Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.

Slides:



Advertisements
Similar presentations
Launch Timeline PowerPoint created by Shirley Garrett using Space Camp handout.
Advertisements

① The output signal of a room thermostat is ON or OFF according to changes of room temperature ② The power supply to a motorized valve is ON or OFF according.
Return to Flight Status of Launch Window Changes Manager, Space Shuttle Systems Integration (Operations) – John Shannon Chief, Ascent/Descent Dynamics.
Solar Cell Efficiency Flight Readiness Review Teddy Bounds Angela Dunn Joel Sasser.
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
C2V2 Technical Requirements and Constraints
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Calibration (Qualification) of Centrifuge
Hands-On Microsoft Windows Server 2008
May 21-25, 2007Phase II FSR1 ISS Hardware Magnetic Susceptibility Testing and Analysis Trent Martin NASA AMS Project Manager
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
Transition to 6-person crew ASE conference, Praha Oct 8, 2009 Andreas Schön, ESA All dates used in this presentation are examples only, they do not necessarily.
9-5 Time and Temperature Course 1 Warm Up Warm Up Lesson Presentation Lesson Presentation Problem of the Day Problem of the Day.
Time and Temperature.
9-5 Time and Temperature Course 1 Warm Up Warm Up Lesson Presentation Lesson Presentation Problem of the Day Problem of the Day.
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
ESCG\L. D. Hill AMS-02 Permanent Magnet Safety Impact 1 AMS-02-PM Design Review - May 4-5, 2010.
EVA: Don’t Leave Earth Without It
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
Mission Integration OZ2/Winston J. Reid/(281) Page No. 1 International Space Station Alpha Magnetic Spectrometer-02 AMS-02 Ops TIM - Ops Assessment.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
CIR FOMA Calibration Crew 9/24/08 1:30 PRO-CIR ACT-CMD FOMA-BTL-CAL 1 CMD PRO-CIR DEACT-CMD 274 watts 402 watts274 watts This sequence powers CIR and correlates.
Introduction to Payload Planning Will Kirby (256)
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
Visual Survey of HREP Ricardo C. Rodriguez POD Office Lead for HREP POIWG External Payload Splinter 25 Jul 2012 Approved for Public Release, Distribution.
1 Increment 1 Lessons Learned Many things are not happening as predicted. Major differences are: –Scheduling and stowage –Turnaround times for troubleshooting.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.
EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.
MISSION AND PROGRAM INTEGRATION (MAPI) CONTRACT Pre-Decisional, Internal Use Only Speaker Name This presentation is intended solely for the audience.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
1 Space Test Program - Houston 4 Payload Overview POIWG, 26 Jul 2012.
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
ISS RapidScat Ops TIM1 11 December 2012 ISS RapidScat Payload Ops TIM Payload Overview JPL RapidScat Team 11 December 2012.
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-MICAST-EVAC CMD: 0/05:00 MSL-MICAST-HEAT1 CMD: 0/02:00 MSL-MICAST-HEAT2 CMD: 0/04:00 MSL-MCS212-EQUIL.
Revision A 12/19/12 PARC/T. Cassady Spinal Ultrasound SPINAL-S/W-REV_OPR SPINAL-CREW-CONF_OPR Operator Software Review and Crew Conference Ops before Spinal.
Lisa Prendergast EO20/ Operations Lead January
EO10-PPO-020 OCR emcs /15/14 PARC/C. Traylor Crew Additional Activities Unattended EMCS Facility Cleanup Post Gravi-2 Ops EMCS-GASRMV MOD-RPL :20.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
Page No. 1 STP-H3 Initial Operations POIWG #29 STP-H3 Splinter 27 Jan 2011 Capt Robert Plunkett, Program Manager, ,
EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate.
PARC/D. Westbrook Revision B 10/23/13 SODI Procedure Review SODI-PROC-REVIEW :30 A Crew Additional Activities TEXT Flexible.
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 Payload Crew Conference :30 PAYLOAD-CREW-CONF (at least twice per increment, monthly preferred)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
Belgian User Support and Operations Centre B.USOC SOLAR Operations Concept and Services SOLSPEC Workshop 10 March 2015 BIRA/IASB.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
Revision E 12/19/12 PARC/E. Litkenhous JAXA-SDRM WGVOPN-PLC PRO-SDRM ACT-CMD 1:00 SpaceDRUMS Experiment Operations SDRM-EXP-POWER UP Nominal Operations.
Radiation Resistant Lighting Ben Fiedler Supervisor: J. Devine.
External Payload Installation Challenges
Branching and Decisions
Links and Information Bible verses referenced in presentation:
Description of RFW Removable Front Window (RFW) will replace current window with no modification to the MSG Work Volume Structure (estimate 1.5 Hours for.
Launch and On-orbit Checkout
16:00 on Fri 2 Nov 2018 (GMT 306) To 16:00 on Mon 5 Nov 2018 (GMT 309)
AMS Summary 16:00 on Thu 10 Jan 2019 (GMT 010) To
AMS Summary 16:00 on Mon 25 Feb 2019 (GMT 056) To
AMS Summary 16:00 on Fri 22 Feb 2019 (GMT 053) To
Presentation transcript:

Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External Activities * Adapter Installation must take place during Crew Wake because of the physical switches to be checked/thrown. Robotic ops start late Orbit 2 during Crew Sleep. **If adapter not installed within 5.0 hrs, Return to Trunk FRAM and repower for 14 hrs to initial extraction temperature ***If instrument not installed within 4.0 hrs, return to inside Trunk within 1.0 hr, re-install to Trunk FRAM and repower for 30.0 hr to initial extraction temperature (JSC) PDU 1& 2 Deactivate (ESA) RSCAT-EXTERNAL-VIDEO (JSC) SSRMS Arm to DRAGON TRUNK Get Instrument Install Instrument To Adapter (on SDX Site) (JSC) ***Time lapse no longer than 5.0 hrs *ESA activity check That SDX switches are OFF— ALREADY COMPLETE SPDM /SSRMS to DRAGON TRUNK Get ADAPTER Install Adapter (on SDX Site) VEHICLEBERTH*VEHICLEBERTH* A RSCAT-HTR RES-TRACK PDU 1&2 Activate (ESA) ESA activity to switch SDX Switches to ON position. Heat ON 20.0 hrs after adapter extraction to reheat Instrument **Time lapse no longer than 6.0 hrs Heat to Adapter ON while getting The Instrument. SPDM performs trunk extraction to gain 12 inches clearance, then SSRMS pulls out of trunk Thermal Clock for unheated/unpowered P/L already installed is 2.0 hours 20 min. HDEV & SOLAR Deactivate HDEV &SOLAR Activate XCMU SDX OFF (ESA) XCMU SDX ON (ESA) XCMU SDX ON (ESA) RSCAT-HTR RES-TRACK

Baseline Review 05/20/14 PARC/Martha Cash Crew POIC Commanding External Activities Unattended Time Critical RapidScat DIB Check After Installation Prior to SPX 4 Departure *If concurrent EVA, EVR, or Prox Ops are scheduled return to OFF State. FEEDER 1 RSCAT Operational Activate :30 RSCAT-RESOURCE-TRACK (ESA-XCMU)* A DIB computer starts and opens switches to disable Seawinds, SES, TWTA, and SAS. SPX4UNBERTHSPX4UNBERTH :30 PRO-RS SPX4 ACT-CMD (ESA-XCMU)* RSCAT-PD ACT-CMD :30 PRO-RS SPX4 DACT-CMD RSCAT-PD DACT-CMD RSCAT-HTR RES-TRACK FEEDER 1 RSCAT Operational Deactivate :30

Baseline Review 05/20/14 PARC/Martha Cash Crew POIC Commanding External Activities Unattended Time Critical RapidScat Initial Startup After Installation V-Band Release-ONE TIME ONLY *If concurrent EVA, EVR, or Prox Ops are scheduled return to OFF State. RSCAT-RESOURCE-TRACK If the V-Band does not release during initial activation: reattempt V Band Release after 45 minutes. Otherwise, abort. 45 minutes 1:30 PRO-RSCAT ACT-CMD RSCAT-PD ACT-CMD 1:30 B Go To CAL/VAL RSCAT-HTR RES-TRACK 20 min 0:15 PRO-RSCAT VBD-CMD 2:00 RSCAT-PD CONFIG-CMD 1:00 PRO-RSCAT UPLNK-CMD FEEDER 1 RSCAT Operational Activate :30 (ESA) ESA-RSCAT-ACT

Baseline Review 05/20/14 PARC/Martha Cash 1:30 PRO-RSCAT ACT-CMD RSCAT-PD ACT-CMD Crew POIC Commanding External Activities Unattended Time Critical 1:30 RapidScat Nominal Instrument Power ON Sequence *If concurrent EVA, EVR, or Prox Ops are scheduled reference Flight Rules to ensure constraints are met. FEEDER 1 RSCAT Operational Activate :30 (ESA) ESA-RSCAT-ACT B Go to CAL/VAL or nominal ops 2:00 RSCAT-PD CONFIG-CMD 1:00 PRO-RSCAT UPLNK-CMD RSCAT-RESOURCE-TRACK RSCAT-HTR RES-TRACK D

Baseline Review 05/20/14 PARC/Martha Cash Crew POIC Commanding External Activities Unattended Time Critical PRO-RSCAT DACT-CMD* RapidScat Instrument Power OFF Sequence *If concurrent EVA, EVR, or Prox Ops are scheduled reference Flight Rules to ensure constraints are met. ** Will Depend if reactivating or returning home FEEDER 1 RSCAT Operational Deactivate* :30 (ESA) 1:30 RSCAT-PD DACT-CMD* ESA-RSCAT-DEACT C Go to Deactivate RSCAT-HTR RES-TRACK RSCAT-RESOURCE-TRACK D E Go to Heater Deact OR** Go to Nominal Instrument Power ON Sequence

Baseline Review 05/20/14 PARC/Martha Cash RapidScat Calibration and Validation ~30 days Crew Commanding Additional Activities Unattended Time Critical RSCAT-OPERATIONS-CMD 1:00 PRO-RSCAT FILE-CMD* RSCAT-RESOURCE-TRACK B C Go to Deactivate CAL/VAL or nominal ops *Scheduled X number of hrs out. ~3:00 p.m. CDT ± xxxxx

Baseline Review 05/20/14 PARC/Martha Cash RapidScat NOMINAL OPERATIONS Crew Commanding Additional Activities Unattended Time Critical 1:00 PRO-RSCAT FILE-CMD RSCAT-RESOURCE-TRACK B C Go to CAL/VAL or nominal ops Go to Deactivate

Baseline Review 05/20/14 PARC/Martha Cash Crew POIC Commanding External Activities Unattended Time Critical RapidScat HEATER Deactivation E RSCAT-HTR RES-TRACK FEEDER 2 RSCAT Heater Deactivate :30

Baseline Review 05/20/14 PARC/Martha Cash RapidScat IMAGERY Crew Commanding Additional Activities Unattended Time Critical RSCAT-EXTERNAL-VIDEO* (JSC) *External video image survey once every 6 months until hardware is removed. **Still photos of RapidScat from ISS window view.

Baseline Review 05/20/14 PARC/Martha Cash Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Crew Roll-up Notes EO10-PPO Baseline Review I /20/140.0I39-40 Working vs 5/13/14External payload – No ISS crew activities. RapidScat PPO Change Log *Crew Roll-up is not maintained real-time.