Where We Work. 83.7% In Non-Attainment Area Where We Educate – Higher Ed. Private schools are not included in this figure. Blue areas are within an attainment.

Slides:



Advertisements
Similar presentations
HANNAH ZELLNER MASTER IN ENERGY & EARTH RESOURCES CANDIDATE JACKSON SCHOOL OF GEOSCIENCES THE UNIVERSITY OF TEXAS AT AUSTIN WATER CONSERVATION STRATEGIES.
Advertisements

Getting your Project Funded Energy Project Implementation Process Presented to: NJHEPS/NJAPPA January 20, 2012.
Allowing DSUs to act as Predictable Price Takers in the SEM 4th December, 2014.
E MISSIONS R EDUCTIONS SB5 G RANT P ROGRAM P RESENTED TO THE TERP B OARD A UGUST 4, 2004.
Informations about Brazilian Auctions Reserve Energy Auction – LER 2013 Date of Occurrence : August 23th, 2013 Date for Supply: September /2015.
Helping Government Go Solar 1 Steven Eddy, AICP Government Relations August 21, 2014.
The Land Use and Air Quality Connection Presented By: Larry Robinson SMAQMD Land Use & Transportation Section.
Toward a Sustainable Campus Part II: Improving the Efficiency of the CNS Building Energy Systems Nitin Rajan ‘07 Physics Department Ithaca College.
Numbers
P247. Figure 9-1 p248 Figure 9-2 p251 p251 Figure 9-3 p253.
How to Prepare for State Architect & Engineering Services and Upcoming Construction Projects How Architects and Engineers Get Business with the State May.
DES Energy Program Energy Performance Contracting: Using future Energy Savings to help finance the cost of construction.
Saving With Solar: LESSONS FROM THE MORRIS HYBRID Power Purchase Agreements MODEL April 18, 2013 ASES ANNUAL CONFERENCE BALTIMORE, MARYLAND.
Minnesota’s Energy Needs, in Natural Units of Renewable Energy Louis Schwartzkopf, Minnesota State University, Mankato The question: How can we make the.
Strategies to Transition Older Youth into Workforce Activities After Summer 2009 (ARRA) A Collaboration between the San Diego Workforce Partnership Youth.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
Energy Efficiency Programs for Your AG Business Randy Vagnini Connecticut Light & Power & Yankee Gas.
Wind Turbines & Solar Panels Which is Better?. Technology Comparisons On average a turbine will produce 3 million KWh of Electricity per year Commercial.
NV Energy’s Energy Smart Schools Program Overview Andy DuMond Senior Program Manager, CLEAResult Andy DuMond Senior Program Manager, CLEAResult March 13,
Meeting the 10% Conservation Goal Jennifer L. Gorter, PE, CEM Fairfax County Government Facilities Management Department (FMD) April 11, 2008.
WINTER PREPAREDNESS PLAN ALLIANT GAS. Alliant Gas is the propane gas company that operates as a regulated utility in the towns of Payson and.
Evaluation of NEW LARGE ENERGY LOADS July 28, 2014 Andy Wendell.
Energy is the capacity to do work or produce a change. Think of the energy of a substance as the total of the kinetic & potential energies of all the particles.
Deemed Calculation for Variable Speed Drives on Milking Machine Vacuum Pumps May 7, 2002.
Improving Energy Efficiency U.S. and West Coast Joint Commissions Energy Efficiency Workshops December 1, 2006 Arthur H. Rosenfeld, Commissioner California.
INVOLAR Microinverters Evaluation of ROI of a 3 kW PV system.
SUNREF program – Sustainable Use of Natural Resources and Environmental Finance TISIF 2015.
Joint California Energy Commission and California Public Utilities Commission Bulk Storage Workshop November 20, 2015 Kelly Rodgers Energy Program Manager.
CBC activity - collaborative contracts Estimation of possible savings by the end of Energy £320 million Fleet £110 million Office solutions.
A LEVEL STUDENTS 2015: WELL DONE YEAR 13! RESULTS AVAILABLE FROM THE DINING ROOM FROM 10.00A.M.
State Of Wisconsin Programs and Incentives for Energy Efficiency and Renewables MEGAN LEVY DIRECTOR OF LOCAL ENERGY PROGRAMS WI STATE ENERGY OFFICE MARCH.
City of Excelsior 2014 Budget Presentation December 2, 2013 City Council Meeting.
Sawa Group Sawa Park Mchinji Road, Njewa Lilongwe, Malawi
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
WSSC Solar PV PPA Phase 2 Rob Taylor Energy Manager May18, 2016.
Celebrating over 50 years… Congratulations, municipalities have been eligible to use OGS contracts to purchase materials, equipment and supplies since.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Contact Us.
Energy Efficiency Opportunities for Manufacturing Industries
Next Phase Solar Project Update
Construction Technical Services, Inc.
Vermont Small Business Development Center
Calculating Payback Period
Date of download: 10/31/2017 Copyright © ASME. All rights reserved.
Utilization and Volume
How To Add A Xerox Printer To Google Chrome
Frio River Cabins - Frio Vacation Homes - Frio Country Resort
Virginia’s Public Private Partnership Law
Shilshole Bay Marina Customer Service Facilities
Yahoo Mail Customer Support Number

Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
Audit Presentation to the City Council
استاد: دکتر غلام نبی فیضی چکاب تهیه و تنظیم: بهزاد رازقی منصور پاییز93
Partnership | Infrastructure Attributes and Degree of Complexity
Contract Implications of Proposed ZEB Regulations
به نام خدایی که یاد او، مایه ی آرامش واقعی است.
THANK YOU!.
Thank you.
Thank you.
2017 Book of Business Results Higher Productivity/Satisfaction
Restructuring Roundtable: Merchant vs Rate-Base
Troy School District Board Presentation For Year Ended June 30, 2013.
Firebase Vs. MongoDB: Choose the Best Database of 2019
Meet Us
Contact Us
Presentation transcript:

Where We Work

83.7% In Non-Attainment Area

Where We Educate – Higher Ed. Private schools are not included in this figure. Blue areas are within an attainment county

Where We Educate – Higher Ed. 87.3% In Non-Attainment Area

Where We Educate – K-12 Charter Schools and Private schools are not included in this figure.

Where We Educate – K % In Non-Attainment Area

Performance Contracting

Building Energy Savings 31.2% Average ROI

$36M Avoided Costs Building Energy Savings

5.17 MW Capacity 7.9 Million Kwh/YR 24,000 LBS. of Emissions/YR 2016 Proposed Projects: 5.2 MW

$100M Utility Costs Avoided Over Life of Facilities Building Energy Savings

Contact Chamonix Larsen Thank you.