Design of wide aperture/thin septa of extraction system for J-PARC-50GeV ring 1. The outline of septa system for 50GeVring 2. Designing of thin septa and.

Slides:



Advertisements
Similar presentations
Engineered Isostatic Ceramics
Advertisements

LEarNeR© Kit 1- Core LENR Reactor Description of hardware, fittings and raw metal that can be purchased. Prices, part numbers & vendors, high pricing for.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Superconducting Large Bore Sextupole for ILC
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet Design Workshop: Magnet Design and Analysis Charles Spataro, NSLS-II Project NSLS-II is a new 3Gev synchrotron.
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
INTRODUCTION to the DESIGN and FABRICATION of IRON- DOMINATED ACCELERATOR MAGNETS Cherrill Spencer, Magnet Engineer HOMEWORK PROBLEM for Lecture # 2 of.
Chapter 1 MAGNETIC CIRCUIT.
Status of CEPC Detector magnet
Magnet designs for Super-FRS and CR
FAIR MT/Cryogenics, Seong Yeub Shim Beam-Tube Eddy Loss S. Y. Shim.
Day 3: Eddy Currents Back EMF in Motors Eddy Currents Nature of Eddy Currents.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
Topic 2. Development and Design of DC machines
Lesson No. 07 Week No. 04 Lesson Name Hacksaw Frame & Blade.
Support and magnet coil KEK Hiroshi Yamaoka Nov. 10, ‘04.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
14th ICFA Mini-Workshop on Septa Devices in Accelerators
1.3GHz Input Coupler for ILC
SIS 300 Magnet Design Options. Cos n  magnets; cooling with supercritical Helium GSI 001 existing magnet built at BNG measured in our test facility 6.
Design of DC septum magnets based on measurements and 3D calculation of an R&D septum magnet for Rapid Cycle Synchrotron of J-PARC Masao Watanabe, Accelerator.
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
A Presentation On Construction Of Turbo Generator
Muon Cooling Channel Superconducting Magnet Systems Muon Collider Task Force Meeting on July 31, 2006 V.S. Kashikhin.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
Comparing current waveforms and shielding options for SMH42 Zsolt Szoke LIU-PS Meeting, 16/12/2014.
Reducing the Iron in the Endcap Yoke of CLIC_SiD Benoit Curé, Konrad Elsener, Hubert Gerwig, CERN CERN, June 2014 Linear Collider Detector Magnet Meeting.
Principals of fast injection and extraction R. Apsimon.
Enrique Calvo Alamillo Ds DHCAL m 3 modular structure. 2. Basic modular distribution. 3. Guiding and repositioning system. 4. Detector.
NUMI Update on Steel, Coils, Fixtures, and Prototyping J.K. Nelson 12/98 MINOS Meeting.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
D. Arbelaez for the LBNL LCLS SCU team Mar. 3,
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
Metals Unit 212/255 – Principles of Fabrication and Welding Technology.
Preliminary analysis of a 16 T sc dipole with cos-theta lay-out INFN team October 2015.
L-8 MAGNETIC CIRCUITS ELE 1001: Basic Electrical Technology
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
MSE Pulsed Septum for g-2 and Mu2e Design Review A. Makarov 2/11/2016.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
Yingshun Zhu Accelerator Center, Magnet Group
Some Design Considerations and R &D of CEPCB Dipole Magnet
Page Headline CBETA Splitter.
Ti/SS transitions A.Basti INFN-PISA*
6th BINP-FAIR-GSI Workshop,
Enrique Calvo Alamillo DAEGU
The design schemes of the low field dipole magnets
Hervé Allain, R. van Weelderen (CERN)
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Arc magnet designs Attilio Milanese 13 Oct. 2016
Technical Feasibility of Anti-DID Coil
CHEN, Fusan KANG, Wen November 5, 2017
Conceptual Design of CEPC Interaction Region Superconducting Magnets
WG4 – Progress report R. Santoro and A. Tauro.
- chambers & absorbers -
Yingshun Zhu Accelerator Center, Magnet Group
Compact and Low Consumption Magnet Design The DESY Experience
Brief Status Report on Fabrication of ATF2 Quads
Fusan Chen, Wen Kang, Mei Yang*
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Chapter 32 Problems 6,7,9,16,29,30,31,37.
Iross™ Fluxmanager® Stress relieving System
Presentation transcript:

Design of wide aperture/thin septa of extraction system for J-PARC-50GeV ring 1. The outline of septa system for 50GeVring 2. Designing of thin septa and medium thin septa for fast/slow extraction

The extraction septa for 50GeVring Septa for fast extraction Number of septa 14 Current 4.0kAmps~6.5kAmps Pattern operation Septa for slow extraction Number of septa 10 Current 4.5kAmps~5.0kAmps CD operation Layout of 50GeVring

Configuration of magnetic septa for slow extraction Thickness thin septa 1.5mm and 3.5mm Medium thick septa 7.5mm Thick septa 30mm~62mm Field 0.114T 0.528T 1.4T~1.66T

Configuration of septa for fast extraction Thickness Medium thick septa 9mm Thick septa 30mm~62mm Patten operation 0.17s(FB)+1.9s(Rise)+0.1(Top)+0.87s(Fall)=3.04s Field 0.459T 1.38T~1.66T

The structure of SM10 The septum conductor is touched to the core in order to decrease the leakage flux. The core is laminated core. Field 0.114T Current 5kAmps Magnet length 1.5m

Clearance of Beam and septum Since injection beam is close to core, inner support of septum conductor is adopted.

The structure of SM11 The conductor is a centipede structure for fixing the coil, The core is laminated core.

Current 5000A Current density 91A/mm 2 Generation of heat 18.2kW Water Water speed 7m/s Tin =25 ℃ Tout=70 ℃ Conductor Tw=73 ℃ Tmax =247 ℃ The heat calculation of SM10 Thickness 1.0mm

The field calculation of SM10 Thickness 1.5mm Flatness ΔB/Bo=0.25% at y=0 ΔB/Bo=0.5% at y=13mm Leak field Less than 10G

Medium thin septa SM2 Fast extraction Thickness of septum 9mm Bo=0.459T Magnet length 0.875m 4 turn Slow extraction Thickness of septum7.5mm Bo=0.528T Magnet length 0.875m 6turn

Heat calculation of SM2 4turn (I=7458A)6turn(I=4972A) Water speed is too high and it’s dangerous considering cavitation of hollow conductor Size 4.5mmx 16.6mm Hole φ3mm Size 4.5mmx 11mm Hole φ3mm

Optimization of cooling pipe (thickness 7.5mm) The calculated temperature in case of containing stainless steal pipe are shown, When the diameter of pipe is 3.7mm, temperature is minimized. Thickness of pipe are chosen to be 0.3mm.

Test piece of conductor Conductor size 5mmx11mm Diameter of holes φ3mm Silver brazing In order to reduce the risk of erosion and corrosion, Steel pipes are put into cupper conductor.

Test piece made by HIP(Hot Isostatic Pressing) Size 4.5mmx17mm Thickness of Stainless pipe is 0.5mm The two stainless pipes are put into the cupper plate, then added pressing and heat. Finally machining to required shape and dimension.

Summary Field calculation of thin septa for slow extraction has performed and obtained a flatness of field within 0.5%. For the medium thin septa, A test piece of optimized conductor was made for the 6turn coil septum. Hereafter, R&D test will be done to ensure the fabrication.