Unit 17 Building Regulations Assessment Number 2 Date of issue : April 21 st 2015 To be submitted by: May 19 th 2015 This assessment provides an opportunity.

Slides:



Advertisements
Similar presentations
Office Alterations RAF/2012/00027 Compulsory Briefing Session 01 October 2012 RAF – EcoGlades Centurion.
Advertisements

Proposal Evaluation Teams Presented by: Dana Hollingsworth Office of General Counsel The University of Texas System November 4, 2009.
Welcome to Energy efficiency for gas-fired and oil-fired domestic heating and hot water systems Session A: Course introduction.
Assignment 5: Monitoring Healthy Body Systems
Michael Martin - Cert IV - Codes and Standards 2012
COMPULSORY BRIEFING SESSION Office Space for the RAF Johannesburg branch RAF /2014/00029 Date: 21 November 2014 Time: 11:00.
Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
Enterprise Project Portfolio Management Solution RAF/2014/00012 Compulsory Briefing Session 31 March 2014 Centurion.
Welcome to the Orientation for ENGLISH FOR CAREERS To view this presentation, just click the right arrow button to go to the next slide or the left arrow.
Planning Permission Process and Procedures
Provider Training Request for Proposal Spring 2000 Bureau of Contract Management Department of Human Services.
Lesson One – Introduction & History
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00010 & RAF/2015/00011 Date: 18 June 2015 Time: 11:00.
ASPEC Internal Auditor Training Version
Quality Representative Training Version
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009 Date: 26 March 2014 Time: 11:00.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
1 Licensing Scheme for Drug Dependent Persons Treatment and Rehabilitation Centres.
PGCE Full-time SE3 Briefing March Aims Be aware of the expectations of SE3 Understand what is expected of you during the block experience Understand.
How to Succeed on the NRAH Poster Project (font size = 24 pt) Sarah Vonhof, Marisa Murdock, and Amanda Klein (font size = 16 pt) Course Title and Date.
COMPULSORY BRIEFING SESSION Maturity Assessment and implementation recommendation for ITIL V3, COBIT 5 and KING III Chapter 5 RAF /2015/00016 Date: 04.
Institutional Review Board (IRB) Human Subject Dr. John N. Austin, Director and Ms. Renee S. Jones, Associate Director Delaware State University Office.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008 Date: 24 March 2014 Time: 11:00.
LERC/OEE Lean Accreditation Scheme Level 1c Evidence Portfolio
Learning Objectives LO5 Illustrate how business risk analysis is used to assess the risk of material misstatement at the financial statement level and.
IT 499 Bachelor Capstone Week 4. Adgenda Administrative Review UNIT three UNIT Four Project UNIT Five Preview Project Status Summary.
HISTORY Internal Assessment. Scope of the historical investigation You are required to:  undertake a historical investigation using a good range of historical.
The new VicSmart process and provisions. What is VicSmart? VicSmart is a fast planning permit process A decision is expected to be made in 10 days All.
Capstone Project Phase Two! Design Phase – Functional Specification Document.
Technology Page 2 TIME LINE – Technology Development In the boxes below stick in images of mobile phones to show the development of the product over time.
WELCOME MESSAGE! Welcome to your distance learning Preparing to teach in the Lifelong Learning Sector (PTLLS) COURSE, my name is Prisca Kennedy and I am.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(IV) Date: 23 June 2015 Time: 14:00.
COMPULSORY BRIEFING SESSION Enterprise Wireless Solution (Wi-Fi) RAF /2015/00022 Date: 18 January 2016 Time: 11:00.
Access Grading Briefing Assessment requirements. Why these requirements? To ensure that: grades, credits and Access to HE Diplomas are awarded on an equivalent.
Level 2 Unit 1 Exploring the Engineering World Engineering Diploma Level 2 Unit 1 Exploring the Engineering World An Approach to Unit Delivery and Assessment.
Building Act Post Moratorium Reforms Occupancy Certification System Department of Lands, Planning and the Environment May 2016.
Responding to Invitation to Tenders Michael Fowler Category Manager – Procurement Brian Davies Senior Procurement Officer.
Unit 17 Building Regulations Assessment Number 3 Date of issue : June 5 th 2015 To be submitted by: June 26 th 2015 This assessment provides an opportunity.
Student name: ………………………………………….…. Course of study: (Please tick)  National Award (pt)  National Award (ft)  Extended Diploma (ft) Unit 1 Health, Safety.
UNIT 5: NON EXAMINED ASSESSMENT PRESENTATION JANUARY 2016 This presentation has been amended following the publication of the revised JCQ regulations for.
Campus Turnaround Plan Webinar JANUARY 25, 2016 TEXAS EDUCATION AGENCY.
M253 Students Study Guide Mrs. Fatheya Al Mubarak – AOU Dammam.
Module Code : AURH453 Management Principles Assessment Number 1 (a) Nature of Industry In the form of an illustrated written report Weighting : (part)
SEC 420 UOP professional tutor / sec420dotcom.  SEC 420 Entire Course (UOP)  SEC 420 Week 1 DQ 1 (UOP)  SEC 420 Week 1 Individual Assignment Responsibilities.
SEC 420 Entire Course For more classes visit SEC 420 Week 1 Individual Assignment Responsibilities of Personal Protection Officers.
Student name: ………………………………………….…. Course of study: (Please tick)  Subsidiary Diploma(pt)  Extended Diploma(ft)  Diploma (ft Yr 2) Unit 51 Civil Engineering.
Student name: ………………………………………….…. Course of study: (Please tick)  Subsidiary Diploma(pt)  Extended Diploma(ft)  Diploma (ft Yr 2) Unit 51 Civil Engineering.
Unit 17 Building Regulations Assessment Number 1 ‘History and Purpose’ Date of issue : March 23rd 2015 To be submitted by: April 29th 2015 This assessment.
University p&t forum Introductions April 24, 2017.
COMPULSORY BRIEFING SESSION Maturity Assessment and implementation recommendation for ITIL V3, COBIT 5 and KING III Chapter 5 RAF /2015/00016 Date:
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00010 & RAF/2015/00011 Date: 18 June 2015 Time: 11:00.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
ASSESSMENT COVER SHEET
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(IV)
Office Alterations RAF/2012/00027 Compulsory Briefing Session
Enterprise Project Portfolio Management Solution RAF/2014/00020 Compulsory Briefing Session Centurion 15 July 2014.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008
Enterprise Project Portfolio Management Solution RAF/2014/00012 Compulsory Briefing Session Centurion 31 March 2014.
Project Development and Managing your Build Agenda
HCS 455 TUTORS Lessons in Excellence -- hcs455tutors.com.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
Information and Site Visit for tender: “supply and installation of furniture and related services” EIOPA/OP/50/2014 Frankfurt, 12 May 2014.
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Information and Site Visit for tender: “supply and installation of furniture and related services” EIOPA/OP/50/2014 Frankfurt, 12 May 2014.
Information Technology
Introduction Fact-Finding Meeting Proposal Meeting
North Carolina Department of Insurance Office of State Fire Marshal
Unit No.5: Working with Parents and Others in Early Years
FINAL YEAR PROJECT BRIEFING
Presentation transcript:

Unit 17 Building Regulations Assessment Number 2 Date of issue : April 21 st 2015 To be submitted by: May 19 th 2015 This assessment provides an opportunity to complete the criteria described in the shaded boxes below. Please refer over the page for the assessment tasks you will need to do to satisfy the criteria identified. Signed: Date: Tutor Signed: Date: IV pre-issue Signed: Date: IV post-assessment Please turn over for assessment tasks…….. Achieved? 1stfinal P1Examine the factors that have influenced the historical development of building control and explain their significance P2Discuss the legislation and documentation associated with building control and their application P3Identify the various Approved Documents that comprise the building regulations P4Describe the application and enforcement of the Building Regulations P5Explain the approval procedures used in Building Control P6Evaluate the documentation used to support Building Control applications. P7Discuss the powers of local authority Building Control officers and approved inspectors P8Produce a specimen Building Regulations application, with all necessary documentation M1Explain the particular implications of the Building Regulations for low rise domestic and commercial construction M2Propose answers to two queries related to the interpretation of the Building Regulations M3Explain the procedures used to enforce the Building Regulations D1Justify the proposed solution to two separate Building Regulation issues D2Evaluate the specimen Building Regulation application, with all necessary documentation Student name: ………………………………………….…. Course of study: (Please tick)  Extended Dip. in Const. (ft)  Diploma in Const. (pt) tutor Jamie Owens

Unit 17 Building Regulations Assessment Number 2 T his assignment is intended to further develop your understanding of the Building Regulations and the application of the regulations in mixed use, low rise domestic and commercial construction. Scenario : You have been employed as a construction consultant to manage the refurbishment and part new build project of mixed use project on behalf of your client, a Property speculator. The Ground and 1 st floors are to be given over to office / retail space with the 2 nd floor given over to residential accommodation in the form of flats. Part of the refurbishment works include: Rewiring of electrical circuits, including new installations Addition of a number of bathrooms – both in the residential areas and commercial areas. Blocking up of a number of internal doorways and forming openings in structural walls. Your Client is unsure what the Building Regulations are and why they have to apply for Building Regulation approval for the proposed works to the scheme. In your capacity as Consultant on the Project, you have been asked to provide a report and presentation to your Client and his team to provide further information on the Building Regulations. Tasks; 1.Identify 6 (six) of the Building Regulations Approved Documents and provide a brief summary of each under separate headings (P3) 2. In the form of an ‘in class’ presentation of no more than 6 slides and 5 minutes duration: (ensure that you submit your slides and summary of each slide with your assignment on 1 sheet of A4 paper). i.Describe how the Building Regulations are applied in practise and how they are enforced in the event of non compliance (P4) ii.Explain the Building Regulations approval procedure process from a Client’s initial application to building control (P5) 3. Using Building Regulations ‘Approved Document A (Structure)’ (provided on Moodle), evaluate the document for simplicity, ease of use from the levels of information provided. (P6) 4. The Project Design team have requested your input to help specify the ‘Fire Compartmentation’ system and the ‘Fire Stopping’ system between the Commercial and Residential areas of the building. Your client is also unsure of the differences between ‘Fire Compartmentation’ and ‘Fire Stopping’. Explain the differences between the two and Specify, suitable systems to satisfy the requirement of the relevant Building Regulation(s). (M2)

Authenticity; I certify that the work I have submitted for this assessment is entirely my own and that all other material has been properly referenced. Signature;………………………………………………………………………… name;………………… ……… Date;…………………………. Nb: If anything written or illustrated is not your own work you must provide footnotes to identify the reference source/s (book, website, handout etc.) you have used. Submit your illustrated written report through the reception window on or before the submission date, with this sheet at the front. Your work should be attached ‘behind’ this sheet, with the authenticity statement (at the bottom of this page) acknowledged by signature.