Juin 1st 2010 Christophe Beigbeder PID meeting1 PID meeting Electronics Integration.

Slides:



Advertisements
Similar presentations
20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
Advertisements

JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Low Cost TDC Using FPGA Logic Cell Delay Jinyuan Wu, Z. Shi For CKM Collaboration Jan
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
PicoTDC Features of the picoTDC (operating at 1280 MHz with 64 delay cells) Focus of the unit on very small time bins, 12ps basic, 3ps interpolation Interpolation.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
11-th CBM Collaboration Meeting. GSI Darmstadt Feb , A New Data Acquisition System based on Asynchronous Technique Yu. Bocharov, A. Gumenyuk,
21-Aug-06DoE Site Review / Harvard(1) Front End Electronics for the NOvA Neutrino Detector John Oliver Long baseline neutrino experiment Fermilab (Chicago)
First ideas for the Argontube electronics Shaper, simulations Block Diagram for analog path Delta Code Data Reduction Bus system, Controller Max.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Front-end readout study for SuperKEKB IGARASHI Youichi.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
15-Aug-08DoE Site Review / Harvard(1) Front End Electronics for the NOvA Neutrino Detector John Oliver, Nathan Felt, Sarah Harder Long baseline neutrino.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Christophe Beigbeder - SuperB meeting - SLAC Oct PID electronics summary electronics (on behalf of PID electronics group)
Pixel detector/Readout for SuperB T.Kawasaki Niigata-U.
1 D. BRETON 1, L.LETERRIER 2, V.TOCUT 1, Ph. VALLERAND 2 (1) LAL ORSAY - France (2) LPC CAEN - France Super Nemo Absolute Time Stamper A high resolution.
November 16th 2011 Christophe Beigbeder 1 ETD meeting PID Integration.
SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici DCH Readout and Control System A (very) preliminary study.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
"North American" Electronics
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
ETD meeting Architecture and costing On behalf of PID group
Pid session TDC-based electronics for the CRT
ETD PID meeting We had many presentations dedicated to the PM test .
D. Breton, S. Simion February 2012
PID meeting SNATS to SCATS New front end design
Christophe Beigbeder PID meeting
ETD meeting First estimation of the number of links
Designing electronics for a TOF Forward PID for SuperB D. Breton & J
Iwaki System Readout Board User’s Guide
ETD meeting Electronic design for the barrel : Front end chip and TDC
From SNATS to SCATS C. Beigbeder1, D. Breton1,F.Dulucq1, L. Leterrier2, J. Maalmi1, V. Tocut1, Ph. Vallerand3 1 : LAL Orsay, France (IN2P3 – CNRS) 2 :
PID meeting SCATS Status on front end design
Christophe Beigbeder PID meeting
DCH FEE 28 chs DCH prototype FEE &
A Readout Electronics System for GEM Detectors
CMS EMU TRIGGER ELECTRONICS
Ongoing R&D in Orsay/Saclay on ps time measurement: a USB-powered 2-channel 3.2GS/s 12-bit digitizer D.Breton (LAL Orsay), E.Delagnes (CEA/IRFU) Séminaire.
FIT Front End Electronics & Readout
Modelisation of control of SuperB Common Front-End Electronics
Christophe Beigbeder PID meeting
Christophe Beigbeder/ PID meeting
Christophe Beigbeder/ ETD PID meeting
VELO readout On detector electronics Off detector electronics to DAQ
LHCb calorimeter main features
Dominique Breton, Jihane Maalmi
Example of DAQ Trigger issues for the SoLID experiment
PID electronics for FDIRC (Focusing Detector of Internally Reflected Cherenkov light) and FTOF (Forward Time of Flight) Christophe Beigbeder and Dominique.
Tests Front-end card Status
PID meeting Mechanical implementation Electronics architecture
ETD parallel session March 18th 2010
SVT detector electronics
Electronics for the PID
Electronics, Trigger and DAQ for SuperB: summary of the workshop.
U. Marconi, D. Breton, S. Luitz
Orsay Talks Christophe : General questions and future developments.
Presentation transcript:

Juin 1st 2010 Christophe Beigbeder PID meeting1 PID meeting Electronics Integration

Juin 1st 2010 Christophe Beigbeder PID meeting2 Electronics on the detector  Mechanical constraints: Fixing the module on the PM base. Dismounting issues.  Thermal constraints : Door closed gives problems of cooling.  Fans on the module as G Varner’s ?  Global heat extraction…. Electronics is split in two parts : - one directly mounted on the PM base receiving the PM signal and processing it with TDC/ADC - the other one concentrates and pack all the channels to send data to the DAQ

Juin 1st 2010 Christophe Beigbeder PID meeting3

Juin 1st 2010 Christophe Beigbeder PID meeting4 Other possible solutions … Long boards : 80 channels. Mechanical issues for a precise adjustment base to base. This granularity has a impact in case of failure. No long a Pm considered as a cell element but a row of 5 pms.

Juin 1st 2010 Christophe Beigbeder PID meeting5 Cooling issue A rough estimation gives : A rough estimation gives : Fe : 500 mW / 16 channels Fe : 500 mW / 16 channels Pga : 1 W / 16 channels Pga : 1 W / 16 channels TDC : 500 mW /16 channels TDC : 500 mW /16 channels `+ glue => Total 3 W / 16 channels `+ glue => Total 3 W / 16 channels => Sector ( ~3Kchannels ) = ~ 600 W => Sector ( ~3Kchannels ) = ~ 600 W => 7 KW in total => 7 KW in total

Juin 1st 2010 Christophe Beigbeder PID meeting6 Cooling issue From documentation From documentation Q = ( 3.1 P) / T Q = ( 3.1 P) / T Q= airflow in m3 / h Q= airflow in m3 / h P = Dissipated power ( W) P = Dissipated power ( W) T = Temperature change at given air flow T = Temperature change at given air flow -> 600 W power, a specified difference T = 10 degre requires a airflow of 190 m3 /h -> 600 W power, a specified difference T = 10 degre requires a airflow of 190 m3 /h

Juin 1st 2010 Christophe Beigbeder PID meeting7 Mechanical issues Boards/ Module insertion/desinsertion issues Boards/ Module insertion/desinsertion issues

Juin 1st 2010 Christophe Beigbeder PID meeting8 Mechanical constraints Pins issue : Male -> Female on the “backplane “ Pins issue : Male -> Female on the “backplane “

Juin 1st 2010 Christophe Beigbeder PID meeting9 FE board synopsis

Juin 1st 2010 Christophe Beigbeder PID meeting10 SNATS : new design Instantaneous Dead time Readout dead time Max speed 1Mhz Push the data

Juin 1st 2010 Christophe Beigbeder PID meeting11 Summary of the SNATS evolution : Redesign of the readout and a few improvements on the Front end part Programmable number of bits for the time counter. New derandomizing FIFOs : depth of 16/32 events ( each of 4 * 16-bit data word) Data push at the output Run end AMS.35 um technology. Chip delivered first quarter of 2011 We have to think of the way to run the chip together with the FE ASIC and to match the analog pulse converted by the ADC with the hit time -> Design and simulation in the FPGA Also have to interface the FPGA with the Proposal for the Electronics Trigger and DAQ architecture to get inside the front end buffer. The data are output with a latency depending on the rate per channel and the occupancy of the chip. 2 Clk cycles to output the data ( Derandomizer FIFO to 84 MHz (56*1.5) ) followed by 2 Clk cycles for each other fired Channel. Latency from 2 Clk cycles to 32 Clk cycles ( 2.5 MHz per channel )