Practical Scheduling – PMICOS in Australia Presented by: Ed Blow (MTC Australasia Pty Ltd) 2 November 2005 PMI-College of Scheduling.

Slides:



Advertisements
Similar presentations
PROFESSIONAL ASSOCIATIONS: WHY PARTICIPATE? Presenter Name Company IIA Chapter/Institute.
Advertisements

E.g Act as a positive role model for innovation Question the status quo Keep the focus of contribution on delivering and improving.
LAPA Strategic Plan - our future direction. Background From humble beginnings LAPA is a huge achievement for those founding members Successful in terms.
April 6, 2011 DRAFT Educator Evaluation Project. Teacher Education and Licensure DRAFT The ultimate goal of all educator evaluation should be… TO IMPROVE.
Public Relations Internships, Placements and Work Experience In partnership with the Public Relations Institute of Australia (South Australia)
Project Mangement Chapter 4 Framework for Project Management.
NCETM AIM - to facilitate, enhance and provide leadership for all aspects of mathematics CPD for teachers in schools (primary and secondary) and colleges.
Successful Graduation Projects
Empowering Staff Through Institute Planning (ESTIP) Executive Workshop Institute Name: XXXXXX Presenter: XXXXXX Date: XXXXXX.
Australian Computer Society Helping Students Launch a Successful Career.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Organizational Project Management Maturity: Roadmap to Success
Introduction to Project Management. What is a Project? “A planned undertaking of related activities to reach an objective that has a beginning and an.
PRESENTED BY: WARREN PONCSAK, EXECUTIVE DIRECTOR ROZ KELSEY, PRINCIPAL PROJECT CONSULTANT.
Emerging Global Trends in Project Management Mal Smith PMP Project Management Institute, Canberra Chapter.
PRESENTED BY TRUST THOMAS EROMOSELE STUDENT NO:
Software Project Management By Assistant Prof. Samana Zehra
International Council on Monuments and Sites
UMT and Microsoft Presenting Tips and Tricks Basics What’s new in Microsoft Project 2010 Brian Feder, MBA, PMP Senior Vice President UMT Consulting Group.
In the Framework of: Financed by: Developed by: DANUBE WATER PROGRAM GRANT NO. 46 DEVELOP A TRAINING COURSE FOR THE PREPARATION OF A STRATEGIC BUSINESS.
ACADEMIC PERFORMANCE AUDIT
PMP® Exam Preparation Course
American College of Healthcare Executives ACHE Update Leadership Knowledge Relationships Marketability.
CDU – School of Information Technology HIT241 Professional Practice… - Slide 1 IT Project Management ACS - Core Body of Knowledge In Australia in November.
IEEE S2ESC Report1 Software And Systems Engineering Standards Committee (S2ESC) Paul R. Croll S2ESC Sponsor Chair June 2004 Report.
Diploma of Project Management Course Outline NSW Course Number Qualification Code BSB51407.
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
2 Overview With active participation from individuals and chapters all over the world, the Information Systems Security Association (ISSA)
International Network of Customs Universities (INCU) San Jose, Costa Rica September WCO PICARD Conference.
Guidance for AONB Partnership Members Welsh Member Training January 26/
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
The Professions and Professional Reliance Objectives Pillars Workshops – March 2009.
Membership Development Plan Presenter Date. TITLE | 2 Overview Background to the plan How the plan was developed The Membership Development Plan How the.
Mission The faculty and staff of Pittman Elementary School are committed to providing every student with adequate time, effective teaching, and a positive.
INTRODUCTION TO PROJECT MANAGEMENT. WHAT IS A PROJECT? “A planned undertaking of related activities to reach an objective that has a beginning and an.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Serving the Public. Regulating the Profession.. A Strategic Plan is not an ends… …but rather a means 2.
QAI Federation Chapters Overview Quality Assurance Institute (QAI)
Office of Special Education: Vision Statements Parent Advisory Council – Specialized Services November 05, 2012 Gina Ross - Elementary Megan McCullough.
PRISON HEALTH IN EUROPE: MISSIONS, ROLES AND RESPONSIBILITIES OF INTERNATIONAL ORGANIZATIONS Strasbourg, France 27 th May 2014.
Patient Information Forum (PiF) Overview.
© 2008 Prentice Hall1-1 Introduction to Project Management Chapter 1 Introduction Information Systems Project Management: A Process and Team Approach,
FLENJ Strategic Planning February 1, 2009 Edison High School.
Looking Ahead: Developing YOUR State Agenda Incorporating the NACM National Agenda into Your State Association Agenda Presentation at BLANK LOCATION DATE.
Project Management Training
Some “take-home” ideas Summer schools, scholarships exist (from various universities, and Redfern Photonics) to give students a taste of a possible career.
Looking Ahead: Incorporating the NACM National Agenda into Your State Association Agenda Developing Your State Agenda.
PMI Evening Event - Preston / Dec 2007 Spotting & catching problem projects before it's too late Neil Johnson Project & Programme Management Capability.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Project Management Institute Southern Maryland Chapter Overview of Our Chapter and Benefits to Becoming a PMISOMD Member April
STRATEGIC PLAN OVERVIEW Prepared By: SOUTHERN MARYLAND CHAPTER STRATEGIC PLANNING COMMITTEE April 2007.
Building a BA Center of Excellence Gain Momentum...Produce Results!
1 International Institute of Business Analysis Vision: The world's leading association for Business Analysis professionals” Mission: To develop and maintain.
Leadership Forum October 14, Vision. 2 Extern al Societal Environme nt Task Environme nt Interna l Structure Culture Resources Missio n Performance.
Community of Practice K Lead Project Team: الالتزامالتحفيز التفكير المؤسسي المرونةالتميزالشراكةالاستقامة.
Fundamentals & Ethics of Information Systems IS 201
Awareness and Outreach Programs
The guiding principles of prudent healthcare
Project Management Institute
The Australian Institute of Building
MUHC Innovation Model.
Building a BA Center of Excellence
Why Accessibility Profession Matters IAAP UK Chapter
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
By Jeff Burklo, Director
The Australian Institute of Building
Opportunity Nottingham in partnership with NCVS
Taking the STANDARDS Seriously
Presentation transcript:

Practical Scheduling – PMICOS in Australia Presented by: Ed Blow (MTC Australasia Pty Ltd) 2 November 2005 PMI-College of Scheduling

2 November 2005 Slide 2 of 12 What is a Schedule? “A schedule, in its simplest form, is a table of times or dates when certain defined events are to take place” Draft Practice Standard for Scheduling – V3.0 August 2, The term “Schedule” can mean: The term “Schedule” can mean: 1. The system that produces project data, such as dates, resource curves tasks etc, or 2. The set of project dates themselves There are five basic types of schedules (all others are derivatives): There are five basic types of schedules (all others are derivatives): 1. Early Start 2. Late Start 3. Baseline 4. Resource-Leveled 5. Target

2 November 2005 Slide 3 of 12 Why Schedule? Reason – To Actively Execute the Work in a Planned way The Work can be a project, with a start & finish, or an ongoing task: The Work can be a project, with a start & finish, or an ongoing task:  Engineering: Construct a Tunnel, Communications System (Project).  IT: Construct an IT network (Project).  Medical: Management of hospital staff, operating Theatres & patients (Ongoing).  Education: Management and coordination of training, training centers & trainees (Ongoing). Planned: Planned:  Plan - A table of defined events and the times and dates when they are to happen.  Systematic – The Critical Path Method is an approach that can drive the plan.  Timely – Use the optimum resources to meet the plan in optimum time. Execute: Execute:  Action - To drive the plan from start to completion.  Manage Risk – As the level of risk increases so does the importance of the plan.  Monitor & Control – Provides confidence to overcome the obstacles.  Actively:  Active – Scheduling is an outcome focused active role not a passive role.

2 November 2005 Slide 4 of 12 PMI COS – The SEI Approach to Best Practice Approach 1: The Scheduling Excellence Initiative (SEI): This is a PMI-COS initiative that will establish best practices and guidelines for the application of scheduling principles in a broad array of industries. The SEI Enhancement series comprises 8 inititiatives: Strategic Business Planning: Planning between inception & commencement of work. Strategic Business Planning: Planning between inception & commencement of work. Schedule Management: Building a schedule to perform the work. Schedule Management: Building a schedule to perform the work. Schedule Impact Analysis: Identifying the generally accepted best practices. Schedule Impact Analysis: Identifying the generally accepted best practices. Software Enrichment: Gathering information from software developers & users to increase the relevance of software. Software Enrichment: Gathering information from software developers & users to increase the relevance of software. Industry Focus: Identifying scheduling methodologies from a wide spectrum of discrete application environments. Industry Focus: Identifying scheduling methodologies from a wide spectrum of discrete application environments. Education & Knowledge: Getting the most from scheduling effort by awareness raising, establishing principles, training and coursework Education & Knowledge: Getting the most from scheduling effort by awareness raising, establishing principles, training and coursework Research & Innovation: Applying scientific rigour to the “art” of scheduling by promoting research and the gathering of empirical data (think-tank) Research & Innovation: Applying scientific rigour to the “art” of scheduling by promoting research and the gathering of empirical data (think-tank) Oversight & Integration: Quality control of SEI products Oversight & Integration: Quality control of SEI products

2 November 2005 Slide 5 of 12 PMI – Scheduling Standards – The new Practice Standard for Scheduling Approach 2: The draft PMI Practice Standard for Scheduling has been prepared by PMI to complement the PMBOK Guide. It defines a schedule and project schedule model and provides best practice for sound and effective project scheduling. It is applicable to “most projects most of the time”. It is targeted at the practitioner. The Practice Standard for Scheduling (Draft v3.0) comprises: Introduction: An overview of best practice and a maturity model. Introduction: An overview of best practice and a maturity model. Scheduling Model Components: Defines various “required” and “optional” schedule components. Scheduling Model Components: Defines various “required” and “optional” schedule components. Project Schedule Model Maturity: Provides a methodology to objectively assess the maturity of a project schedule. Project Schedule Model Maturity: Provides a methodology to objectively assess the maturity of a project schedule. Appendices: Includes a “Maturity Assessment Table” and a “Glossary” of scheduling terms. Appendices: Includes a “Maturity Assessment Table” and a “Glossary” of scheduling terms.

2 November 2005 Slide 6 of 12 PMI – The Status of the new Practice Standard for Scheduling Development has entered its final phase: Complete: Draft V3.0 (Aug 2 05) submitted to the PMI Standards Member Advisory Group (MAG) and a select group of Subject Matter Experts (SME’s) for review. Complete: Draft V3.0 (Aug 2 05) submitted to the PMI Standards Member Advisory Group (MAG) and a select group of Subject Matter Experts (SME’s) for review. Dec 05: Comments due back. Dec 05: Comments due back. Dec 05 – Early 06: Comments evaluated & incorporated in dialog with the PMI Standards Organisation. Dec 05 – Early 06: Comments evaluated & incorporated in dialog with the PMI Standards Organisation. Early 06: Standard released to the profession as exposure draft. Early 06: Standard released to the profession as exposure draft. Late 06: Standard to be published by the PMI World Congress. Late 06: Standard to be published by the PMI World Congress.

2 November 2005 Slide 7 of 12 Inaugural PMI COS Conference (Montreal 2004) May 2004 May 2004 There were five themes (5 tracks): There were five themes (5 tracks): 1. Workshops – Hands-on planning & control 2. Practical Examples – Lessons learned 3. Risk – Setting appropriate expectations 4. Research – Statistical analysis 5. Global – Comparative studies Highlights: Highlights: 1. Practical: Appropriate schedule granularity. 2. Primacy of Risk: Schedule Maturity & Litigation. 3. CPM Analysis: Critical path considerations. 4. A global view: Working in the international arena.

2 November 2005 Slide 8 of 12 PMI COS – A Global Vision The Vision: “ The PMI College of Scheduling will be recognised as a dynamic organisation of professionals dedicated to promoting the expectation and implementation of accurate, ethical schedules throughout the world”

2 November 2005 Slide 9 of 12 PMI COS – A Global Mission The Mission “The PMI College of Scheduling will provide a forum for professionals to promote excellence in scheduling through networking, sharing project experiences, providing and receiving training, providing support and encouragement for the ongoing development of the PMI Body of Knowledge in the areas of scheduling and time management, and supporting project managers in their PMP certification efforts”.

2 November 2005 Slide 10 of 12 Benefits of PMI-COS membership Access to research papers and various PMI standards. Access to research papers and various PMI standards. The opportunity to exchange ideas with others dedicated to promoting excellence and professionalism in scheduling, The opportunity to exchange ideas with others dedicated to promoting excellence and professionalism in scheduling, To benefit from different industry experience. To benefit from different industry experience. Access to various initiatives of the PMICOS including the SEI. Access to various initiatives of the PMICOS including the SEI. Access to various initiatives of the PMI including the Practice Standard for Scheduling. Access to various initiatives of the PMI including the Practice Standard for Scheduling. Complimentary copy of PMBOK. Complimentary copy of PMBOK. 12 month subscription to three PMI journals. 12 month subscription to three PMI journals. Professional development seminars & regular conferences Professional development seminars & regular conferences Discussion forums. Discussion forums. Networking with a variety of professionals. Networking with a variety of professionals.

2 November 2005 Slide 11 of 12 PMI COS – How do you join? There has never been a better time to join PMI-COS It is a time of exciting new initiatives and establishing best practice. It is a time of exciting new initiatives and establishing best practice. The many benefits are listed in the application form and the website. The many benefits are listed in the application form and the website. To join just complete the form & nominate a chapter (Canberra) and the College of Scheduling. To join just complete the form & nominate a chapter (Canberra) and the College of Scheduling. Enter the Website for the application form: Enter the Website for the application form: & select: “become a member”

2 November 2005 Slide 12 of 12 PMI COS – Questions? Questions