnel Stakeholders’ explanation in an excel template Roughly 50 questions conducted through interview of key BIM personnel or an online questionnaire Uses excel-based interview sheets but moving to web-based server in v7 (full version includes audit by CIFE) Internal assessment by key personnel within the organization COMPARE

9 Representatives from building owner organizations with BIM experience are encouraged to participate:  Participants must be employed by an owner organization that has required BIM for a period of three years or more. o They must have direct experience working with BIM deliverables and requirements. o They must currently be operationalizing BIM for FM. o A BIM manager within the organization is preferred.

10 Design and Construction professionals with significant BIM experience are invited to participate:  At least 5 years BIM management experience working for a Architecture, General Contractor, Engineering or specialty contracting firm is required: o Must have worked on at least 5 projects in which BIM deliverables were exchanged at critical life-cycle phases. o Must have experience working with owners who require BIM deliverables in addition to their own organizational BIM experience.

11 Representatives from Academia are also invited to participate:  Participants must have previous expertise in this research domain i.e. applications related to BIM maturity evaluation and/or FM integration of BIM.  They must also meet at least four of the following requirements: o Be a primary or secondary author of at least 3 peer-reviewed journal articles o Be a member or chair of the Building Smart Alliance o Have at least five years of professional experience in an area of the AECO industry o Be a faculty member of an accredited institution of higher learning o Hold advanced degrees in the areas of Architecture, Construction, Engineering, Management, or Facilities Management o Hold a professional registration such as: Professional Engineer (PE), License Architect (AIA) etc.

Brittany Giel University of Florida