EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS Initial Camera Setup and Focus* *Same window will be used for all images taken Node 2 ZENITH 0:25 MOON-CAMERA- S/U Setup may be done anytime prior; or immediately before the focus activity 0:20 MOON-STOW-RELOC Hard Schedule prior to first Moon Imagery ops. :20 MOON-STOW-RETURN Task List, at completion of Moon Imagery: by 1 or 2 days prior to SPX6 berth. PD will provide PPM with multiple options for day/time of focus activity
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY :10 :15 Sample on at least 3 days 3.0 hrs total over what could be days from different lunar cycles. PD will provide PPM with multiple options for each photography day in order to allow some scheduling flexibility. *All images to be taken from the same characterization window, with same camera and dedicated lens. These Primary Requirements should be hard scheduled. Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-EXP-PHOTO1* Prime Requirement Imagery One Sampling Day Definition :20 MOON-EXP-PHOTO S/U Setup can be immediately prior to PD designated Photo1 time or the day prior :10 :20 MOON-STOW- RELOC Task List, if activity is necessary :20 MOON-STOW- RETURN Task List, at completion of Moon Imagery: by 1 or 2 days prior to SPX6 berth. PD will provide PPM with multiple options for each photography day Photo1 and Photo2 sessions. :05 MOON-SPOC-START MOON-EXP-CAMR CHECK MOON-EXP-PHOTO2* : 15 MOON-SPOC- WAIT
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE One Time Window Characterization Photos* *Same window will be used for all images taken Node 2 ZENITH PD will provide PPM with multiple options for each photography day in order to allow some scheduling flexibility. 0:20 MOON-WIN-TEST S/U 0:10 MOON-WIN-TEST IMAGE PD will provide PPM with multiple options for window characterization sessions. 0:20 MOON-STOW- RELOC Hard Schedule prior to first Moon Imagery ops. :20 MOON-STOW- RETURN Task List, at completion of Moon Imagery: by 1 or 2 days prior to SPX6 berth. The setup may be done the day prior, or immediately prior to imaging activity
EO10-PPO-118 parcall /2/15 PARC/M.Cash Crew :05 MOON-CEO-OPS 1 Target times will be included in the CEO target list through nominal CEO Target process for “bonus” moon images—beyond the Primary Requirements. These may be scheduled any time after: 1.Window Characterization 2.During times that Stowage is clear MOON IMAGERY
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs)Roll-up Notes EO10-PPO Baseline42 & Subs 1/23/15 Adds document number “EO10-PPO-118” to PPO. JIT ocr ocpcall Baseline42 & Subs 2/6/15Nominal: 4.08 Reserve: Inc 41/42Working PTP 1/21/15 Nominal: Reserve: 5.5 Each designated sampling day is comprised of 2 image collecting sessions, ½ day apart. Each designated sampling day will require 66 minutes of crew time; split between the two collecting sessions of 33 min each. Imagery on 3 days spanning the lunar cycle is desired. parcall000074Rev A42 & Subs 3/2/15Activity “MOON-SPOC-START” added to ensure that the SpOC clock is started at least 15 min prior to photography. “MOON-SPOC-WAIT” is an unattended activity to allow JSL comms *Crew Roll-up is not maintained real-time.