BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.

Slides:



Advertisements
Similar presentations
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Advertisements

Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.
Great Western Corridor Feasibility Study
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
Titusville to Edgewater Bike Loop PD&E Study
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
1 C E T A S Range of Alternatives Presentation Date Project Name Project location (city, county) ODOT Key Number:
Northwest Florida Transportation Corridor Authority.
Proposed Replacement of the Herbert C. Bonner Bridge (Bridge No. 11) on NC 12 over Oregon Inlet TIP Project No. B-2500 Citizens Informational Workshops.
Environmental Assessment Public Meeting
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Wednesday, June 29, :30pm Presentation Jennings County High School.
Kick Off Meeting City of Pensacola April 18, 2011.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Longmeadow Parkway Fox River Bridge Corridor
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Presentation Outline Summary of efforts-to-date Broward County LRTP Amendment Process Next steps.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Future Transportation Projects within the Loxahatchee River Basin Florida Department of Transportation District IV 3400 W. Commercial Blvd W. Commercial.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
FY 2017-FY 2021 Project Priorities Okaloosa-Walton TPO Gary Kramer Senior Planner, TPO Staff
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Sustainabilty Briefing 96th Air Base Wing I n t e g r i t y - S e r v i c e - E x c e l l e n c e …It’s Always the Hour Colonel Eric Pohland 96 ABW/CV.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
EVALUATION AND APPRAISAL REPORT OVERVIEW, WORKPLAN & PUBLIC PARTICIPATION PLAN FOR ALACHUA COUNTY Energy Conservation Strategies Commission February 18,
Public Scoping Meeting National Environmental Policy Act Portageville Bridge Project Tuesday, November 19, PM – 7 PM Genesee River Restaurant,
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Oregon Passenger Rail Leadership Council Meeting June 6, 2012.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, July 28 th 2015.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
USA Parkway Project Welcome Public Information Meeting to the
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
Orlando-Orange County Expressway Authority Project Development Process.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Planning Commission Study Session: Preferred Plan July 23, 2015.
State Route 28/U.S. Highway Route 127 Improvements Project Fentress County, Tennessee Public Hearing March 15, 2011 South Fentress Elementary School 5018.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Alternative Alignments Public Meeting
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Willow Meadows Civic Club Meeting September 13, 2011
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
US 181 Harbor Bridge Project
Transportation Alternatives (TA) Set-aside
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
S.R. 30 (U.S. 98) Tyndall Parkway
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Wakulla County Airport
Presentation transcript:

BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR Project Manager) Presentation to: Okaloosa-Walton Transportation Organization & Committees

What is the Purpose of the Study?  Identify the best solution and location for replacement of the existing Brooks Bridge and secure federal approvals Why is the Project Needed?  Structurally deficient  Does not meet current design standards  Does not meet Americans with Disabilities Act (ADA) pedestrian/bike requirements Purpose and Need 2 of 20

Brooks Bridge Replacement Study – Project Location Map

Brooks Bridge Replacement Study – Project Schedule Alternatives Analysis Alternatives Public Workshop Public Hearing Environmental & Engineering Documents Final FHWA Project Approval Environmental Analysis JanMay JanFebDec Community Outreach Project Initiation Environmental & Engineering Data Collection Apr Public Kickoff Meeting Feb of 20 Jul

Status Update 5 of 20  Completed initial environmental agency coordination (ETDM)  Completed Navigation Study  Completed traffic modeling  Began alternatives analysis  Began environmental evaluation  Continued public outreach activities Determine Recommended Replacement Alternative Evaluate Alternatives 5 STEP Develop Alternatives 4 STEP Analyze Typical Sections 3 STEP Analyze Current and Future Traffic Analyze Current and Future Traffic 2 STEP Determine Bridge Height 1 STEP

Determine Bridge Height US Coast Guard Required Clearances 1 6 of 20

ADA Requirements Determine Bridge Height 1 7 of 20

Analyze Current & Future Traffic 2040 Traffic  58,700 vehicles per day crossing Brooks Bridge 2 8 of 20

9 Analyze Typical Sections 3 9 of 20

10 Analyze Typical Sections 3 10 of 20

Bridge Construction Phasing 11 EXISTING CONDITION 11 of 20

Bridge Construction Phasing 12 PHASE I CONSTRUCTION 12 of 20

Bridge Construction Phasing 13 PHASE IIA CONSTRUCTION 13 of 20

Bridge Construction Phasing 14 PHASE IIB CONSTRUCTION 14 of 20

Bridge Construction Phasing 15 FINAL CONDITION 15 of 20

Develop Alternatives 4 16 of 20

 Engineering o Purpose and Need o Alternatives Analysis o Structures o Traffic o Right-of-Way o Safety o Bicycles/Pedestrians o Drainage o Utilities o Cost  Environmental o Air Quality o Noise o Social and Community o Wetlands o Wildlife and Habitat o Visual and Aesthetics o Parks and Recreational Facilities o Water Quality o Cultural Resources o Land Uses o Economics o Contamination o Construction  Public Involvement o Public Meetings o Agency and Elected Official briefings o Stakeholder/Small group meetings o Website o Newsletters o Social Media Evaluate Alternatives 5 17 of 20

 Okaloosa-Walton TPO Briefings o April 16, 2015; February 18, 2016  Efficient Transportation Decision Making (ETDM) Agency Review o April 17, 2015 – October 27, 2015  Public Kickoff Meeting o April 23, 2015  Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 18 of 20

 Local and agency coordination o City of Fort Walton Beach o Chamber of Commerce o Okaloosa County (Commissioners, Convention Center, Fire District, Public Works) o Eglin Air Force Base o National Park Service / Gulf Islands National Seashore o U.S. Fish and Wildlife Service / National Marine Fisheries Service o Florida Department of Environmental Protection o Coast Guard o Gulf Intracoastal Canal Association / Warrior Tombigee Waterway Association Outreach Activities 19 of 20

Stay Involved Date: Tuesday, May 17, 2016 Time: 5:30 - 6:30 p.m. Location: Emerald Coast Convention Center 1250 Miracle Strip Pkwy SE, Fort Walton Beach, Florida Alternatives Public Meeting: Can’t attend the meeting? Follow us on Stay Involved: Us: 20 of 20

SANTA ROSA SOUND ALTERNATE CROSSING STUDY Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR Project Manager) Presentation to: Okaloosa-Walton Transportation Organization & Committees February 18, 2016

What is the Purpose of the Study?  Evaluate the feasibility for a potential alternate crossing of the Santa Rosa Sound  Develop the information needed to decide whether to proceed to the PD&E phase Why is the Project Needed?  An additional crossing is being considered as a means to relieving traffic congestion in the Ft. Walton Beach region 2 of 11 Purpose and Need

 Alternate Corridor Evaluation (ACE) process o Provides a method for identifying and evaluating corridors o Allows for stakeholder, agency and public input o Meets the planning requirements of NEPA and other federal laws / acts Project Overview & Process ConstructionRight-of-Way Project Development & Environment Study Design Planning Phase 3 of 11

Status Update  Completed data collection  Identified preliminary corridor alternatives  Completed initial environmental agency coordination (ETDM Planning Screen)  Began evaluating traffic  Began corridor evaluation  Continued public outreach activities Determine if project should proceed into PD&E Prepare ACE Report 5 STEP Evaluate and Compare 4 STEP Screen Preliminary Corridor Alternatives Screen Preliminary Corridor Alternatives 3 STEP Identify Preliminary Corridor Alternatives Identify Preliminary Corridor Alternatives 2 STEP Collect/Analyze Data 1 STEP 4 of 11

Land Suitability Mapping

Existing Traffic Patterns 26 Existing Traffic Patterns

insert corridor map from Michele

 Okaloosa-Walton TPO Briefings o April 16, 2015; February 18, 2016  Public Kickoff Meeting o April 23, 2015  Stakeholder Advisory Group Meetings o September 1, 2015 o February 11, 2016  Efficient Transportation Decision Making (ETDM) Agency Review o October 9, 2015 – January 25, 2016 Outreach Activities 8 of 11

NATURALCULTURALCOMMUNITY Air Quality Coastal & Marine Contaminated Sites Farmlands Floodplains Noise Navigation Special Designations Water Quality & Quantity Wetlands Wildlife & Habitat Historic Archeological Sites Recreation Areas Section 4(f) Potential Economic Land Use Relocation Social Alternative 1243N/A Alternative 2 243N/A Alternative 3 243N/A Alternative 4 243N/A Alternative 5 243N/A Alternative 6 243N/A Alternative 7 243N/A Alternative 8 243N/A Alternative 9 243N/A Alternative N/A No Involvement 3 ModerateFor additional information on the FDOT Efficient Transportation Decision Making (ETDM) and Environmental Technical Advisory Team (ETAT) process, visit: (project number 14236). 1 Enhanced 4 Substantial 0 None 5 Dispute Resolution 2 Minimal 9 of 11

 ETAT Review of Methodology Memorandum (early March 2016)  Apply methodology and analyze/evaluate corridors (April 2016)  Draft Alternate Corridor Evaluation Report (June 2106)  Public Corridor Workshop (targeting September 2016)  Finalize ACER and make recommendation (December 2016) Next Steps Follow us on Stay Involved: Us: 10 of 11

Contact Us Project Manager April Williams, PE FDOT District Highway 90 Chipley, FL (888) , ext Public Information Director Ian Satter FDOT District Highway 90 Chipley, FL (888) , ext Consultant Project Manager Steve Schnell, AICP 200 W Forsyth Street Suite 800 Jacksonville, FL (904) Contact Information: 11 of 11