Building Permit Contractor Round Table 8731 Citizens Drive New Port Richey, Florida Wednesday – July 10, 2013 2:00 pm to 4:00 pm.

Slides:



Advertisements
Similar presentations
Brevard County Licensing Regulation & Enforcement
Advertisements

BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/BECU 1 BUILDING ENERGY CODES UNIVERSITY ANSI/ASHRAE/IES Standard Scope and Application April.
How you can become a licensed contractor. Step # 1 Know The Law First and most importantly, it is against the law to work in the construction trades without.
Green Building Ordinance Transportation and Environment Committee
Lessons Learned An Architectural Perspective April 21, 2005 René Tercilla, AIA, REFP Tercilla Courtemanche Architects, Inc.
December 9, 2014 San Diego County Office of Education ESFG Meeting Tyree Dorward:Attorney, Best, Best, & Krieger Guiselle Carreon: Commercial Warrants.
Pipeline Operator Qualification Regulations 49CFR Part 192, Subpart N (Gas)49CFR Part 192, Subpart N (Gas) 49CFR Part 195, Subpart G (Liquid)49CFR Part.
Summary of Customer Service Rules for Low-Income Electricity Customers Paul Gasparatto Policy Advisor.
Bonding Requirements For Gas Piping Systems Bob Torbin October 2007
Manufacturing Engineering Residential Electrical Controls and Wiring Copyright © Texas Education Agency, All rights reserved. 1.
SQA Examinations 2013 The Waid Academy 1 Essential Information & Guidance for Candidates.
General Fee Schedule Annual Update Fiscal Year 2014 Finance Committee/City Council June 3, 2013.
4th Quarter Contractor Business Meeting December 5 th, 2014 Yesika L. Kain Plant Engineering Facilities Session.
Retirement Home Regulated under the Retirement Home Act, 2010.
Meet the DBI Pros Summit October 25, 2006 Amy Lee, Acting Director CONDO CONVERSION.
Competitive Retailer Relations CR Workshop AEP Overall.
1 IAEI International Low Voltage DC Workshop Low Voltage DC Workshop Presented by: David Clements Presented by: David Clements IAEI International Low Voltage.
Welcome to the Learning Community 2015 Roll out webinar Hosted by the Family Institute for Education, Practice & Research The webinar will begin shortly.
Bidstreet’s Distributor Agent Program BidstreetUSA.com, LLC 801 International Pkwy., 5th Floor Lake Mary, FL Tel: Cell.
Massachusetts New Homes with ENERGY STAR ® The sponsors of the Massachusetts New Homes with ENERGY STAR are Bay State Gas, Berkshire Gas, Cape Light Compact,
Business Equipment Property Tax Relief Programs BETR / BETE Maine Revenue Services Property Tax Division August 2, 2007.
Date: __________________ Grade Fall 2013: _______________ Student’s Name: ______________________ ______________________ ______ Birth Date: ________ Student.
Construction Defect Mitigation Construction Cost Recovery Construction Litigation Consultants, LLC Jerry Peck Slide 1 of 12 slides / Total.
DTE Energy Commercial & Industrial Energy Optimization Program Energy Efficient, Sustainable Detroit DTE Energy Headquarters December 9, 2010.
2 California Solar Initiative Latest Handbook Changes The slides for today’s presentation can be downloaded/printed at
1 ENCO Utility Services How Could a Boulder Municipal Utility Run Its Electric Distribution System? June 1, 2011 Boulder, Colorado
Bellringer What happens when you turn the lights on? What allows lights to be turned on and off? Write your answer or draw an explanatory picture for later.
Florida ePermits Working Group Meeting Thursday, April 16, 2015 ePermits Working Group Meeting Wednesday, July 22, 2015.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Energy efficiency program changes not associated with the Post 2011 process Phone: 1 (877)
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Ratepayer and Customer Rights Energy Regulatory Partnership Program Abuja, Nigeria July 14-18, 2008 Presented by Robert W. Kehres.
Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
MONTGOMERY COUNTY FIRE & RESCUE FAMILY CHILD CARE FIRE SAFETY NOTEBOOK Written By: M/FF Matt Kelleher 2008.
C U S T O M E R D R I V E N. B U S I N E S S M I N D E D. Department of Licensing & Regulatory Affairs Bureau of Construction Codes Keith E. Lambert, P.S.,
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
MARS Taskforce RMS Update April 12, Initial Settlement As of April 5, 2011 Operating Date: March 29, 2011 AMC ESI ID Totals: 2,601,788 AMDG ESI.
Permit Process & Application Guide
Non-Ferrous Founders’ Society Safety & Health Training Program Hazard Communication/GHS Training Program Section 1: Worker’s Rights under OSHA © 2015 All.
Williamsburg County Williamsburg County Assistance available to Citizens impacted by the 2015 Flood.
DUAL FUEL HEAT PUMP REBATE APPLICATION Name:__________________________________________ Co-op Account #_________________________ Address where appliance.
Building Permit Contractor Round Table 8744 Government Drive New Port Richey, Florida Wednesday – May 8, :00 pm to 4:00 pm.
CEO Report LEO Meeting Board Meeting
R-5BCS Building Construction Services Department 2015 Adjusted Fee Schedule Resolution Stabilization of Commercial Building Permit Fee Multiplier.
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
Cleaner power, building and equipment protection and a minimum kilowatt reduction of 10% (savings). No out of pocket cost option, trial period, easy installation.
Low-Income Energy Assistance Program (LEAP) Lenore Dougan, Policy Advisor Regulatory Policy Ontario Energy Board Presentation to the Rental Housing Advisory.
BUDGET PROCESS & REVENUE & EXPENSE INFORMATION For FISCAL YEAR 2011.
Nyc Build it back RFB Furnishing All Labor and Material Necessary and Required for residential construction services July 24, 2017.
Marquis Hills Area Information Meeting December 7, 2016
Home Energy Savings Program Wyoming
Marquis Hills Area Information Meeting December 7, 2016
Global Connections Day Building Safety Service Provider
Department of Buildings
Annual Inspection Certification Program
Facilities Services The Facilities Department is responsible for the overall management & maintenance of the buildings & grounds at the University of.
Melanie Halsan, PALS Warner Web, Fire Marshal
BUILDING INSPECTION Amy Link, Assistant Director of Development Services Ken “KC” Crow, Building Official Lisa Mann, Office Manager.
“How you can become a licensed contractor”
Bellringer What happens when you turn the lights on? What allows lights to be turned on and off? Write your answer or draw an explanatory picture for later.
Contractor Licensing Board
E-permits Tutorial for first-time users
City of Marathon Vacation Rental Training Session
Enhanced Unitary HVAC Maintenance Tune-Up Program
City Council Meeting November 14, 2016
State Electrical Division North Carolina Department of Insurance
Outagamie County Pre-Proposal Meeting
North Carolina Department of Insurance Office of State Fire Marshal
INDEPENDENCE POLICE DEPARTMENT
Presentation transcript:

Building Permit Contractor Round Table 8731 Citizens Drive New Port Richey, Florida Wednesday – July 10, :00 pm to 4:00 pm

Statistics AprilMayJune Applications Permits NB N2B

Online Permits AprilMayJune Air Conditioning Change outs Re Roofs554 Ground Settlement Water Heaters Electrical83420

Statistics Single Family Homes Issued

Turn Around Time As of July 3, 2013 Residential Site Review working on applications submitted June 27, 2013 (five working days). Plan Review working on applications submitted June 14, 2013 (nine working days).

Number of Inspections Performed AprilMayJune Structural Electrical Mechanical Plumbing

Number of Inspectors AprilMayJune Structural888 plus (one Vacant) Electrical555 Mechanical555 Plumbing333

Over Time June 2013 HoursCost Permitting 66.00$ 1, Plan Review 37.00$ 1, Inspections 14.00$ Total117.00$ 3,111.53

Inspections Continued April

Inspections Continued May

Inspections Continued June

Roll Overs AprilMayJune Structural Electrical3353 Mechanical12511 Plumbing5948

Mechanical Code Changes & Related Inspections

Review Continued vs. Failed Inspections

Model Center Industry providing a suggested work flow for review and discussion EJR-MUN-MISC MEMO-model center- site plan-process-w-charts.pdf

Utilities Billing / New Service Accounts

TUG Service Duke Energy, WREC power companies will require the following: Addresses must be posted on building or mailbox. House to be substantially completed. Devices below 8’ trimmed or blanked off and above 8’ capped off. Wires not completely installed shall not be connected to breakers. Building shall be lockable and all openings sealed. (Temporary covering is acceptable). Air conditioning equipment shall be installed and connected. Breakers for condenser and air handlers shall be marked.

Flat Roof Applications

Low Voltage Legislative Changes to Low Voltage Alarm Permits

Key Points in Florida Statute regarding Low voltage alarm permits: Definition per of low voltage alarm is any electrical device, signaling device used to detect burglary, fire, robbery, or medical emergency. This section does not apply to the installation or replacement of a Fire Alarm if a plan review is required. (Commercial Fire) Effective date –October 1 st, A local enforcement agency (Pasco County) shall make available a permit label for purchase for $55.00 for installation or replacement of an existing alarm system. Until January 1 st permits that cost more than $55.00 can be charged at the usual amount up to $ A local enforcement agency may not require a contractor, as a condition of purchasing a label, to submit information other than identification information of the licensee and proof of registration or certification as a contractor (No plans, address etc. required).

Key Points in Florida Statute regarding Low voltage alarm permits: A label is good for one year. Must be posted in a conspicuous place before commencing work. Notice of commencement is not required. Contractor must notify Agency within 14 days of completing work filing a Uniform notice of low voltage alarm system project of completion. A local enforcement Agency (Pasco County) may take disciplinary action against a contractor who fails to timely submit a Uniform notice of low voltage alarm system project. A low voltage alarm system may be inspected by the Agency (County). If a low voltage alarm system fails an inspection, the contractor must take corrective action as necessary to pass. Basically for Pasco County this permit would be used for Commercial burglar alarm systems only as we do not permit low voltage residential electric.

B.C.S. Customer Service Action Plan

1. Residential Walk-Through Permitting Start with Residential Accessories Next: New Residences Plans on File Last: New Residences up to 5,000 sq. ft. NPR Only - 5 Days a week – 8:00 am to 3:30 pm

2. Commercial Walk-Through Permitting Limited to reasonable projects – interior remodels/build outs, small additions, alterations. All Trades Represented – B.E.M.P. Site and Fire NPR only - 5 Days a week – 9:00 am to Noon

Contact Inspector By Cell Phone Inspector Cell Phone numbers distributed last Roundtable Now – callers to BCS are given inspector’s cell numbers Inspector Cell Phone number will be on the Web Shortly – Inspectors starting day in vehicle with work downloaded and cell phone contact available.

Accela Industry providing a copy of suggested or desired programming from other jurisdictions

Building Construction Services Calendar Information will be available within the Calendar on the web site.

Future Topics Desired discussion topics for future meetings.

Next meeting is scheduled for August 14, 2013 at 8731 Citizens Drive, West Pasco Government Basement Training Room

Thank you for your attendance.