Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.

Slides:



Advertisements
Similar presentations
Water Distribution Systems – Part 1
Advertisements

DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
Water is Life: Upgrading Our Infrastructure to Serve You Better.
May 30, Meeting & Outreach efforts  February 27th – Proposed Compensation Plan Distributed to Joint Admin/WWOC  March 5th – Joint Admin/WWOC Meeting.
Copyright Rehmann Robson Pennfield Charter Township Water and Sewer Utilities Rate Study.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Leak Detection at C.C.W.A.. History of C.C.W.A. CCWA produces up to 39 million gallons a day of potable water. We have a potable water storage capacity.
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Technical Review Needed Fire Flow Analysis Developer Services Summit November 16, 2010 Engineering - Asset Planning Joe Dugandzic, PE.
2014 Budget Department Presentations Infrastructure Funding Options.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
1 Emergency Financial Response: Drought Rates May 15, 2014.
Overview of System Development Charges Presented to the Ad Hoc Committee on Large Diameter Water Mains by Chris Cullinan, Acting CFO January 8, 2014.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
Page: Water and Wastewater Rate Study and Financial Forecast Council Presentation City of Cottonwood July 2009.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
Long Beach Water Department Review of FY 12 Budget.
Hawkin s Delafield & Wood LLP PARTNERSHIP GUARANTEES TO ENHANCE WATER CONSERVATION Presented by Rick Sapir (973) Presented.
Best for the Buck: Using Asset Management for Project Design at Highline Water District Matthew J. Maring, P.E. April 30, 2008.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
1.Projects 2.Rates 3.Projects and Rates Today’s Presentation:
Winchester Municipal Utilities 2009 Rate Plan April 9, 2009.
1 Public Hearing User Rate Adjustments April 8, 2008.
Nassau-Amelia Utilities FY 2008 Utility Rate Study Presented by: Andrew J. Burnham July 9, 2007 Nassau-Amelia Utilities.
Commission Meeting November 18, 2015 WSSC Customer Use and Pricing.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Presentation for a W ATER R ATE S TUDY Chris Fisher Jeff McGarvey Tony Thrasher CITY OF SOLEDAD, CALIFORNIA Presented by.
By: Eng. Ayman Afifi March Water Consumption The consumption or use of water, also known as water demand, is the driving force behind the hydraulic.
RATE ANALYSIS FY FY 2019 March 6, 2014 CARSON VALLEY WATER UTILITY FUND 326 – DEPARTMENT 864.
Foxfire Village Water Service from Moore County Foxfire Village Council Meeting April 11, 2013.
Kevin Burnett Presented by CITY OF TULARE, CALIFORNIA.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
What are they and how are they calculated? May 2015.
Global Service Provider Buildings Energy Environment Transportation Water Water and Wastewater Rate Study Village of Villa Park, Illinois Presented to.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
WATER SYSTEM WORKSHOP February 27, 2012
May 31, 2016 WATER & SEWER RATE STUDY PRESENTATION 5/9/2016 City of Greenfield, California.
Water Supply Municipal Water Demand Civil Engineering Department Faculty of Engineering and Technology The University of Jordan Instructor: Ghada Kassab,
Lecture (11): Water Distribution Systems
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
City of Petersburg Water and Wastewater Rates
Water and Wastewater Rates
Water & Wastewater Capacity Charge Work Shop
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Final Rate Study Findings
Rate Increases: Reasons Methods.
City of Sisters, OR 2017 Water & Sewer Rate Study
Joshua Basin Water District Draft Findings & Rate Scenarios
Water & Sewer Rate Study Presented by: Chris Gonzalez, Project Manager
City of Lebanon, Missouri Electric Department
City of Roundup, Montana
City of Sunrise Wastewater Reuse Program
2018 Water/Wastewater Rate Study and Financial Forecast
Presentation transcript:

Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015

Water System Master Plan 2

3 Water System Master Plan – Services Performed ► Current and future operations were examined for cost saving opportunities ► Well, treatment plant, and storage facility capacities were assessed ► Raw and treated water quality data was reviewed against regulatory requirements ► The City’s water distribution system was analyzed for improvements related to: ► Hydraulic deficiencies ► Water main break history

Water Consumption 4 Findings & Recommendations ► In 2013, total daily average water billed was 3.06 million gallons per day (mgd) 83.29% Residential Non-Residential ► Equates to 64 gallons per population equivalent per day ► Gallons billed: 1.12 billion (3.06 mgd) ► Gallons produced: 1.22 billion (3.33 mgd) ► 8.17% water is unaccounted for Slightly high due to water main break Reasonable compared to other communities

Water Supply 5 Findings & Recommendations ► 6 deep water supply wells ► 3 shallow water supply wells ► Firm capacity of wells is 7.6 mgd (total capacity with largest well out of service) ► Projected Maximum Day Demand based on population projections is 6.48 mgd ► Existing wells are adequate to serve existing population and projected population ► Recommended rehabilitation of all of the City’s wells

Water Treatment 6 Findings & Recommendations ► Raw water is generally good quality ► Low turbidity ► Low TOC ► High hardness ► Moderate iron and ammonia ► Detectible radium (3 to 11 pCi/L) ► Hardness reduced from 17 grains per gallon to 8 grains per gallon ► Radium reduced to less than 5 pCi/L ► The City is using the most economical treatment approach for current needs ► Replacement of zeolite media is recommended & required

Water Storage 7 Findings & Recommendations ► 4 elevated water storage tanks ► Combined storage volume of 5.75 million gallons ► Projected Maximum Total Required Storage Volume based on population projections is 4.80 million gallons ► Existing storage is adequate to serve existing population and projected population ► Recommended repainting of 3 water towers (East Water Tower completed in 2014)

Water Distribution 8 Findings & Recommendations ► 177 miles of water main from 3 to 24 inches in diameter ► 2,400 fire hydrants ► 2,949 valves ► 10,974 service lines ► Projected 2034 demand: ► Average day: 4.32 mgd ► Maximum day: 6.48 mgd ► Peak Hourly Max Day: mgd ► 2 conditions used to identify need for improvements: ► Hydraulic deficiencies ► Water main break history

Water Distribution Modeling & Break History 9 Findings & Recommendations ► Modeling found that no locations in the City experience static water pressures less than 35 psi ► Several locations throughout the City experience fire flows less than 2,000 gallons per minute at a residual pressure of 20 psi ► A significant amount of 4-inch and 6-inch diameter water mains result in significant pressure losses during fire flows ► Water main break records were analyzed to identify mains for replacement due to higher than normal break records ► Water mains with more than 3 break records in the previous 10 years were identified for replacement

10 Locations with Less than 2,000 gpm Fire Flow

11 Replacement Due to Breaks Replacement Due to Hydraulic Restrictions

Water Distribution Recommendations 12 Findings & Recommendations ► Replace approximately 55,184 feet or 10.5 miles of water main to alleviate hydraulic issues and replace water mains that have a history of breaking ► Complete main replacement over a 30-year period ► Construct all new water mains in the City a minimum of 8-inches in diameter ► Develop a comprehensive water main replacement program that extends beyond the scope and timeframe of this Study ► The plan should: ► Provide a working schedule to replace the entirety of the water distribution system ► Identify the amount of water main to be replaced per year ► Take into consideration water main diameter, age, break history, and relative importance of each pipe

13 10-Year Capital Improvement Plan Summary Water System ComponentEstimated Cost Water Supply Well Rehabilitation$480,000 Water Treatment Improvements$886,000 Water Tower Recoating$1,900,000 Water Main Replacement$9,868,000 Total Estimated Capital Cost$13,134,000 ► Costs presented are in addition to items already identified by the City such as O&M and other miscellaneous projects ► Costs presented in 2015 dollars without inflation

Water System Rate Study 14

15 Rate Study Process

16 Typical Bill Competitiveness – Existing Rates ► Among other Illinois communities, DeKalb’s existing water rates are reasonably positioned.

17 Key Assumptions ► No forecast growth in customer accounts or usage ► CPI-U: 1.5 percent ► General Utility Inflation: 3.0 percent ► New Debt Terms: 20 years, 2.5 percent interest rate ► Operating Reserve: 25 percent of costs ► Capital Reserve: $1M

18 Water Rate Revenues by Class ► Revenues under existing rates are forecasted to remain at current level

19 Funding the Capital Plan ► Total $18.5M CIP $8.3M Facilities $10.2M Main R&R Program ► Three IEPA loans anticipated ► Funded 81% pay-as- you-go, 19% debt

20 Revenues Under Existing Rates not Sufficient to Meet Requirements

21 Recommended Revenue Adjustments ► 4.5% increases for FY16 through FY20; returning to CPI-U in FY21 ► Proposed increases less than industry averages ► Provide adequate funding to meet DeKalb’s water utility needs

22 Other Scenarios Considered ► Alternative scenarios included: Scenario 2: 8.5% revenue increases in FY2016 & FY2017; considered difficult to implement Scenario 3: 4.0% revenue increases FY2016-FY2021; does not fully fund CIP

23 Proposed Rates ► Maintains current rate structure ► Increases FY16 revenues 4.5 percent

24 Impact of Proposed Rates on Typical Bills ► Increase at different usage levels varies slightly ► Provides overall desired increase in FY16 revenues

25 Typical Bill Competitiveness – Proposed Rates ► Among other Illinois communities, DeKalb’s proposed FY16 water rates maintain competitive position

QUESTIONS?

28 National Trends in Water Rates ► Source: BLS CPI-U & CPI: Water and Sewer Maintenance Series Average Water & Sewer Index Increase: 5.5 %/yr Average CPI-U: 1.5 %/yr Last Five Years:

29 Master Plan & Rate Study CIP Assumptions ► Master Plan costs are stated in 2015 dollars; 3% inflation applied for rate study purposes. ► In addition to Master Plan costs, there are additional project costs primarily in: Water main improvements Meter replacement Fleet/equipment replacement